Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Mike Montes 360 Roofing

San Antonio,TX

Summary

Dynamic Contract Roofer with extensive experience at Dr Horton, specializing in roof installation and repair. Proven ability to lead teams effectively while ensuring safety compliance and high-quality workmanship. Skilled in problem-solving and customer communication, consistently delivering projects on time and under budget. Fluent in Spanish, enhancing client interactions.

Overview

32
32
years of professional experience

Work History

Contract Roofer

Dr horton
San Antonio , TX
06.2006 - 03.2024
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Eliminated project lags by organizing work-in-progress and delegating tasks.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Cut and shaped roofing material to fit specific areas of the roof structure.
  • Set up ladders or scaffolding to safely access roof.
  • Resolved labor, design and tool issues during construction projects.
  • Installed asphalt shingles, and other types of roofing products.
  • Removed old roof coverings prior to installation of new ones.
  • Operated power tools such as saws, drills, and nail guns safely and efficiently.
  • Repaired damaged roofs using appropriate tools and techniques.
  • Understood how to operate and maintain job site equipment safely and for maximum productivity.
  • Maintained change order status log, informing accounts receivable of pending and approved change orders.
  • Cleaned up debris from job sites daily upon completion of each project.
  • Adhered strictly to relevant industry standards while carrying out all tasks assigned.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Planned, organized and oversaw daily activities of multiple production crews.
  • Maintained accurate records related to job costs and labor hours spent on each project.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Displayed high standards for quality workmanship and routinely double-checked work.
  • Ensured that all safety protocols were followed during roofing operations.
  • Installed flashings around chimneys, skylights, dormers, ridges, valleys, walls, vents and other protrusions in order to prevent water leakage into the building's interior space.
  • Created work crew schedules and delegated assignments.
  • Followed manufacturer specifications to remove old roofing materials and install new roofs.
  • Sealed exposed nails with caulking or sealant after completing work on each section of the roof.
  • Worked regularly at advanced heights and followed all OSHA safety protocols and procedures for fall prevention.
  • Inspected roofing materials for defects and damages.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Assisted in the preparation of cost estimates for roofing projects.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Applied plastic coatings and membranes, fiberglass or felt over sloped roofs to prepare for shingle installation.
  • Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
  • Communicated clearly and reliably with foreman and crew leaders, highlighting safety concerns and detailing project progress.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Repaired and replaced roof membrane, sub roofing, sheathing and base materials.
  • Verified measurements with a tape measure before cutting materials to size.
  • Communicated regularly with clients about progress updates throughout the duration of each project.
  • Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles.
  • Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
  • Ensured that all necessary permits were obtained prior to beginning any project.
  • Maintained and repaired roofing tools and equipment.
  • Conducted regular maintenance checks on existing roofs to identify any potential problems or hazards.
  • Checked slopes of decks for proper drainage before laying down underlayment or other materials.
  • Participated in all phases and types of commercial roofing.
  • Completed day-to-day duties accurately and efficiently.
  • Approached customers and engaged in conversation through use of effective interpersonal and people skills.
  • Provided excellent service and attention to customers when face-to-face or through phone conversations.
  • Managed inventory and supplies to ensure materials were available when needed.

Contract Roofer

Gordon Hartman homes
San Antonio , To
01.1998 - 03.2004
  • Measured and cut materials according to specifications with hand tools such as hammers, saws, chisels.
  • Removed old roof coverings in preparation for new installations.
  • Collaborated with team members on large scale projects requiring multiple workers.
  • Climbed ladders and scaffolding to reach roofs for inspection, repair, or installation.
  • Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Adhered strictly to OSHA standards while performing duties on construction sites.
  • Installed felt , shingles , and other materials to construct roofs.

Roof Contractor

Highland Homes Roofing
San Antonio
01.1992 - 04.1998
  • Managed projects with large labor, equipment and material budgets.
  • Minimized waste and negotiated supplier purchases to reduce expenses and maintain cost-effectiveness.
  • Evaluated existing structures for repair or replacement options.
  • Provided guidance and training to new team members as needed in order to meet performance goals.
  • Analyzed bids from subcontractors prior to awarding contracts in order to obtain best value services.
  • Maintained records of all costs associated with each project, including labor expenses, material costs, equipment rentals.
  • Participated in all phases and types of commercial roofing.
  • Worked regularly at advanced heights and followed all OSHA safety protocols and procedures for fall prevention.
  • Received deliveries of supplies needed for job completion at various sites.
  • Loaded and unloaded trucks with building materials required for each job site.
  • Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
  • Attended safety meetings to ensure compliance with all safety regulations.
  • Climbed ladders and scaffolding to reach roofs for inspection, repair, or installation.
  • Adhered strictly to OSHA standards while performing duties on construction sites.
  • Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials.
  • Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles.
  • Removed old roof coverings in preparation for new installations.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
  • Inspected existing roofs for damage or leaks and applied sealants when necessary.
  • Communicated effectively with customers regarding progress updates throughout project duration.
  • Ensured that all working surfaces were clean before beginning each task.
  • Measured and cut materials according to specifications with hand tools such as hammers, saws, chisels.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Repaired and replaced roof membrane, sub roofing, sheathing and base materials.

Skills

  • Roof installation
  • Material handling
  • Roof repair
  • Safety compliance
  • Customer communication
  • Problem solving
  • Self motivated
  • Teamwork
  • Roof insulation
  • Roofing installation
  • Fascia installation
  • Team player
  • Excellent communication
  • Low-slope roofing systems
  • OSHA fall hazard training
  • Effective leader
  • Fluent in spanish
  • Commercial roofing
  • Hand and power tool operation
  • Adhesive application
  • Customer communications
  • Structural repair

Languages

Spanish
Native/ Bilingual

Timeline

Contract Roofer

Dr horton
06.2006 - 03.2024

Contract Roofer

Gordon Hartman homes
01.1998 - 03.2004

Roof Contractor

Highland Homes Roofing
01.1992 - 04.1998
Mike Montes 360 Roofing