Summary
Overview
Work History
Education
Skills
Personal Information
LANGUAGES
Timeline
Generic
MILTHON ESCALERA

MILTHON ESCALERA

Lewis Center,OH

Summary

Automotive Program and project leader driving new-model launches, budget ownership, and direct OEM coordination across 25+ automotive programs. Manages master schedules, engineering changes, supplier communication, and launch readiness to align teams and deliver assigned programs on time against customer requirements.

Overview

19
19
years of professional experience

Work History

Program Manager / Project Lead / APQP Lead

MIDWEST ACOUST-A-FIBER
Delaware, Ohio
03.2022 - Current
  • Led new-model programs from project award through SOP, coordinating product design, tooling development, material readiness, manufacturing process implementation, and launch deliverables.
  • Coordinated cross-functional project execution across Engineering, Purchasing, Logistics, Maintenance, and Production to align resources, manage timing dependencies, and achieve launch milestones.
  • Managed program scope, budgets, product cost tracking, master schedules, customer milestones, stakeholder alignment, supplier communication, and engineering changes.
  • Coordinated automotive programs for Honda (Passport 3BM; Accord 30A and 30B), Toyota (200D, 400D, 650D, 815D), Stellantis (WL, JL, JT, DT, DT BEV, WS, 39, MQ, WD), and Subaru (DA9)
  • Coordinated material deliveries for prototypes and testing, tooling activities, and engineering changes to support launch timing and customer requirements.
  • Served as a direct customer contact for OEMs and used the OEM's supplier portal for program coordination, deliverable tracking, and status communication.
  • Prepared program reviews covering financial KPIs, budgets, product cost sheets with labor, material, and tooling estimates, development and testing costs, capacity, milestones, risks, and escalations. Delivered assigned program launches on time against customer master schedules.

Engineering Coordinator / APQP Lead

MIDWEST ACOUST-A-FIBER
Romita, Mexico
10.2017 - 02.2022
  • Coordinated APQP activities and manufacturing engineering for new-product launches supporting GM (C1UC, GEM, T1XX, D2UC), FCA (MP, DJ), and Ford (CX727), aligning cross-functional deliverables with program timing.
  • Developed and implemented manufacturing documentation, including bills of material, equipment setup specifications, and standardized work.
  • Supported process layout design, production-line balancing, and time-and-motion studies to prepare manufacturing processes for launch.
  • Led continuous-improvement activities focused on waste and scrap reduction, cost savings, and operational efficiency.

Production & Process Engineer

DAIMAY AUTOMOTIVE INTERIORS
01.2017 - 10.2017
  • Supported process design and implementation for GM's K2XX overhead-console new program.
  • Designed manufacturing layouts and logistics solutions, including rack design, storage, and material-routing capabilities; supported material flow and delivery readiness.
  • Developed work instructions, process-flow diagrams, operating procedures, and statistical process-control systems.
  • Implemented FIFO and Kanban practices and supported nonconforming-material controls, PFMEA development, and production-supervisor training.
  • (transition to Midwest Acoust-a-Fiber)

Production Team Leader / Advanced Team Leader

DENSO MÉXICO
12.2013 - 01.2017
  • Managed three final-assembly production lines, people-related activities, production plans, and KPI performance.
  • Applied Lean Manufacturing, 5S, Kaizen, TPM, and the 7 Big Losses approach to improve production performance.
  • Supported Honda, Fiat, and Jeep product launches; worked with PFMEA, Control Plans, SPC, production documentation, and IATF 16949 requirements.
  • Participated in three external IATF-related audits and two environmental / occupational-health-and-safety audits.
  • Developed an assembly-line Kaizen project selected to represent Denso in Honda's international Fall quality-circle competition in the United States; earned third place and an honorable mention for Technical Merit.

Production Manager; earlier roles in Quality, Product Development & Engineering

FUSION URBANA SHOES (MERCA SHOES)
09.2007 - 09.2013
  • Managed production planning, work-in-process inventory, and operational teams; implemented stitching work cells and a semi-automated assembly system.
  • Applied Poka-Yoke and Kaizen methods, worked with suppliers, and supported quality-system activities.
  • Supported new production-line implementation, product testing and approvals, material and labor cost calculations, technical specifications, plant layouts, time studies, and line balancing.

Education

B.S. / Degree - Industrial Engineering

Instituto Tecnológico De León
Leon, Mexico
01-2009

Skills

  • Automotive Program Management
  • APQP / PPAP Certified
  • 25 New programs launched
  • Program budgeting
  • Production readiness
  • Engineering Change Management
  • Tooling & Prototype Readiness
  • Risk Management
  • IATF 16949
  • PFMEA / Control Plans
  • Kaizen
  • SPC
  • IATF Internal Auditor Certified
  • Microsoft Excel, Word, PowerPoint, Project
  • AutoCAD, SpinFire (CAD)
  • SIMAC, MQ1, AIM
  • Customer interface

Personal Information

Title: AUTOMOTIVE PROGRAM MANAGER | NEW MODEL LAUNCH | APQP / PPAP

LANGUAGES

English: Advanced

Native Spanish Speaker

Timeline

Program Manager / Project Lead / APQP Lead

MIDWEST ACOUST-A-FIBER
03.2022 - Current

Engineering Coordinator / APQP Lead

MIDWEST ACOUST-A-FIBER
10.2017 - 02.2022

Production & Process Engineer

DAIMAY AUTOMOTIVE INTERIORS
01.2017 - 10.2017

Production Team Leader / Advanced Team Leader

DENSO MÉXICO
12.2013 - 01.2017

Production Manager; earlier roles in Quality, Product Development & Engineering

FUSION URBANA SHOES (MERCA SHOES)
09.2007 - 09.2013

B.S. / Degree - Industrial Engineering

Instituto Tecnológico De León
MILTHON ESCALERA