
Engineering professional with strong background in finding root-cause and troubleshooting and project management. Skilled in PLC/HMI software, electrical/pneumatic/hydraulic system and sequence control. Consistently delivers high-quality results in dynamic and fast paced environments.
- Created a strong foundation and compared safety regulations for this project control concept, based on project experience from Samsung Electronics Korea and Samsung Austin Semiconductor.
- Procurement management for United States standard electrical components and built strong relationships with parts distributors within North America and South Korea
- Actively engaged and solved issues from CCSS manufacturing and Factory Acceptance Testing
- Established and presented major program and communication concepts during the technical review meeting to executives and engineers in Samsung, before being selected as the main vendor for CCSS, for 100+ systems.
- Set-up total of 9 systems as stand-alone PLC programmer.
- Active response and action to customer VOC
- Established and maintained effective communication with clients to promote accuracy of programmed components.
- Reduced downtime by troubleshooting and resolving complex issues with PLC-controlled equipment.
- Collaborated with engineering teams to integrate PLC programming solutions into new system designs, ensuring optimal functionality.
- Coordinated with vendors to evaluate new components for compatibility with existing control systems, ensuring seamless integration when upgrades were necessary.
- Created a strong foundation and compared safety regulations for this project control concept, based on project experience from Samsung Electronics Korea and Samsung Austin Semiconductor.
- Procurement management for United States standard electrical components and built strong relationships with parts distributors within North America and South Korea
- Actively engaged and solved issues from CCSS manufacturing and Factory Acceptance Testing
- Established and presented major program and communication concepts during the technical review meeting to executives and engineers in Samsung, before being selected as the main vendor for CCSS, for 100+ systems.
- Set-up total of 9 systems as stand-alone PLC programmer.
- Active response and action to customer VOC
- Established and maintained effective communication with clients to promote accuracy of programmed components.
- Reduced downtime by troubleshooting and resolving complex issues with PLC-controlled equipment.
- Collaborated with engineering teams to integrate PLC programming solutions into new system designs, ensuring optimal functionality.
- Coordinated with vendors to evaluate new components for compatibility with existing control systems, ensuring seamless integration when upgrades were necessary.