Summary
Overview
Work History
Education
Skills
Special Equipment
Timeline
Generic

KEVIN BRELAND

Olla,LA

Summary

Seeking a position in surveying, wherein my knowledge, experience, and capabilities will be utilized to benefit myself and my employer. Offering 30 years of experience in ALTA, preliminary, boundary, topographic, as-built, restoration and tool tracking ( smart pig ) surveys on numerous pipelines and fiber optic projects. Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Overview

30
30
years of professional experience

Work History

Party Chief

Tablerock Survey
Columbus, TX
10.2024 - 07.2025
  • Client: White Water
  • Projects: 42" Matterhorn Express, 24" Sandow Lateral and 12" Katy Lateral
  • The re-stake and as-built survey, job duties consist of pipe tally, road bores, tie ins, mainline, lowering in and provided isometric drawings on valve settings on all fabrication.

PARTY CHIEF

LW SURVEY CO
Bemidji, MN
12.2020 - 10.2024
  • Client: Enbridge Line 3
  • The construction staking, boundary, topographic, as-built and restoration survey for a 36" pipeline.
  • Collected mainline valve data in compressor stations and valve sites, and provided isometric drawings.

PARTY CHIEF

ATWELL LLC
07.2018 - 03.2020
  • Clients: PDC Premium & Salt Creek Midstream
  • The construction staking, boundary, topographic, and as-built survey on numerous pipelines in the Permian Basin.
  • Collected mainline valve data and provided isometric drawings.

PARTY CHIEF

TRICO SURVEYING AND MAPPING
04.2017 - 10.2017
  • Client: Sunoco
  • Project: The Mariner East 2
  • The construction staking, boundary, topographic and as-built survey on a 16" and 24" dual pipeline.

PARTY CHIEF

D3 SURVEYING AND MAPPING
06.2016 - 12.2016
  • Client: Entergy Transfer
  • Project: The Dakota Access
  • The construction staking, boundary, topographic and as-built survey on a 30" pipeline.

PARTY CHIEF

WESTWOOD PROFESSIONAL SERVICES
07.2013 - 10.2015
  • Client: Enbridge
  • Project: The Flanagan and The SAX
  • The construction staking, boundary, topographic and as-built survey on a 24" and 36" pipeline.
  • Collected mainline valve data and provided isometric drawings.

PARTY CHIEF

ALL TERRAIN SURVEY
09.2012 - 04.2013
  • Client: DCP Midstream
  • The preliminary, construction staking, boundary, topographic and as-built survey on numerous pipelines.

PARTY CHIEF

TRICO SURVEYING AND MAPPING
11.2011 - 06.2012
  • Client: Enbridge & Dominion Pipeline Co.
  • The preliminary, construction staking, boundary, topographic and as-built survey on a 36" and 24" pipeline.

PARTY CHIEF

COOK SANDERS AND ASSOCIATES
06.2011 - 10.2011
  • Client: T.D. Williams
  • Tool tracking (smart pig) and sub-cm survey on numerous pipelines.

PARTY CHIEF

MIDCO SERVICES LLC
04.2011 - 05.2011
  • Client: DCP Midstream
  • The construction staking, boundary, topographic, and as-built survey on a 12" pipeline.

PARTY CHIEF

COOK SANDERS AND ASSOCIATES
05.2010 - 03.2011
  • Client: El Paso
  • Project: The Ruby
  • The construction staking, boundary, topographic and as-built survey on a 42" pipeline.

PARTY CHIEF

UNIVERSAL ENSCO
04.2008 - 09.2008
  • Client: Chesapeake Energy
  • The preliminary, boundary, and topographic survey on a proposed gathering system.

PARTY CHIEF

TRIGON EPC
06.2007 - 11.2007
  • Client: Kinder Morgan
  • Project: The Rockies Express
  • The construction staking, boundary, topographic and as-built survey on a 42" pipeline.

PARTY CHIEF

PPI TECHNOLOGIES
10.2006 - 02.2007
  • Client: Crosstex
  • The construction staking, boundary, topographic and as-built survey on a 24" pipeline.

PARTY CHIEF

MUSTANG ENGINEERING
04.2006 - 10.2006
  • Client: Lion Oil
  • The preliminary, boundary, topographic and as-built survey on a 8" pipeline.

PARTY CHIEF

RODNEY RAY AND ASSOCIATES
08.2005 - 10.2005
  • Client: Center Point Energy
  • The preliminary, construction staking, boundary and topographic survey for an 8" pipeline.

PARTY CHIEF

GULLET AND ASSOCIATES
03.2005 - 07.2005
  • Client: Enterprise Pipeline Co.
  • The construction staking, boundary, topographic and as-built survey on a 8" pipeline.

PARTY CHIEF

LW SURVEY CO
11.2004 - 12.2004
  • Client: Magellan Pipeline Co.
  • A depth of cover survey consisting in locating, probing and collecting the depth of cover of the pipe.

PARTY CHIEF

AGIS TECHNOLOGIES
09.2004 - 10.2004
  • Client: Gulf South Pipeline Co.
  • A depth of cover survey consisting of locating, probing and collected data of the depth of the pipe.

INSTRUMENT OPERATOR

C & C TECHNOLOGIES
04.2004 - 08.2004
  • Client: Shell Pipeline Co.
  • The preliminary, construction staking and probing existing pipelines in the right of way corridor for a 24" pipeline.

PARTY CHIEF

GATEWAY SERVICES
07.2003 - 08.2003
  • Client: Seminal Transportation Gathering
  • A mapping survey of an 8" pipeline consisting of locating and collecting data.

INSTRUMENT OPERATOR

RODNEY RAY AND ASSOCIATES
06.2003 - 07.2003
  • Client: Center Point Energy
  • The preliminary, boundary and topographic survey for a proposed pipeline.

INSTRUMENT OPERATOR

C & C TECHNOLOGIES
03.2003 - 05.2003
  • Client: LA Corps of Engineers
  • The preliminary survey for a proposed pipeline consisting of shooting cross section lines on the Inter Coastal Canal for the Matagorda Bay re-route.

INSTRUMENT OPERATOR

MUSTANG ENGINEERING
07.2002 - 11.2002
  • Client: Colonial Pipeline Co.
  • The preliminary and construction staking for a proposed pipeline.

PARTY CHIEF

PACE ENGINEERING
07.1999 - 11.2001
  • Clients: New Jersey Natural Gas Co., Florida Power & Light Co., Aerie Networks, and Williams Communications
  • A topographic survey of a natural gas system and the preliminary survey of numerous fiber optic cable projects.

INSTRUMENT OPERATOR / PARTY CHIEF

FLUOR DANIELS WILLIAMS BROTHERS
08.1998 - 04.1999
  • Client: Phillips Pipeline Co.
  • The preliminary, boundary and topographic survey for a 12" and a 36" pipeline.

Rodman / Instrument Operator

MUSTANG ENGINEERING
10.1997 - 07.1998
  • Clients: Southern Natural Gas Co., Texas Eastern & Willprise Pipeline Co.
  • The preliminary survey, construction staking and as-built survey on a 12" and 36" pipeline.

Rodman

FLUOR DANIELS WILLIAMS BROTHERS
02.1997 - 10.1997
  • Clients: Texas Eastman, Lakehead Pipeline Co., and Columbia Gas Co.
  • The preliminary, construction staking, boundary, topographic and as-built survey on a 10" pipeline.

RODMAN

WILLBROS ENGINEERING
11.1996 - 12.1996
  • Client: Great Lakes Gas Co.
  • The preliminary, boundary and topographic survey for a proposed pipeline.

RODMAN

FLUOR DANIELS WILLIAMS BROTHERS
06.1996 - 09.1996
  • Client: Texas Eastman
  • The preliminary, boundary, topographic and as-built survey for a 10" pipeline.

RODMAN

MUSTANG ENGINEERING
03.1996 - 06.1996
  • Client: Phillips Pipeline Co.
  • The preliminary, boundary and topographic survey for a proposed !0' pipeline.

RODMAN

JEFFERIES & ASSOCIATES
11.1995 - 12.1995
  • Client: Amoco Pipeline Co.
  • The preliminary, boundary and topographic survey for a proposed pipeline.

Education

Caldwell Parish High School
Columbia, LA
05.1994

Skills

  • File Transfer
  • Data Verification and Entry
  • Staking Expertise
  • Surveying Equipment
  • Mapping Abilities
  • Planning & Organizing
  • Critical Thinking
  • Veri-forced OQ trained ( Sept 2023 - Sept 2026 )
  • PPE Use
  • First Aid/CPR
  • Good Work Ethic
  • OSHA 10
  • Proficient isometric drawings

Special Equipment

  • Total Stations: Pentex, Trimble, Topcon 210, 212, 313, etc. , and Sokkia Set B4.
  • Data Collectors: HP 48 ( TDS Software ), Trimble TSC 1, 2, 3, 5 & 7, Trimble Geo XT ( Terra Sync Software ), Sokkia SDR 33, Panasonic Tough Book ( Tsunami Software ), Hammer Head Computer ( Pen Map Software ), Allegro and Carlson ( TDS Software).
  • Pipe and Utility Locators: Metrotech 810, 850, 9800 XT, etc. , Subsurface, Sure Lock, M Scope, RD 4000, RD 7000, & RD 8000.
  • Pin Locators: Schonstedt, Subsurface, etc.

Timeline

Party Chief

Tablerock Survey
10.2024 - 07.2025

PARTY CHIEF

LW SURVEY CO
12.2020 - 10.2024

PARTY CHIEF

ATWELL LLC
07.2018 - 03.2020

PARTY CHIEF

TRICO SURVEYING AND MAPPING
04.2017 - 10.2017

PARTY CHIEF

D3 SURVEYING AND MAPPING
06.2016 - 12.2016

PARTY CHIEF

WESTWOOD PROFESSIONAL SERVICES
07.2013 - 10.2015

PARTY CHIEF

ALL TERRAIN SURVEY
09.2012 - 04.2013

PARTY CHIEF

TRICO SURVEYING AND MAPPING
11.2011 - 06.2012

PARTY CHIEF

COOK SANDERS AND ASSOCIATES
06.2011 - 10.2011

PARTY CHIEF

MIDCO SERVICES LLC
04.2011 - 05.2011

PARTY CHIEF

COOK SANDERS AND ASSOCIATES
05.2010 - 03.2011

PARTY CHIEF

UNIVERSAL ENSCO
04.2008 - 09.2008

PARTY CHIEF

TRIGON EPC
06.2007 - 11.2007

PARTY CHIEF

PPI TECHNOLOGIES
10.2006 - 02.2007

PARTY CHIEF

MUSTANG ENGINEERING
04.2006 - 10.2006

PARTY CHIEF

RODNEY RAY AND ASSOCIATES
08.2005 - 10.2005

PARTY CHIEF

GULLET AND ASSOCIATES
03.2005 - 07.2005

PARTY CHIEF

LW SURVEY CO
11.2004 - 12.2004

PARTY CHIEF

AGIS TECHNOLOGIES
09.2004 - 10.2004

INSTRUMENT OPERATOR

C & C TECHNOLOGIES
04.2004 - 08.2004

PARTY CHIEF

GATEWAY SERVICES
07.2003 - 08.2003

INSTRUMENT OPERATOR

RODNEY RAY AND ASSOCIATES
06.2003 - 07.2003

INSTRUMENT OPERATOR

C & C TECHNOLOGIES
03.2003 - 05.2003

INSTRUMENT OPERATOR

MUSTANG ENGINEERING
07.2002 - 11.2002

PARTY CHIEF

PACE ENGINEERING
07.1999 - 11.2001

INSTRUMENT OPERATOR / PARTY CHIEF

FLUOR DANIELS WILLIAMS BROTHERS
08.1998 - 04.1999

Rodman / Instrument Operator

MUSTANG ENGINEERING
10.1997 - 07.1998

Rodman

FLUOR DANIELS WILLIAMS BROTHERS
02.1997 - 10.1997

RODMAN

WILLBROS ENGINEERING
11.1996 - 12.1996

RODMAN

FLUOR DANIELS WILLIAMS BROTHERS
06.1996 - 09.1996

RODMAN

MUSTANG ENGINEERING
03.1996 - 06.1996

RODMAN

JEFFERIES & ASSOCIATES
11.1995 - 12.1995

Caldwell Parish High School
KEVIN BRELAND