Hardworking and passionate job seeker with strong organizational skills eager to secure entry-level Maintenance position. Ready to help team achieve company goals.
Overview
5
5
years of professional experience
Work History
Plumber's Assistant
Shiner Plumbing Co.
01.2019 - Current
Performed preventive maintenance on plumbing systems to detect leaks and slow drains.
Inspected pipes and piping systems to assess quality and condition.
Drilled and cut holes in walls and floors to accommodate passage of pipes.
Installed underground storm, sanitary sewer, irrigation systems and water piping systems.
Unclogged sinks and toilets for customers using tools and drain cleaners.
Used rulers and levels to locate and mark position of pipe installations, passage holes and connections.
Used couplings, clamps and screws to assemble pipe sections, tubing and fittings.
Filled plumbing fixtures and pipes with water or air to detect and locate leaks.
Removed old sinks, toilets and pipes in preparation for installation of new fixtures.
Hung steel supports from ceiling joists to securely hold pipes in place.
Studied building plans and inspected structures to assess material and equipment needs.
Repaired sinks, dishwashers and other domestic appliances, removing clogs, and cleaning pipes.
Listened to instructions from journeyman plumber, gaining valuable onsite job training.
Organized and moved materials from truck to job site to support project requirements.
Followed safety practices with tools and general behaviors to prevent accidents and safeguard equipment.
Installed valves, hangers, supports, and flanges inside piping systems.
Worked from drawings, sketches, or verbal instructions to install and modify plumbing systems.
Offered guidance and training to junior team members.
Independently worked on projects, while offering process coordination and cooperation with other teams.
Installed plumbing systems and fixtures in residential and commercial properties.
Selected type and size of piping required for each project.
Carpenter/Lead Installer
Bill Shea's Corian Countertops
08.2022 - 12.2023
Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
Followed established job site safety regulations and maintained safe and clean work area.
Planned projects by identifying necessary equipment, tools, and required assistance.
Completed installations of building structures, trim, flooring, and cabinetry.
Planned and executed work with proper tools and materials to maximize productivity.
Collaborated with other construction workers to coordinate projects and streamline process.
Assisted in training new carpenters to demonstrate techniques, apply best practices and comply with protocols and regulations.
Discarded debris and disposed waste to maintain cleanliness and quality standards.
Read and interpreted blueprints to follow specifications of projects.
Demonstrated close attention to detail to verify quality and accuracy of work.
Cut, shaped and installed siding, roofing and framing to protect interior of properties from harsh weather conditions.
Measured, drilled and sawed materials to perform successful home improvements.
Measured materials to determine sizes and quantity required for construction project.
Inspected job sites to identify potential hazards and establish protection and safety standards.
Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
Built and hung custom doors and frames.
Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
Calculated dimensions and amount of needed materials by accurately measuring job site and structures.
Assembled and installed furniture and cabinetry.
Inspected buildings to identify repair needs.
Shaped or cut materials to specified measurements using hand tools, machines and power saws.
Concrete Finisher
Summit Restoration
01.2021 - 08.2022
Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
Operated equipment such as forklifts safely to efficiently complete site work.
Installed rebar and molded expansion joints and edges for concrete projects.
Maintained clean, safe worksite for team safety and to help keep projects on-track.
Mixed, spread, and patched concrete to specifications.
Demolished and repaired old concrete surfaces.
Shoveled materials such as dirt, gravel, and asphalt.
Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Created specific finishes on poured concrete.
Measured precise amounts of concrete and verified levelness to improve quality of finished product.
Set wood and other forming materials to prepare for concrete pours.
Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
Measured and marked areas for deploying concrete.
Applied contraction, construction, or isolation joints in appropriate areas and situations.
Mixed cement for standard, volumetric, or pervious concrete.
Repaired damaged items using different chemicals and tools.
Monitored inventory of key tools and materials used at each project site to provide consistent availability.
Engaged with customers and subcontractors and provided timelines for project completion.
Cut, chipped, or sawed concrete to create desired shapes.