Thirteen years of sound experience in execution in highway, installation, testing & commissioning and handing over inn various projects. Currently working with Parsons International as Site Engineer. I have been operated various critical and challenging projects from design stage to implementation and assuring these projects got implemented as per specification in stipulated time with CONTRACT QC/QA. I can handle high pressure environments with ease and open minded and good team player.

Overview

13
13
years of professional experience
23
23
years of post-secondary education
3
3
Certifications
2
2
Languages

Work History

Site engineer

Parsons International
Al Waab , Qatar
01.2021 - 01.2023
  • Al Waab Street interim development p061 extension, Upgrading all street infrastructure (etc
  • Installation of all ducts related to electrical purposes
  • Concentrated on the establishment of traffic signals along the road and installed 4 traffic signals on 4 junctions to expedite the upgrade road work due to FIFA world cup -Relocated MOI cameras from existing places to a proposed places with corporation of MOI authority
  • Streetlights (decorative and 10 meters light poles)
  • ITS enclosures, UPS, RU, PTZ cameras, Magneto meter& Access points were integrated after connection of F.O cables and were silicide them
  • Traffic signals, ACC& (RLVC & ANPR) cameras were installed, were tested& got proceed to work Intersection of Duhail street and Garaffa P007 C1
  • Supervised and monitored daily tasks of Number subcontractors.
  • Ordered and tracked delivery of construction materials and supplies from vendors.
  • Compiled and presented reports explaining project details to non-technical stakeholders.
  • Applied engineering principles to troubleshooting and followed up on defined corrective actions to prevent reoccurrences.
  • Developed safety awareness program consisting of construction safety audits and safety meetings.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.

Site engineer

Parsons International
Garrafa , Qatar
09.2019 - 01.2021
  • Made EHV circuits diversions with existing networks between NDBS S/S to WC S/S
  • Upgrading all street infrastructure (etc
  • Installation of all ducts related to electrical purposes
  • Concentrated on the establishment of traffic signals along the road and installed 4 traffic signals on 4 junctions to expedite the upgrade road work due to FIFA world cup -Relocated MOI cameras from existing places to a proposed places with corporation of MOI authority
  • Streetlights (decorative and 10 meters light poles)
  • ITS enclosures, PTZ cameras, Magneto meter& Access points were integrated after connection of F.O cables and were silicide them
  • Traffic signals, ACC& (RLVC & ANPR) cameras were installed, were tested under intersection of AL SHAMAL AND ALGRAFFA BRIDGES & got proceed to work
  • Role and responsibilities:
  • Coordination with SRE of project and senior engineer for strategy of works
  • Call meetings with client for realizing what is time, scope, and point that they want it of project
  • Review shop drawing, submittal and approve it, ITP and method statement and approve it
  • Coordination with senior engineer for what is status of work and what are problems on site to solve them quickly to make project on the track and comply needs of client
  • Install a streetlight, ITS, MOI, and traffic signal controller panels as per approved shop drawing
  • Relocating MOI cameras for proposed place
  • Energization of service cabinets of all panels after coordinating with KM
  • Review with DC department balance of all INR and MIR to complete the project perfectly
  • Supervision with Inspector snag list INR to rectify all the items was installed with fault of installation before handing over to client
  • Testing and commission stage for every system to make sure it works properly without any problems
  • Corporate with end user (QNBN, MOI and KM) for handing over PTZ cameras, traffic system and substation streetlight)
  • Close all documents of with Ashghal to deliver all systems to O&M, Qatar
  • Energo projekt ENTEL, Project:
  • Phase12, GTC\642 A, B, C& D-C8 \2014 feeding a new Umm Al HOUL-Bul Hemmed 4 feeders 400kV, Doha South Super-Al Thumama 2 feeders 66 kV, Muntaza2- Ben Derhem & Wakra New-Wakra South 2 feeders 66 kV networks
  • KAHRAMAA (Qatar Ministry of water and electricity, Ministry of water and electricity

Electrical Engineer

Energo Project Entil
Doha, Qatar
02.2016 - 06.2019
  • Phase10, All projects of the phase10 had been done by Lahmeyer company including Ras Laffan project of feeding 2 feeders between QSTec S/S-AlstomeS/S transmission line-220kV

Electrical Inspector

Lahmeyer International LTD
Ras Laffan, Qatar
05.2012 - 12.2015
  • Project: Phase 9, (GTC\241A\2009) & (GTC\241B\2009)

Electrical Inspector

Cadres Contracting Company
06.2010 - 05.2012
  • Have meeting with our managers discusses for all work stages
  • Review the shop drawings, Material submittals, method of statements, ITP plans, Pre-Qualifications
  • Inspection of material at site as well as at factory on the behalf of Kahramaa representative
  • Inspections of installation, tests of cables, joint bays, and all accessories till energizing as per Kahramaa routine and regulation
  • Prepare Daily Progress Reports for activities going on for cable and joints for Kahramaa
  • Review shop drawings for proposed/existing LV and MV, for comments and approvals
  • Review Material submittals for cable, joints, and LV MV panels
  • Inspection for installation, cable pulling and all substation activities till handover
  • Finalize the projects with installing route marker with approved drawing and fixing name plate over route marker
  • Review the operation and maintenance manual, training manual, attend the final training for each system
  • Review As-built drawings for final submission to Kahramaa
  • Phase 8 & 9, (GTC\241A, & (GTC\241B\2009

Electrical Engineer

KAHRAMAA
04.2009 - 06.2010
  • (Qatar Ministry of water and electricity)
  • Project Cost: 800 million Riyal, Supervision and execution of MEP system
  • Have meeting with our managers discusses for all work stages
  • Review the shop drawings, Material submittals, method of statements, ITP plans, Pre-Qualifications
  • Inspection of material at site as well as at factory on the behalf of Kahramaa representative
  • Inspections of installation, tests of cables, joint bays, and all accessories till energizing as per Kahramaa routine tests and regulation
  • Prepare Daily Progress Reports for activities going on for cable and joints for Kahramaa
  • Review shop drawings for proposed/existing LV and MV, for comments and approvals
  • Review Material submittals for cable, joints, and LV MV panels
  • Inspection for installation, cable pulling and all substation activities till handover
  • Attend the inspection with other authorities like QNBN, Ooredoo, Vodafone, ITS, Ashghal for material as well as site activities
  • Review the operation and maintenance manual, training manual, attend the final training for each system
  • Review As-built drawings for final submission to Kahramaa

Education

Master for computer science -

Online Chicago University
11.2022 - Current

PMP certified: no.3212887, original - undefined

01.2004 - 01.2022

10th - Electrical And Computer Engineering

Ramadan city
09.2003 - 09.2008

MMUP Certified Engineer, Qatar WES Approval Equivalent For Graduation Certificate Of World Education Services Of CANDA Certified Of Achievement Of Confined Space Entry Awareness & Work Certified Of HEIGHT AWARENESS From QISC PARSONS Certified Of Annual Security Awareness Training PARSONS Certified Of FCPA Overview PARSONS Certified Of SAFETY SCANNING OR SITUATIONAL AWARENESS PARSONS Certified Of PREVENTING SLIPS, TRIPS AND FALL PARSONS Certified Of SAFETY SCANNING OR SITUATIONAL AWARENESS PROJECT MANAGEMENT BODY (PMP) -

WES (world Education Services of CANDA)
06.2021 - 06.2021

Skills

Construction execution & supervisionundefined

Software

VOIP software - graduate project

Certification

PMP Management

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

The way to get started is to quit talking and begin doing.
Walt Disney

Timeline

Master for computer science -

Online Chicago University
11.2022 - Current

PMP Management

05-2022

MMUP Certified Engineer, Qatar WES Approval Equivalent For Graduation Certificate Of World Education Services Of CANDA Certified Of Achievement Of Confined Space Entry Awareness & Work Certified Of HEIGHT AWARENESS From QISC PARSONS Certified Of Annual Security Awareness Training PARSONS Certified Of FCPA Overview PARSONS Certified Of SAFETY SCANNING OR SITUATIONAL AWARENESS PARSONS Certified Of PREVENTING SLIPS, TRIPS AND FALL PARSONS Certified Of SAFETY SCANNING OR SITUATIONAL AWARENESS PROJECT MANAGEMENT BODY (PMP) -

WES (world Education Services of CANDA)
06.2021 - 06.2021

Site engineer

Parsons International
01.2021 - 01.2023

ESHAP

08-2020

Confined space

11-2019

Site engineer

Parsons International
09.2019 - 01.2021

Electrical Engineer

Energo Project Entil
02.2016 - 06.2019

Electrical Inspector

Lahmeyer International LTD
05.2012 - 12.2015

Electrical Inspector

Cadres Contracting Company
06.2010 - 05.2012

Electrical Engineer

KAHRAMAA
04.2009 - 06.2010

PMP certified: no.3212887, original - undefined

01.2004 - 01.2022

10th - Electrical And Computer Engineering

Ramadan city
09.2003 - 09.2008
Moamen AbdelaalElectrical Engineer