Summary
Overview
Work History
Education
Skills
Certification
Languages
Codes Knowledge
Software Skill
Permit To Work
Completion & Commissioning Activity
Timeline
Generic

MOHAMED ARSHAD

Doha

Summary

Highly motivated Construction Engineer with 14+ years of experience in Greenfield and Brownfield construction on EPC projects within the Oil & Gas, Petrochemicals, Stadium, and High-Rise Buildings sectors. Specializes in Steel Structures and Piping, with expertise in project planning, execution, and quality assurance. Proven ability to manage multi-cultural teams and deliver projects safely and within budget.

Overview

19
19
years of professional experience
1
1
Certification

Work History

CONSTRUCTION ENGINEER –STEEL STRUCTURES

SAMSUNG C&T
03.2020 - Current

PROJECT-QATAR ENERGY LNG-NORTH FIELD EXPANSION-EPC-2


  • Managed construction activities, ensuring compliance with client requirements, procedures, Policies and schedules
  • Developed and implemented construction execution plans as per client schedule and, resulting in a reduction in project delays.
  • Prepare, reviewed, and submitted Direct and subcontractor (Method Statements, JSAs, documents lifting plans, RFI&QAQC documents), ensuring adherence to project standards.
  • Coordinated with client, Other Department and subcontractors Monitor progress of construction activities, and manage the team of field coordinators in order to achieve safe and timely execution of projects.
  • Continuously monitor changing field conditions and take appropriate actions with the ability to execute multiple projects simultaneously.
  • Conducted constructability reviews and facilitated construction review meetings to identify and resolve technical issues, minimizing project disruptions.
  • Monitored project progress, identified deviations, and implemented corrective actions to maintain schedule and budget
  • Review the project heavy (critical) lifting plan and ensure that the content of the subcontractor's reports and records are reviewed and approved by the Company in accordance with the project contract requirements.
  • Prepare and organize permits and Coordinating with Client & Concurring parties for the smooth operation accordance with Project procedures, regulations, specifications, and standards.
  • Facilitate constructability reviews, brownfield activities preparation and construction review meetings and complete all reports, ensuring the areas of concerns and specific technical issues are identified and tackled on time, with relevant mitigations in line with project specifications and requirements.
  • Review and Instruct subcontractors to arrange manpower, equipment, transportation and training in accordance with site conditions, project procedures, regulations, specifications and standards.
  • Monitor and follow up the project planned erection materials and organize the erection plan as per the project schedule. Accountable for Lifting/rigging staff under supervision.
  • Monitoring and control of all structural steel erection, pre-assembly and other installation activities as per the condition of the site, and resolved site related issues.
  • Report each site operations and construction related activities to top management and elaborate on site status, issues & completion plan.
  • Ensured compliance with safety, health, and environmental regulations, promoting a strong safety culture on site & risk assessment reviews for execution of projects to ensure safety.

SITE ENGINEER - PIPING

PETROFAC
12.2013 - 08.2016

PROJECT - SUHAR REFINERY IMPROVEMENT PROJECT (SRIP) - (ORPIC) – EPC


  • Preparing, coordinating, scheduling, and monitoring the assigned engineering projects ensuring managed construction activities, ensuring compliance with client requirements, procedures, Policies and schedules
  • Review engineering deliverables and initiate appropriate actions
  • Supervising and approving construction activities and coordinating various aspects of the project such as material submission, inspection, working on drawings, etc.
  • Resolving difficulties and problems in discussion with other discipline & contractors.
  • Implementing a standardized work construction process and executing the control system for each construction activity
  • Organizing and coordinating construction activities with accordance to schedules.
  • Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
  • Elaborates construction feasibility analysis evaluating the available materials & drawings.
  • Raising MTO(s) for all materials required to additional materials for hydro test etc.
  • Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings
  • Ensure the Productivity and Quality is maintained by subordinates. Coordinate with other Disciplines in site.
  • Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports
  • Assist Design Department in solving Piping Modification and Technical Problems in the Field
  • Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements
  • Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment and plumpness.
  • Carrying out final P&ID check of installed piping systems in the module.
  • Preparing “AS BUILT” drawings.
  • Preparation of field piping system test packages, including system limit on P&ID and piping Isometrics
  • Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.
  • Responsible for line checking after hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.
  • Ensure that hydro test reinstatement is to be done as per procedure.
  • Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of project.


PIPING TECHNICAL SKILLS.

  • Creation/checking of piping isometric with respects of piping layout & P&ID
  • Creating MTO from PID, piping layout and isometric.
  • To read isometric drawings with MTO & Supports and work
    accordingly.
  • Familiar with International Design code like ASME, ANSI, API.
  • Proficient in study piping and equipment layouts development and plot plan development.

PROJECT & SITE ENGINEER

SOLB26 WLL
10.2016 - 03.2020

PROJECTS - AL BAYT STADIUM-CIMOLAI, AL WAKRAH STADIUM-IMAR, METRO RAIL SHELTERS-QDVC, RASBU FONTAS STATION-FYAB

PRODUCTION PLANNING ENGINEER

WILLIAM HARE
05.2007 - 03.2010

PROJECT – QATAR PEARL GTL, AL RAHA HQ BUILDING, SOHAR PORT JETTY PROJECT.

Education

Bachelor of Technology - Mechanical Engineering

Prist University
Chennai, TN, India
04.2013

MBA - Operations and Project Management

Madurai Kamaraj University
Madurai, TN, India
06.2025

Skills

  • Construction management
  • Engineering software proficiency
  • Project scoping
  • Pipeline system management
  • Structural management
  • Project management
  • Cost analysis
  • Health and Safety
  • Operations management
  • Completion & Commissioning
  • Design Support

Certification

  • Safe Rigging and Slinging
  • AutoCAD
  • Tekla
  • Primavera
  • NDT-(Non Destructive Testing)

Languages

English: C2 Proficient
Tamil: Native language
Hindi: B1 Intermediate
Arabic: A2 Elementary

Codes Knowledge

  • IBC International Building Code
  • QCS Qatar Construction Specification
  • AISC, ASCE, NFPA, ISO
  • BS EN 1090, 10025, 8004: 1986
  • ASTM, API, NASC, NACE
  • AWS

Software Skill

  • Auto Cad
  • Tekla
  • Idea (Connection design)
  • MS Office
  • Primavera P6 (Planning and Scheduling)
  • Navisworks (Viewing Software)
  • Trimble Connect (Viewing Software)
  • Qatar Energy LNG Winpcs
  • SAP - Systems, Applications, and Products in Data Processing

Permit To Work

  • Qatar Energy LNG - PTW
  • Qatar Energy RLC- ECPW
  • Samsung C&T – PTW

Completion & Commissioning Activity

  • Clearing all Punch list and Pending RFI before Pre-Startup Activities.
  • Supervise construction and commissioning activities for the respective discipline at worksite in a safe manner, on time, within budget and in accordance with the applicable Company Procedures and Technical Specifications.
  • Provide documentation and records on the design, construction, and testing to facilitate the operation and maintenance of the facility.
  • Owner's Project Requirements, Basis of Design, Commissioning Plan, Pre-functional Checks of Facility Systems, Functional Tests, Systems Manual, Training Doc and Final Commissioning Report.
  • After completion of our work, coordination with completion dept. arranges DC Walkdown with project owner and close the job as per company feedback.

Timeline

CONSTRUCTION ENGINEER –STEEL STRUCTURES

SAMSUNG C&T
03.2020 - Current

PROJECT & SITE ENGINEER

SOLB26 WLL
10.2016 - 03.2020

SITE ENGINEER - PIPING

PETROFAC
12.2013 - 08.2016

PRODUCTION PLANNING ENGINEER

WILLIAM HARE
05.2007 - 03.2010

MBA - Operations and Project Management

Madurai Kamaraj University

Bachelor of Technology - Mechanical Engineering

Prist University