Summary
Overview
Work History
Education
Skills
Timeline
Generic

Mohammad Khan

Georgetown,TX

Summary

To obtain this position will allow me to utilize my organizational, technical, and leadership abilities in a challenging yet rewarding environment. Ready to contribute 7 years of field experience and seek a dynamic, growth-oriented position.

Overview

13
13
years of professional experience

Work History

Engineering Technician III

Flextronics
Austin, TX
08.2025 - Current
  • Operated and maintained precision equipment to ensure optimal performance in manufacturing processes.
  • Conducted regular inspections and tests on systems to identify and resolve technical issues swiftly.
  • Collaborated with engineering teams to enhance product designs, improving overall functionality and reliability.
  • Implemented process improvements that increased production efficiency while maintaining quality standards.
  • Trained new technicians on safety protocols and equipment usage, fostering a culture of compliance and safety awareness.
  • Documented technical processes and created detailed reports for quality assurance reviews, ensuring traceability and accuracy.
  • Consistently met high-quality standards for all completed work while adhering to established timelines, ensuring client satisfaction with final results.
  • Improved equipment reliability by performing regular maintenance and calibrations.
  • Assisted with installation, calibration and testing of engineering systems.
  • Reduced downtime during projects by rapidly identifying and resolving issues with machinery or systems.
  • Completed projects by effectively applying engineering, technical, and maintenance procedures.
  • Troubleshot and resolved engineering issues to reduce delays and achieve project milestones.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
  • Provided technical support for engineering projects to support accuracy and deadline management.

Engineering Technician III

Ultra clean Technology
Austin, TX
08.2024 - 08.2025
  • Kept track of installation and operations to ensure that they met the ambitious standards set by the customer.
  • Followed up on manufacturing and field reports and resolved any issues that arose.
  • Performed device testing, which included writing tests, tracking progress, and documenting defects.
  • Completed tasks in accordance with project timelines and high-quality standards.
  • Train newly hired people, making sure they understand the project.
  • Worked with development team on various teams on various projects.
  • Improve everyone's competency and efficiency.
  • Install new OEM parts on the equipment.
  • Worked with engineers to develop and test design changes during the new product introduction phase.
  • Eliminated customer service issues by quickly resolving disputes and correcting problems.
  • Working in cleanroom environments to prevent contamination of semiconductor materials being processed.
  • Wrote protocols, qualification documents, test plans, and test reports for quality assurance purposes.
  • Compiled, processed, and analyzed test data and results to improve product quality.
  • Developed technical documentation for engineering processes and procedures.
  • Supported project planning by providing technical insights during team meetings.

Commissioning Engineer II

Daifuku Cleanroom Automation America Corporation / Intel
Chandler, AZ
10.2023 - 07.2024
  • Coordinated industrial control system activities with consultants to ensure timely completion of required tasks.
  • Developed internal processes and plans for mechanical verification, product development, and factory processes.
  • Eliminated ineffective product line materials to address performance issues and prevent corrosion.
  • Performed device testing, which included writing tests, tracking progress, and documenting defects.
  • Overseeing the manufacturing of electrical devices and operations to ensure that safety protocols were followed.
  • Troubleshoot and diagnosed equipment issues, quickly devised repair plans, and kept track of usage to identify problems.
  • Used proper tools to run support tests, adjust, and perform mechanical and electrical repairs.
  • Interpreted blueprints, technical drawings, schematics, and computer-generated reports for new product development.
  • Wrote protocols, qualification documents, test plans, and test reports for quality assurance purposes.
  • Initiated a knowledge study of project management and, as a result, standardized project management practices.
  • Exceeded company standards when it came to technical drawings and electrical system specifications.
  • Analyzed software issues, troubleshot them, and communicated workable solutions to the development team.
  • Working in cleanroom environments to prevent contamination of semiconductor materials being processed.
  • Created technical documentation for PLC and Human Machine Interface operation, troubleshooting, and maintenance of industrial systems.
  • Install new OEM parts on the equipment.

Engineering Technician II

Samsung Austin Semiconductor
Austin, TX
01.2023 - 09.2023
    • Wrote protocols, qualification documents, test plans, and test reports for quality assurance purposes.
    • Initiated a knowledge study of project management and, as a result, standardized project management practices.
    • Working in cleanroom environments to prevent contamination of semiconductor materials being processed.
    • Completed projects by following engineering, technical, and maintenance procedures to the letter.
    • Compiled data and created graphs to interpret the findings and make recommendations for key operational improvements.
    • Completed tasks in accordance with project timelines and high-quality standards.
    • I prepared and modified drawings, specifications, calculations, and graphs on my own.
    • Successfully collaborated with cross-functional development teams to design and manufacture new products.
    • Worked with engineers to develop and test design changes during the new product introduction phase.
    • Created electrical schematics using Auto CA Electrical software.
    • Used schematics, diagrams, and written and verbal descriptions to effectively solve engineering project issues.
    • Kept track of installation and operations to ensure that they met the ambitious standards set by customers.

Engineering Technician

Applied Materials
Austin, TX
02.2020 - 12.2022
  • Kept track of installation and operations to ensure that they met the ambitious standards set by the customer.
  • Followed up on manufacturing and field reports and resolved any issues that arose.
  • Completed tasks in accordance with project timelines and high-quality standards.
  • Mentored junior engineers and new hires to
  • Worked with development team on various teams on various projects.
  • Improve everyone's competency and efficiency.
  • Conducted engineering and detailed experimental tests to collect design data and assist in research.
  • Wrote protocols, qualification documents, test plans, and test reports for quality assurance purposes.
  • Investigated issues with electrical equipment such as electro-valves and sensors.
  • Contacted vendors and established solid working relationships with them.
  • Used electrical theory principles to help advance and improve product development and efficiency. Improved product quality by customizing tools and eliminating variability.
  • Working in cleanroom environments to prevent contamination of semiconductor materials being processed.

Day Shift Supervisor

USPS
Austin, TX
10.2016 - 11.2019
  • Increased customer satisfaction by resolving Service issues.
  • Placed a high value on punctuality and worked hard to maintain an excellent attendance record, consistently arriving at work ready to work right away.
  • Eliminated customer service issues by quickly resolving disputes and correcting problems.
  • Answered calls to help customers with their questions and concerns.
  • Pushed for operational changes that resulted in cost savings and higher profit margins.

Assistant Manager

Car solutions
Austin, TX
06.2012 - 08.2016
  • Ensured that all maintenance activities were completed in accordance with company standards.
  • Exceeded sales targets and met business objectives by motivating employees and promoting targeted products.
  • Interacted with customers to assess their needs and recommend products or services.
  • I oversee reporting employee hours to the payroll department.
  • Ordering and receiving products
  • I oversee order and inventory management.
  • Oversaw and managed operational and financial projects to ensure that they were completed on time and within budget

Education

Bachelor of Science - Automotive Engineering

MAWTS Institute of Technology
01.2010

Skills

  • Complex problem-solver
  • Technical plan execution aptitude
  • Customer service
  • Excellent communication techniques
  • Engineering operational functions
  • Troubleshooting
  • Parts and material inventory
  • Manufacturing systems integration
  • Strong leader
  • Multidisciplinary exposure
  • Lean principles knowledge
  • Strict attention to details
  • Team training and Development
  • Domestic and International Experience

Timeline

Engineering Technician III

Flextronics
08.2025 - Current

Engineering Technician III

Ultra clean Technology
08.2024 - 08.2025

Commissioning Engineer II

Daifuku Cleanroom Automation America Corporation / Intel
10.2023 - 07.2024

Engineering Technician II

Samsung Austin Semiconductor
01.2023 - 09.2023

Engineering Technician

Applied Materials
02.2020 - 12.2022

Day Shift Supervisor

USPS
10.2016 - 11.2019

Assistant Manager

Car solutions
06.2012 - 08.2016

Bachelor of Science - Automotive Engineering

MAWTS Institute of Technology
Mohammad Khan