Work Preference
Summary
Overview
Work History
Education
Skills
Languages
Driving License
Passport Details
Personal Details
Timeline
Generic
Mohammad Munna  Khan
Open To Work

Mohammad Munna Khan

Doha,DA

Work Preference

Job Search Status

Open to work
Desired start date: Open to discussion

Desired Job Title

Senior Piping ForemanPiping Foreman (Dubai Chicago Beach Hotel)Piping Foreman (OGD Plant Phase-1)Pipe Fitter

Work Type

Full Time

Location Preference

On-Site
Open to relocation: Yes

Summary

Proven Senior Piping Foreman with expertise in supervising teams and managing complex projects. Strong focus on safety compliance, quality assurance, and effective problem-solving. Committed to delivering optimal results in piping systems installation.

Overview

3
3
Languages
28
28
years of professional experience

Work History

Senior Piping Foreman

Al Jaber Engineering
Doha
06.2012 - Current

Project

  • Hamad Port SFSF(2023-2026)
  • Hamad International Airport RTBF(2021-2023)
  • Al Tumama Stadium (2019-2021)
  • Sidra Hospital & Research Center (2018-2019)
  • Umm Al Houl Power Project (2016-2018)
  • Qatar Cool(2015-2016)
  • ISF Al Duhail(2014-2015)
  • Al Jaber Head Office(2012-2014)

Job Responsibility

  • Supervise the fabrication and installation of chilled water and fire fighting piping systems.
  • Review IFC drawings, P&IDs, isometric drawings, and method statements before work execution.
  • Coordinate the installation of CHW pumps, chillers, AHU/FCU connections, headers, valves, and expansion tanks.
  • Supervise the installation of sprinkler, hydrant, hose reel, fire pump, and landing valve piping systems.
  • Ensure proper pipe routing, alignment, supports, and welding quality as per project specifications.
  • Plan daily work activities and allocate manpower to achieve project schedules.
  • Coordinate material availability with the warehouse and procurement teams.
  • Monitor spool fabrication, erection, and site installation activities.
  • Coordinate hydro testing, flushing, pressure testing, and system commissioning.
  • Coordinate with Mechanical, HVAC, QA/QC, HSE, Electrical, and Civil teams for smooth project execution.
  • Supervise subcontractors and monitor productivity, quality, and safety performance.
  • Arrange cranes, manlifts, scissor lifts, and lifting equipment for site activities.
  • Ensure compliance with project specifications, NFPA requirements, and approved method statements.
  • Monitor installation of pipe supports, anchors, guides, and expansion joints.
  • Resolve site clashes and technical issues in coordination with the engineering team.
  • Monitor work progress and prepare DPR, WPR, monthly reports, manpower distribution, and timesheets.
  • Coordinate inspections, punch list clearance, and mechanical completion activities.
  • Support pre-commissioning, commissioning, and final handover of chilled water and fire fighting systems.

Piping Foreman

Dubai Electricity & Water Authority
Dubai
01.2007 - 04.2012
  • Supervised pipe installation and maintenance projects for energy and utility sectors.
  • Coordinated team schedules and resource allocation to enhance workflow efficiency.
  • Trained workers on safety protocols and industry regulations, ensuring compliance.
  • Inspected materials and equipment for quality assurance before project execution.
  • Managed inventory of tools and supplies to guarantee availability for ongoing projects.
  • Resolved on-site issues promptly, minimizing delays in project timelines.
  • Measured and marked pipes for precise cutting and threading.
  • Performed routine maintenance checks on tools and equipment utilized by crews.

Piping Foreman (Dubai Chicago Beach Hotel)

BK Gulf LLC
Dubai
07.2003 - 06.2006
  • Mentored junior staff on piping fabrication and installation best practices.
  • Conducted regular inspections to uphold quality control during construction.
  • Trained teams on safe tool use and safety equipment in high-risk areas.
  • Implemented process improvements for pipe laying techniques to enhance operations.
  • Directed fabrication of components tailored to specific job requirements.
  • Provided technical support to pipefitters during installations as needed.
  • Created detailed project reports addressing progress, problems, and delays.
  • Ensured compliance of all crew-used equipment with safety regulations.

Piping Foreman (OGD Plant Phase-1)

CCC
Abu Dhabi
02.2000 - 04.2003
  • Supervised piping installation and maintenance projects for various industrial applications.
  • Coordinated daily work schedules and assigned tasks to optimize team workflow and project timelines.
  • Ensured compliance with safety regulations and maintained a safe work environment.
  • Monitored project progress and reported updates to project managers regularly.
  • Trained new employees on piping techniques, tools, and safety protocols.
  • Conducted quality inspections on completed piping systems to ensure adherence to industry standards.
  • Collaborated with engineers to troubleshoot design issues during installation phases.
  • Managed inventory of piping materials and supplies to support project needs.
  • Directed fabrication of piping components for various projects.
  • Developed daily job plans for pipefitting crew, detailing materials, labor hours, and safety precautions to enhance project execution.

Pipe Fitter

BK Gulf LLC
Dubai
12.1998 - 12.1999
  • Contributed innovative solutions to improve team performance and outcomes.
  • Collaborated with diverse coworkers to achieve goals and resolve product-related issues.
  • Promoted customer satisfaction by addressing problems with expertise and friendly service.
  • Worked closely with team members to meet project objectives and deadlines.
  • Provided support and guidance to colleagues to maintain a collaborative work environment.

Education

High School Diploma -

Bihar Intermediate Education Council
Bihar
03-1989

Matriculation -

Bihar School Examination Board
Bihar
12-1987

ITI - Fitter

National Council Of Vocational Training
Bihar

Skills

  • Pipe installation
  • Project scheduling
  • Technical drawings
  • Safety compliance
  • Material procurement
  • Team management
  • Problem solving
  • Time management
  • Conflict resolution
  • Training and mentoring
  • Leading teams
  • Recordkeeping requirements
  • Quality controls
  • Technical documentation
  • Pipe welding techniques
  • Testing activities
  • Piping layouts
  • Pipe system design
  • Fabricating pipe and parts
  • Assigning work
  • Coordinating projects
  • Pressure testing
  • Shutdown planning
  • Material selection
  • Welding supervision

Languages

English
Intermediate (B1)
B1
Hindi
Advanced (C1)
C1
Urdu
Intermediate (B1)
B1

Driving License

  • Qatar Driving License
    License No.- 27135626854
    Validity - 17/11/2026

Passport Details

  • Passport No.- AR751077
  • Date Of Issue - 09/06/2026
  • Date of Expiry - 08/06/2036
  • Place of Issue - Doha

Personal Details

  • Date of Birth - 15/10/1971
  • Father's Name - Tahir Khan
  • Marital status - Married

Timeline

Senior Piping Foreman

Al Jaber Engineering
06.2012 - Current

Piping Foreman

Dubai Electricity & Water Authority
01.2007 - 04.2012

Piping Foreman (Dubai Chicago Beach Hotel)

BK Gulf LLC
07.2003 - 06.2006

Piping Foreman (OGD Plant Phase-1)

CCC
02.2000 - 04.2003

Pipe Fitter

BK Gulf LLC
12.1998 - 12.1999

High School Diploma -

Bihar Intermediate Education Council

Matriculation -

Bihar School Examination Board

ITI - Fitter

National Council Of Vocational Training
Mohammad Munna Khan