Having progressive work experience and working knowledge of the practice of Architecture, Project Management, and Construction Administration of large-scale projects. Expertise in developing innovative and cost-effective designs for the construction of large High-Rise projects Know-how in architectural building codes, FDIC contracts, standards, and controls with a fair knowledge of mechanical, electrical, instrumentation and structural design As a Project Manager, responsible for ensuring projects are completed on time and on budget through proactive management of contractors. Dedicated, committed and willing to work under pressure to attain the contractual obligations. Able to handle multiple, fast-track projects, and international contracts. Knowledgeable of Occupational Health and Safety Act (e.g. OBC, NFPA). Strengths Good Leadership and communication skills. Good written and oral communication. Skilled in designing complex project assignments. Conduct an extensive review of architectural design and documents. Think progressively while working in a variety of roles. Project management experience in a technical environment. Contract administration & site supervision. Analytical and reasoning skills necessary to resolve problems and look for solutions. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
Overview
23
23
years of professional experience
5
5
years of post-secondary education
2
2
Certificates
2
2
Languages
Work History
Senior Resident Architect
AECOM
Doha
07.2020 - Current
Al Wakrah Bus Depot (Client MOTC/PWA)
Plot area Sqm
128,262, BUA approx
Sqm
40,000, and Accommodates 1394 workers and 248 Buses
Lead the architectural construction administration to achieve the project scope of work in accordance with the Client’s vision and design intent
Review submittals and respond to RFI’s
Issue instructions to the contractor for their action to comply with the contract time and quality requirements
Report on the contractor’s activities on site with respect to quality (QA/QC) and methodology compliance
Check the conformity of the contract’s scope with the client’s requirements, drawings, and specifications
Actively contribute to progress meetings and chair technical meetings and workshops
Budget: QAR296.6 million (USD81.5Milion).
Maintained energy and enthusiasm in fast-paced environment.
Devoted special emphasis to punctuality and worked to maintain outstanding attendance record.
Worked within applicable standards, policies and regulatory guidelines to promote safe working environment.
Proved successful working within tight deadlines and fast-paced atmosphere.
Demonstrated respect, friendliness and willingness to help wherever needed.
Prepared variety of different written communications, reports and documents.
Project Manager
Gulf Engineering & Industrial Consultancy
Doha
09.2016 - 01.2020
Project: Development of Al Wukair Logistics Park-
Phase I: preparation of Request for Proposal (RFP) including Performance Specification, Design Guidelines, and Evaluation Criteria
For M/s Manateq (Economic Zones Company)
Phase II: preparation of Master Planning, Design Report, Land Use Plan, Plot Development Plan, Concept Design, 3D perspectives, Specification of proposed building materials, Building envelop strategies & Construction Programme
Phase III: Putting together Bidding Documents for M/s Barwa to submit to M/s Manateq
Project: Construction of Al Mutahidah Residential Twin Towers in VB27 & VB28, the Pearl Qatar
Client: United Development Company (UDC)
Build up area: 160,000 sq.m
Number of Floors: 2 above ground Car Parking + Main floor + 23F + 2RF
480 Residential units
Include: 106 Studios, 107 one‐BR, 120 two‐B, 40 three‐BR, 12 luxury penthouses, 14 townhouses and 18 Loft 727 car parking
Main lobby, back of the house and common areas
Outdoor and indoor swimming pools, on deck landscaping, and GYM
Budget: 613 million QR (Incl
Variations)
Duties & Responsibilities:
Provide overall project management for the project during the construction and ensure that all work carried out is in alignment with the goals and objectives of the plan as defined by the PMC contract with the Client’s policy and strategic goals
Proactively communicates project requirements to project team, Contractor, Client, and other Stockholders as and when required
Maintain accurate and up-to-date records and reports necessary for internal and external use
Including:
Project status (daily, weekly, and monthly)
Changes initiated due to Client requests or by Contractor due to site condition/ constructability issues
Material flow and delivery (daily and long lead items)
HSE status (daily, weekly, and monthly)
Lead, Plan and Monitor the project with the team to make sure it can be completed on time and come in on budget
Verify the project meets quality target according to the planned PQP and client expectations
Ensure plan, code and regulations relating to HSE are adhered
Conduct Spot inspection with the HSE team, chair HSE weekly/monthly meetings
Identify potential risks and put action plan for issues on site and flow up with the contact to close them on time
Collaborate and communicate regularly with internal team leads on project resourcing, scheduling, progress, and challenges
Monitor the staff performance and put correction plans to align the team with the project needs
Actively and regularly meet with the project's various stakeholders including main contractor (LCQ), sub-contractors, design consultant (ECG), and developer (UDC) to ensure that the project requirements are well communicated
Perform continuous risk analysis, implement, evaluate risk response plan and keeping the project risk register up to date
Maintain on time delivery of necessary AHJ permits (e.g., MME, KAHRAMA, civil defense, Woqod ...etc).
Met project deadlines without sacrificing build quality or workplace safety.
Maintained compliance with regulatory parameters in complex projects with overlapping policies.
Identified plans and resources required to meet project goals and objectives.
Provided detailed technical and operational direction in project challenges, consistently meeting deliverables according to deadlines.
Senior Resident Architect
AE7
Dubai
04.2015 - 09.2016
Al Fattan Sky Towers, B+G+3P+19 mixed-use tower
A unique eye-catcher for fastidious investors allured by residential luxury
Lead the architectural construction administration to achieve the project scope of work in accordance with the Client’s vision and design intent
Review submittals and respond to RFI’s
Issue instructions to the contractor for their action to comply with the contract time and quality requirements
Report on the contractor’s activities on site with respect to quality (QA/QC) and methodology compliance
Check the conformity of the contract’s scope with the client’s requirements, drawings, and specifications
Actively contribute to progress meetings and chair technical meetings and workshops.
Developed and maintained courteous and effective working relationships.
Maintained energy and enthusiasm in fast-paced environment.
Worked within applicable standards, policies and regulatory guidelines to promote safe working environment.
Proved successful working within tight deadlines and fast-paced atmosphere.
Demonstrated respect, friendliness and willingness to help wherever needed.
Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
Architectural Project Manager
MetCAP Living Management Inc
Toronto
03.2012 - 03.2015
A fabulous Toronto property management company from 20 successful years in the industry
Managing capital asset replenishment projects of a large portfolio of high-rise buildings in the Grate Toronto Area - Annual budget responsibility $ 3.8M plus
Manage replacement/retrofit process from budgeting to project completion; preparation of specifications, hiring consultants for detailed designs where required, tendering, evaluation of bids, award of contracts, drawing and specification review, contractor work supervision, final inspection for substantial completion and acceptance of completed work
Presented project information and status updates to customers and fielded concerns.
Established project goals to carry out directives of top management.
Integrated architectural and engineering drawings to create cohesive packages.
Proved successful working within tight deadlines and fast-paced atmosphere.
Worked with customers to understand needs and provide excellent service.
Learned new skills and applied to daily tasks to improve efficiency and productivity.
Created spreadsheets using Microsoft Excel for daily, weekly and monthly reporting.
Completed paperwork, recognizing discrepancies and promptly addressing for resolution.
Identified issues, analyzed information and provided solutions to problems.
Sr. Architectural Technologist
L. E. Glazer Architect Limited
Toronto
08.2010 - 02.2012
Renovations to the former Father Henry Carr Secondary School located at 21 Panorama Court to the new Rexdale Community Hub Building, City of Toronto
The approximate area of building renovation totals 78,000 sq
Ft
On two floors
Work includes exterior site work, interior
Renovations, demolition and construction of interior structure and partitions, mechanical and electrical services to suit, elevator, signage, state of good repair work, millwork, specialties, and interior finishes
The main challenge was the fast-track nature of the project as it was to finish within 5 months
The project was submitted on time
E
C
Drury School for the Deaf, Campus Sign Refresh & Building Emergency Plans: Complete Wayfinding package for the 21 buildings and the site.
Oversee design development, production of working drawings, and construction documents on the project (UP Town MotorCity-Area 2)
Monitor adherence to terms of contract expectations
Manage the project delivery process and work closely with the client (United Property)
Lead a team of designers and junior architects, delegate tasks, and collaborate with governmental agencies
Undertake quality control and defect inspections of the works on the site
Interface with clients, consultants, and the Construction Management team
Review material and shop drawing submissions
Review trade contractor’s method statements, Inspection and Test Plans
Respond to contractor’s requests for information
Attend Site Meetings with different parties and resolve technical problems on-site
Administration of construction contract and assist the Resident Engineer with a prompt exchange of correspondence
Orient, assign and supervise the construction inspection staff daily
Supervise and remain vigilant regarding all aspects of the construction activities
Provide quality assurance in accordance with contract documents
Review the contractor's progress
Identify constraints and recommend corrective measures
Review inspector's daily reports and prepare a daily diary
Coordination with contractor's supervisory personnel regarding schedule, sequence, and method of work.
Chief Architect
Group Consult International
Dubai
08.2003 - 11.2005
Engaged in architectural services
Lead Architectural team holding responsibilities to involve conceptual sketches, design presentation executing the working drawings, providing Architectural details, and presenting the same to the client with ease and in a nice manner
Collaborate with governmental agencies to complete the building permit approvals from AHJ (Dubai Municipality, DCD, DEWA, Etisalat
Etc.).
Sr. Architect cum Project Manager
Dallah Hotel Management Co
Amman
10.1998 - 08.2003
Provide interior fit-out services and manage the execution of the same for a 4-star Hotel (Imperial Palace Project)
After opening a follow-up for the additional requirements of the above hotel
Concept Design for the Dallah Hotel Management headquarter.
Responsible for the development of drawings & specifications for multiple projectsundefined
Accomplishments
Achieved comprehensive understanding of architecture based on practical experience gained from Qatar, Canada, UAE, Jordan, and Iraq
Soundly designed number of projects in a varied mixture of architectural, interior, and urban projects
Successfully managed and led a team of 28 engineering staff during 2 years in Al Mutahidah Towers project
Managed architectural supervision of 1billion AED residential development, including site meetings, quality control inspections, working with British and American consultants’ firms
Managed capital asset replenishment projects of a large portfolio of high-rise buildings with annual budget responsibility CA$ 3.8M plus
Effectively completed the renovation design of a former School to the new Community Hub Building within 5 months
Interior Fit-out design and project management for a 4-STAR hotel and luxury villas.
Affiliations
UPDA Certified (B14987 valid till 14/05/2023) Member of Society of Engineers, United Arab Emirates
Member of Iraqi Engineers Union Member of Jordanian Engineers Association
I.T. Proficiency
AutoCAD | Revit | Sketchup | 3D Max | Adobe Photoshop | Primavera | Microsoft Office | Outlook | web research
Software
AutoCAD
MS Office
PhotoShop
3D Max
Primavera
Sketchup
Certification
Licensed Arachitectural Engineer design and supervision- [UPDA B]]
Work Availability
monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse
Quote
There is a powerful driving force inside every human being that, once unleashed, can make any vision, dream, or desire a reality.
Tony Robbins
Timeline
Senior Resident Architect
AECOM
07.2020 - Current
Licensed Arachitectural Engineer design and supervision- [UPDA B]]