Summary
Overview
Work History
Education
Skills
Coursework Experience
Timeline
Generic

Morgan Eckerle

Duluth,MN

Summary

Civil engineering senior, graduating in December 2025, with design and construction experience. Seeking a full-time role with Burns & McDonnell and eager to contribute to multidisciplinary, design-build infrastructure projects in water, transportation, and site development, while growing into project leadership and client-facing responsibilities.

Overview

3
3
years of professional experience

Work History

Engineer Intern

Krech Ojard & Associates
Duluth, MN
01.2024 - Current
  • Developed detailed plan sets for rail and highway projects using Civil 3D.
  • Assisted with storm-sewer layout and rail alignment concepts
  • Performed field surveys and quantity checks.
  • Coordinated with senior engineers to refine design details and meet client schedules.

Field Engineer Intern

Ames Construction
Burnsville, MN
05.2023 - 08.2023
  • Produced pipe and earthwork take-offs; drafted work plans to optimize storm-sewer operations.
  • Monitored erosion-control BMPs, ensuring compliance along a 3-mile corridor.
  • Attended owner–contractor meetings, gaining insight into large-scale construction management.

Engineer Intern

Landmark Environmental
Bloomington, MN
05.2022 - 08.2022
  • Performed soil, water, and ambient-air sampling for remediation projects; wrote test reports
  • Created GIS figures illustrating contaminant plumes, treatment zones, and monitoring locations

Education

B.S. - Civil Engineering

University of Minnesota Duluth
Duluth, MN
12-2025

Skills

  • AutoCAD
  • Civil 3D design
  • GIS
  • Advanced Excel
  • Field surveying
  • Team leadership
  • Technical writing
  • Client communication
  • Project management
  • Team collaboration
  • Leadership
  • Problem solving

Coursework Experience

Foundation Design Project – Soils Design Course | Fall 2024

· Analyzed subsurface borings and lab data to classify soils and select shallow vs. deep foundations

· Calculated ultimate & allowable bearing capacity, immediate and consolidation settlement, and pile loading; verified factors of safety per ASD & LRFD criteria

· Delivered a 35-page design report with CAD footing details, load-combination tables, and construction recommendations

Wastewater Process & Financial Evaluation - Environmental Engineering | Spring 2025

· Sized aeration tanks and secondary clarifiers; balanced oxygen demand, SRT, and sludge production

· Performed life-cycle cost analysis with Monte Carlo simulation to account for MARR, first-cost, and salvage variability

Timeline

Engineer Intern

Krech Ojard & Associates
01.2024 - Current

Field Engineer Intern

Ames Construction
05.2023 - 08.2023

Engineer Intern

Landmark Environmental
05.2022 - 08.2022

B.S. - Civil Engineering

University of Minnesota Duluth