Muhammad Mohd Rizal

Summary

Detail-oriented Construction Engineer with four years of experience in heavy civil projects. Managed cost tracking, collaborated with clients and engineers on-site, and delivered essential surveying and design alternatives. Oversaw both self-perform and subcontractor work to ensure project efficiency.

Overview

4
4
years of professional experience

Work History

Field Engineer

Kiewit Corporation
Denver, Colorado
06.2022 - 09.2026

Central 70 Project - Jun 2022 to Apr 2023 (Denver, CO)

Cost: $1.2 Billion - Design-Build

  • Provided concrete and grading survey layout on the Central 70 Cover Top project, including slabs, walls, and foundations.
  • Managed electrical, landscaping, and waterproofing subcontractors, providing schedules, quantities, and daily reports
  • Demoed, installed rebar, and placed concrete of 78 CF wall
  • Demoed, installed rebar, and placed concrete into 9 LF of curb and gutter
  • Organized traffic control plans during operations, including coordination with other operations, location of concrete trucks and testing, and material laydown areas
  • Provided quality control for ADA ramps and sidewalk along intersections and streets

Gross Reservoir Expansion - Apr 2023 to Sept 2026 (Golden, CO)

Cost: $800,000,000 - CM/GC

  • Provided anchor bolt, contraction joint, excavation, concrete, and wire wall survey layout
  • Work planned on operations including excavations, equipment road construction, drill and blast operations, wire wall construction, and dam construction
  • Managed and supported 277,000 CY of dam foundation excavation
  • Installed over 2000 EA anchor bolts for rock stabilization
  • Installed and managed construction of 788 SF of wire wall
  • Managed and supported placement of 724,777 CY of Roller-Compacted Concrete and 85,862 CY of Conventional Vibratory Concrete
  • Supported concrete placement of 355 LF of bridge girders

Lake Conestee Dam Restoration Project - Nov 2024 to Mar 2025 (Greenville, SC)

Cost: $30,000,000 - Progressive Design-Build

  • Provided RCC experience and developed work plans and submittals to the client on dam construction
  • Managed and supported 2,700 SF of wire wall for the RCC batch plant

Education

Bachelor of Science - Civil Engineering

University of Arizona
Tucson, AZ
05-2022

Skills

  • Site supervision
  • Field coordination
  • Construction planning
  • Quantity tracking
  • Cost estimation
  • Submittals management
  • Site inspections
  • Quality assurance
  • Report preparation
  • Engineering judgement
  • Problem solving
  • Time management
  • Attention to detail