Central 70 Project - Jun 2022 to Apr 2023 (Denver, CO)
Cost: $1.2 Billion - Design-Build
- Provided concrete and grading survey layout on the Central 70 Cover Top project, including slabs, walls, and foundations.
- Managed electrical, landscaping, and waterproofing subcontractors, providing schedules, quantities, and daily reports
- Demoed, installed rebar, and placed concrete of 78 CF wall
- Demoed, installed rebar, and placed concrete into 9 LF of curb and gutter
- Organized traffic control plans during operations, including coordination with other operations, location of concrete trucks and testing, and material laydown areas
- Provided quality control for ADA ramps and sidewalk along intersections and streets
Gross Reservoir Expansion - Apr 2023 to Sept 2026 (Golden, CO)
Cost: $800,000,000 - CM/GC
- Provided anchor bolt, contraction joint, excavation, concrete, and wire wall survey layout
- Work planned on operations including excavations, equipment road construction, drill and blast operations, wire wall construction, and dam construction
- Managed and supported 277,000 CY of dam foundation excavation
- Installed over 2000 EA anchor bolts for rock stabilization
- Installed and managed construction of 788 SF of wire wall
- Managed and supported placement of 724,777 CY of Roller-Compacted Concrete and 85,862 CY of Conventional Vibratory Concrete
- Supported concrete placement of 355 LF of bridge girders
Lake Conestee Dam Restoration Project - Nov 2024 to Mar 2025 (Greenville, SC)
Cost: $30,000,000 - Progressive Design-Build
- Provided RCC experience and developed work plans and submittals to the client on dam construction
- Managed and supported 2,700 SF of wire wall for the RCC batch plant