Design and build the Grinding Booth for Dust Extraction, Filtration & Recirculation of air at Dukhan Air Base, Qatar.
Duration: 9months (01/2023 to 09/2023)
- Designed and built a Grinding Booth with advanced cartridge and HEPA filters for dust extraction and air recirculation.
- Collaborated with Climavent Systems - UK(manufacturer), BAE system(End User), ACT(cont.) ensuring compliance with project specifications.
- Prepared commercial offers and technical submittals for client approval., Supervised installation, managing a team of 10 technicians of the system.
- Conducted testing and commissioning to ensure system performance met the project requirement.
- Trained client team, achieving a 95% reduction in airborne particulates and enhancing workplace safety and air quality.
Design & Build GRP Tank Water Storage Systems at Military Medical City Hospital, Doha, Qatar, Duration: 10months (From:08/2022 to 05/2023)
- Designed and built GRP Tank Water Storage Systems to maintain water temperature below 20oC.
- Prepared the Technical Submittal, Thermal design, and IFC drawings for the tanks., Conducted a Technical
- Presentation for the client, addressing consultant comments and arranging a tour of prior projects in Qatar.
- Solely led a team of 20 personnel, managing a project budget of 7 million QAR., Completed the project within a 10-months deadline from contract, covering assembly, testing, commissioning, and handover.