Summary
Overview
Work History
Education
Skills
Detailed Job History
Timeline
Generic

Nathan Back

Knox,IN

Summary

Detail-oriented assembler with 20 years in production. Proven skills in assembly, problem-solving, and maintaining workplace safety. Committed to enhancing quality standards and operational efficiency.

Overview

20
20
years of professional experience

Work History

Assembler/laborer 2

BraunAbility
Winamac, IN
10.2006 - Current
  • Assembled complex mobility products according to detailed specifications and quality standards.
  • Operated specialized tools and machinery, ensuring proper maintenance and safety protocols were followed.
  • Trained new employees on assembly techniques, safety practices, and equipment operation.
  • Conducted quality inspections of completed assemblies to maintain high product integrity and reliability.
  • Assisted in troubleshooting production issues, providing innovative solutions to enhance efficiency.
  • Implemented process improvements that reduced assembly time and minimized material waste.
  • Enhanced workplace safety by maintaining a clean and organized work area at all times.
  • Increased production efficiency by assembling components quickly and accurately.
  • Maintained high-quality standards with thorough inspections of assembled parts.
  • Demonstrated a strong work ethic by consistently arriving on time, prepared to begin work immediately, and contributing positively to the team''s overall success.
  • Assembled components with minimal supervision, exceeding expected project milestones.
  • Demonstrated flexibility in adapting to various types of assemblies, allowing for seamless transition between different projects as needed.
  • Completed durable assemblies and subassemblies with hand and power tools.
  • Reduced assembly errors by following detailed instructions and blueprints for each project.
  • Consistently met or exceeded daily production quotas while maintaining exceptional quality standards in all completed assemblies.
  • Contributed to a positive work environment by offering assistance when needed and maintaining open communication with colleagues.
  • Trained new employees on proper assembly techniques, ensuring quick acclimation to the role and faster overall team results.
  • Completed tasks on time to meet quality and safety standards.
  • Followed safety protocols to maintain safe working environment.
  • Upheld strict adherence to safety protocols, significantly reducing workplace accidents.
  • Improved assembly line versatility by quickly adapting to new product launches.

Team Leader

BraunAbility
Winamac, IN
03.2015 - 11.2017
  • Led team in implementing process improvements to enhance operational efficiency.
  • Mentored staff on best practices and performance standards, fostering a collaborative work environment.
  • Coordinated cross-functional projects to streamline workflows and optimize resource allocation.
  • Analyzed performance metrics to identify areas for growth and development within the team.
  • Facilitated regular team meetings to communicate goals, expectations, and feedback effectively.
  • Oversaw inventory management processes, ensuring accuracy in stock levels and order fulfillment.
  • Maintained an inclusive and diverse team culture, promoting respect and understanding among all members.
  • Collaborated with other department leaders to establish shared goals and ensure alignment across teams.
  • Enhanced team productivity by implementing efficient work processes and regularly reviewing performance metrics.
  • Streamlined workflows for increased efficiency, reducing turnaround times for critical tasks.
  • Facilitated culture of continuous improvement, encouraging feedback and innovative solutions from all team members.

Education

High School Diploma -

Lighthouse Christian Academy
Knox, IN
05-1994

Skills

  • Assembly and production
  • Problem-solving
  • Attention to detail
  • Repetitive work
  • Workplace safety
  • Manufacturing
  • Visual inspection
  • Critical thinking
  • Drilling and tapping skills
  • Multitasking
  • Troubleshooting
  • Visual inspections

Detailed Job History

WAV 2-Toyota, Chevrolet, Buick

  • exhaust installation
  • post-paint prep
  • small part installation
  • kneel installation-temporary position due to staffing issues
  • body work prep-temporary position due to staffing issues

 

WAV 1

  • slide door installation and adjustment-temporary position due to staffing issues on WAV 1

WAV 2-Chevrolet line(split of Chevrolet/Toyota Models)

  • exhaust installation
  • small part installation
  • front raise installation(engine cradle, front raise spacer)
  • wind shield wiper motor, wiper blade, and wiper coil installation
  • gas tank installation
  • front coil-over shock modification and installation
  • body work
  • undercarriage inspection

WAV 2-Toyota/Honda/MXV (Chevy line closure)

  • plywood flooring installation
  • tire installation
  • slide door track installation
  • ramp installation-fold out and infloor
  • front plastic interior installation-toe pan, upper B panels, A/B panels, seat belts, center console and dash panels
  • rear plastic installation-rear vertical, lower C panels, C/D panels, rear threshold, upper rear threshold panel
  • front seat installation
  • rear seat installation
  • slide door installation and adjustment
  • computer diagnostics
  • MXV-complete front interior installation

VSA Door Mod Team Leader

  • WAV 1 & 4 PSD/DSD mod, PSD/DSD track mod, Wav 1 Axle mod, WAV 1 & 2 AC/Heater line mod, WAV 1 & 2 spray booth
  • inventory monitoring
  • Team Member training
  • quality monitoring
  • coordination with other departments on production and quality concerns

WAV 3-Rear Entry Toyota and Chrysler, Nissan Taxi

  • offline second and third row seat modification
  • front, second, and third row seat installation
  • rear interior panel installation

WAV 4 

  • driver slide door installation and adjustment
  • driver slide door track installation
  • weatherstrip installation( Dvr, Pass, front door)
  • rear interior installation( Dvr & Pass C/D panel, upper D panels, rear threshold)
  • Dvr & Pass lower C panel, foot rest installation
  • third row seat installation
  • Dvr A/B, dash panel installation

Timeline

Team Leader

BraunAbility
03.2015 - 11.2017

Assembler/laborer 2

BraunAbility
10.2006 - Current

High School Diploma -

Lighthouse Christian Academy