Summary
Overview
Work History
Education
Skills
Timeline
Generic

Nathan Cogdell

Gaffney,SC

Summary

Reliable Superintendent with more than 15 years of construction site experience. Superb project oversight, team management, and blueprint interpretation skills Successful in meeting tight job deadlines. Hard working with the ability to shift direction when working conditions change. Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills. Combination Pipe Welder experienced in welding in all positions. Sets up jobs accurately based on skilled reading of P&ID and Isometric drawings with expert knowledge of materials and techniques.

Overview

18
18
years of professional experience

Work History

Pipe Superintendent

Renfrow Industrial
Spartanburg, South Carolina
01.2025 - Current
  • Supervised pipe installation projects ensuring compliance with safety regulations.
  • Coordinated with team members to optimize workflow and enhance productivity.
  • Trained new staff on installation techniques and safety protocols.
  • Managed inventory of materials and tools for efficient project execution.
  • Conducted regular inspections to maintain quality standards in installations.
  • Led safety meetings to promote a culture of safety awareness among workers.
  • Collaborated with engineers to interpret blueprints and project specifications.
  • Resolved on-site issues promptly to minimize delays in project timelines.
  • Managed subcontractors assigned to various tasks within a given project scope, ensuring they adhere to company policies and procedures at all times while delivering quality results within specified timelines and budgets allocated per job task.
  • Resolved conflicts between workers in a timely manner while maintaining a safe working environment.
  • Resolved technical issues encountered in the field by troubleshooting problems and providing solutions.
  • Inspected pipes for any defects or irregularities prior to welding.
  • Communicated regularly with customers regarding schedule changes or potential delays due to unforeseen circumstances.
  • Negotiated contracts between clients, contractors, suppliers when required for specific jobsite needs or requirements.
  • Analyzed data collected from daily job site reports and inspections in order to identify areas needing improvement both in terms of efficiency and safety protocols followed by personnel working under my supervision.
  • Prepared estimates for labor cost associated with each job task before beginning a project.
  • Scheduled inspections from local authorities to ensure compliance with relevant codes and regulations related to construction projects involving piping systems.
  • Inspected completed work for conformance with applicable codes and regulations.
  • Developed detailed plans for the installation of piping systems based on customer specifications.
  • Coordinated delivery of necessary material orders from vendors while monitoring budget constraints throughout the duration of the project.
  • Supervised crew of pipefitters and welders to ensure quality standards were met in a timely manner.
  • Monitored progress of projects, ensuring adherence to safety regulations and industry codes.
  • Delegated work to staff, setting priorities and goals.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Created detailed reports on operational performance metrics using advanced Excel functions.
  • Developed spreadsheets using Microsoft Excel to track financial information.
  • Utilized advanced Excel formulas to compile complex datasets into meaningful visualizations.
  • Utilized various software programs such as Word, Excel, and Adobe Acrobat.

Pipefitter

Brown and Root
Kings Mountain, North Carolina
03.2024 - 01.2025
  • Installed and maintained piping systems for industrial projects.
  • Interpreted blueprints and schematics for accurate pipe layout.
  • Collaborated with team members to ensure project timelines were met.
  • Conducted pressure tests to ensure system integrity and safety.
  • Monitored compliance with safety regulations during installations.
  • Assisted in training new employees on pipefitting techniques.
  • Resolved technical issues during installation processes efficiently.
  • Fabricated and positioned screw pipe, socket weld pipe, and stainless steel tubing.
  • Collaborate with other tradespeople such as electricians or plumbers when necessary.
  • Promoted high customer satisfaction by resolving problems with knowledgeable and friendly service.
  • Achieved cost-savings by developing functional solutions to problems.

Foreman

Keystone Constructors
Gaffney, SC
03.2015 - 03.2024
  • Developed and implemented safety protocols for the team.
  • Maintained daily logs of labor and equipment used on-site.
  • Ensured all workers adhered to company policies and procedures.
  • Provided guidance, direction, and technical assistance to crew members.
  • Monitored job progress and ensured completion within budget constraints.
  • Coordinated with other departments to ensure project deadlines were met.
  • Identified areas of improvement for increased efficiency and productivity.
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Assessed work area conditions for potential hazards or risks.
  • Managed inventory levels of supplies necessary for job completion.
  • Negotiated contracts with vendors for materials needed at construction sites.
  • Welded and assembled pipes, valves, and fittings to form complete piping systems.
  • Fabricated components according to customer specifications using welding equipment.
  • Inspected welds for quality assurance prior to and during installation.
  • Installed pipe supports, brackets, clamps, hangers., as needed.
  • Assisted other trades in the completion of their tasks as required.
  • Analyzed blueprints, schematics, P&IDs, and isometric drawings to determine optimal welding procedures.
  • Calculated dimensions of components for fabrication purposes.
  • Performed cutting operations such as oxy-fuel cutting and plasma arc cutting with precision accuracy.
  • Identified issues with existing pipelines and provided solutions accordingly.
  • Welded and worked with stainless steel and various alloys.
  • Completed skilled welds on pressure-tested pipe in field installations.
  • Welded and repaired damaged reactors.
  • Produced consistently smooth, durable welds and quality-controlled finish work.
  • Measured pipe routings and fabricated to fit existing in-line piping systems.
  • Assembled and installed variety of metal pipes and pipe fittings for both carbon steel and stainless projects.
  • Cut openings in walls and floors to accommodate pipe and pipe fittings.
  • Test plumbing systems for leaks using air pressure gauges or other testing devices.
  • Fabricate parts out of metal sheeting when required.
  • Oversee and complete permit processes for confined space entry, hot work/welding permits, and lock out tag out.
  • Measure, cut, thread, groove, bend and install piping/tubing according to specifications.

Combination Pipe Welder

CB&I
Cliffside, NC
08.2009 - 03.2015
  • Welded and assembled pipes, valves, and fittings to form complete piping systems.
  • Fabricated components according to customer specifications using welding equipment.
  • Inspected welds for quality assurance prior to installation.
  • Repaired worn or damaged parts by welding on new material.
  • Grinded metal pieces in order to obtain desired shape and size.
  • Maintained a safe work environment by adhering to safety protocols and regulations.
  • Installed pipe supports, brackets, clamps, hangers., as needed.
  • Analyzed blueprints and schematics to determine optimal welding procedures.
  • Calculated dimensions of components for fabrication purposes.
  • Performed cutting operations such as oxy-fuel cutting and plasma arc cutting with precision accuracy.
  • Tested welds through x-ray inspection methods when necessary.
  • Utilized flux core arc welding techniques for higher efficiency.
  • Set up gas tanks for shielded metal arc welding processes.
  • Joined components with job-specific welding techniques.
  • Welded and worked with stainless steel and various alloys.
  • Completed skilled welds on pressure-tested pipe and reactors.
  • Produced consistently smooth, durable welds and quality-controlled finish work.
  • Cleaned, prepared and installed pipes with various fittings and weld joints according to standardized protocols.
  • Measured pipe routings and fabricated to fit existing in-line piping systems.
  • Assembled and installed variety of metal pipes and pipe fittings for both carbon steel and stainless projects.
  • Secured pipes to structures with clamps, brackets and hangers using hand tools.
  • Welded components in flat, vertical or overhead positions.
  • Prepared material surfaces for welding by removing scale, rust or other foreign matter.
  • Adjusted weld machines to correct settings for precision and waste reduction.
  • Cut, contoured and beveled metal and structural shapes to achieve accurate dimensions.
  • Produced work using appropriate welding techniques, metallurgy knowledge and engineering requirements.

Fabrication Welder

Sanders Brothers
Gaffney, SC
08.2007 - 09.2009
  • Fabricated metal components and structures according to blueprints, drawings, and written specifications.
  • Cut metal parts with oxyacetylene torch and plasma cutter.
  • Welded metal pieces together using MIG, TIG, and other welding processes as required.
  • Performed preventative maintenance on all welding equipment.
  • Maintained a clean work area in accordance with safety regulations.
  • Operated forklifts to move large components around the shop floor.
  • Checked finished products for conformance to engineering standards before shipping out.
  • Loaded and unloaded materials onto trucks or other transportation vehicles for delivery purposes.
  • Utilized overhead cranes to lift heavy objects into place during fabrication projects.
  • Read and followed blueprints and weld diagrams.
  • Used jigs, fixtures and tools for assembly of parts and components.
  • Made steel form parts using various cutting equipment and welded part together per specifications.
  • Deposited intermittent tack welds for fit-up and alignment of work assemblies.
  • Checked cut length frequently for deviation in cut length specs.

Education

Crest High School
Shelby, NC
05.2005

Skills

  • OSHA Compliance
  • Quality Control
  • Permit Management
  • Effective Communication
  • Employee Training
  • Efficient with P&IDs and Isometric Drawings
  • Work Planning and Prioritization
  • Workplace Safety
  • Fall Protection
  • Construction Vehicles Operation
  • Site Inspection
  • Crew Leadership
  • Job Planning
  • Critical Thinking
  • Hand and Power Tools
  • Dimensions and Measurements
  • Interpersonal and Written Communication
  • Project Deadlines
  • Attention to Detail
  • Safety Policies and Procedures
  • Pipe Assembly
  • Precision Measuring Instrument Operations
  • Gas Welding Techniques
  • Torch Operation
  • Fabrication
  • MIG Welding
  • Stick Welding
  • TIG Welding
  • Combination Welding in all Positions
  • Specialized Metal Alloy Welding Processes

Timeline

Pipe Superintendent

Renfrow Industrial
01.2025 - Current

Pipefitter

Brown and Root
03.2024 - 01.2025

Foreman

Keystone Constructors
03.2015 - 03.2024

Combination Pipe Welder

CB&I
08.2009 - 03.2015

Fabrication Welder

Sanders Brothers
08.2007 - 09.2009

Crest High School