Pre- Commissioning Coordinator with 20 years of experience in the Petro-chemical and Gas Plants. With over 12 years of experience in commissioning of Polyethylene and various Gas Plants and Systems consisting of mechanical equipment, piping systems, ground flares, reactors and associated electrical equipment and instrumentation. I am a self-starter, a team player and work well with others. Dedicated professional successful at developing project plans, overseeing upgrades and analyzing mechanical problems. Skills in Software, as well as job-specific tools and equipment. Knowledgeable about successful energy conservation strategies. Enthusiastic eager to contribute to team success through hard work, attention to detail and excellent organizational skills. Clear understanding of task and training. Motivated to learn, grow and excel in Industry.

Overview

31
31
years of professional experience

Work History

Piping/Mechanical Engineering Technician

Shell Gas
Monaca, PA
11.2019 - 04.2022
  • Support the detailed planning and development to drive and monitor performances, understanding the challenges but also to drive accountability.
  • Identified mechanical problems and determined best solutions for correction.
  • Equipment function to diagnose faults and make recommendations to provide solutions.
  • Coordinated installation of systems, machinery and components.
  • Collaborated with coworkers, discussing assembly and needed product adjustments.
  • Frequently diagnosed mechanical problems and determined how to correct issues.

Mechanical Engineer

Exxon Mobil
Beaumont, TX
02.2015 - 03.2017
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts and coordinate delivery timelines.
  • Altered and modified designs to meet requirements and eliminate malfunctions.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Generated system concepts to satisfy product requirements.
  • Conducted tolerance analysis at system and subsystem levels.
  • Performed pre-construction, quality and safety management, as well as constructability review, start-up and commissioning.

Pre-Commissioning Coordinator and Mechanical Completions

CB&I, Reficar Expansion
08.2014 - Current
  • Discipline lead working as part of an interdisciplinary team of local and expatriates working at Completions Department
  • Shared responsibility for the coordination of project completions and turnover process by systems, using Win-Pcs database management platform and performing the final joint Client Field Walk-downs of a previously agreed system dossier containing the P&ID and corresponding status reports
  • Registered and systemized all the constructive elements under my direct supervision and discipline such as, Static equipment, rotating equipment, paint, pipe lines, assigning the adequate construction document to register the completion according to the procedure
  • Extracted and organized relevant set of P&ID drawings to be assigned at each system under the mechanical discipline, and perform modifications according to a scope change if necessary
  • Preparation of MCP (Mechanical Completions Package) dossier, including the P&ID drawings and inter-grating the different disciplines reports supporting the signature of the SMCC (System Mechanical Completion Certificate) - Perform Walk downs along with the client to handover sub systems, and register of punch list items, accordingly to the scope of work, when required
  • Lead the integration of quality and construction efforts thought the completions process to accomplish the discipline and subsystem mechanical completions
  • Meet with various sub-contractors as well as Company direct construction personnel to ensure compliance with completions goals is achieved and, aid in the coordination of completion work in the field, when required
  • Revise and re-write procedures according to the piping being revised
  • Coordinate/Plan general cleaning methods such as;
  • Steam systems blows, chemical cleaning of BFW systems
  • Aqua lazing of large bore steam condensate systems
  • System blows and flushing on all systems and Sub system piping in preparation for a safe and reliable start-up.

Pre-Commissioning Coordinator

CB&I, Williams Olefins Expansion
04.2013 - 08.2014
  • Coordinate/Plan general cleaning methods such as;
  • Steam systems blows, chemical cleaning of BFW systems
  • Aqua lazing of large bore steam & condensate systems
  • System blows and flushing on all systems and Sub system piping in preparation for a safe and reliable start-up
  • Lube oil flushing on equipment
  • Monitored front areas so that questions could be promptly addressed.

Piping Superintendent

Tellepsen, Kuraray Plastics
La Porte, Texas
04.2012 - 03.2013
  • Over Poly Area and Ground Flare, Responsible for the daily operations across both ISBL & OSBL
  • Supervise and provide job instructions across the operations team
  • Ensure that safe operating limits are maintained
  • Aqua lazing of large bore steam & condensate systems
  • System blows and flushing on all systems and Sub system piping in preparation for a
  • Safe and reliable start-up

Construction & Commissioning Supervisor

Lonestar LNG
, TX
09.2011 - 03.2012
  • Pipe and equipment erection and Specialist assisting with systems start-up of Fract.1 and Fract.2
  • Coordinate/Plan general cleaning methods such as; Develop daily goals, with plans to prioritize, organize, and accomplish establish goals
  • System blows and flushing on all systems and Sub system piping in preparation for a safe and reliable start-up
  • Perform pre-commissioning and commissioning procedures and assisting operations with plant start-up.

Field Supervisor & Commissioning supervisor

Fabrication & Construction
Dayton, TX
08.2004 - 02.2012
  • Proficient in reading and interpreting blue prints and schematics (P&ID, ISO, PFD, and
  • Plan view)
  • Vessel & tower internals, specialty welding, vessel modifications, code R stamp repairs
  • Piping and equipment fabrication, erection and loading for preparation for start-up
  • Grassroots Projects field erection and Pre-Commissioning, Commissioning & start-up of Gas
  • Plants
  • LNG, Polyethylene, Commissioning support, Process technical services
  • P& ID walk down for the Pre-Commissioning, Procedure and Equipment walk down
  • Prepared the deaerator, ultra-high pressure and high pressure boiler feed water pumps for commissioning
  • Part of the team that includes preparation of steam blows for the 1500#, 600#, 150#, and 15# header

Superintendent

Sulzer
Humble, TX
10.1996 - 09.2004
  • Revamps, retro-fits, vessel & tower internals, specialty welding, vessel modifications, coded “R” Stamp work.

Education

No Degree - Mechanical Engineering Technology

University of Nevada
Las Vegas, NV

Skills

Proven ability to lead and work with different disciplines and specialties providingundefined

Timeline

Piping/Mechanical Engineering Technician

Shell Gas
11.2019 - 04.2022

Mechanical Engineer

Exxon Mobil
02.2015 - 03.2017

Pre-Commissioning Coordinator and Mechanical Completions

CB&I, Reficar Expansion
08.2014 - Current

Pre-Commissioning Coordinator

CB&I, Williams Olefins Expansion
04.2013 - 08.2014

Piping Superintendent

Tellepsen, Kuraray Plastics
04.2012 - 03.2013

Construction & Commissioning Supervisor

Lonestar LNG
09.2011 - 03.2012

Field Supervisor & Commissioning supervisor

Fabrication & Construction
08.2004 - 02.2012

Superintendent

Sulzer
10.1996 - 09.2004

No Degree - Mechanical Engineering Technology

University of Nevada