Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Nicholas Galvan

YAKIMA

Summary

Dynamic Maintenance Technician with extensive experience at Oxford Suites Hotel, excelling in HVAC system maintenance and troubleshooting. Proven ability to enhance operational efficiency through effective problem-solving and adherence to safety protocols. Skilled in commercial construction and codes compliance, consistently delivering high-quality results while fostering positive customer interactions.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Maintenance Technician

Oxford Suites Hotel
05.2024 - Current
  • Installed new locks, door handles, and door closers.
  • Maintained restroom functionality by repairing leaking faucets, clogged toilets, and other equipment.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed safety protocols to minimize workplace accidents.
  • Developed and implemented strategies to improve maintenance processes.
  • Monitored and documented work performance in maintenance logs in compliance with company guidelines.
  • Reported issues to property manager so effective resolutions could be put into place.
  • Repaired and replaced pumps, valves and motors.
  • Positively engaged with customers and maintained professional appearance as company representative.
  • Installed and maintained plumbing and HVAC systems.
  • Diagnosed and repaired complex mechanical and electrical systems.

General Labor Construction Worker

People Ready Staffing
10.2022 - 05.2024
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Helped with erecting scaffolding and ladders.
  • Operated forklifts and boom lifts to complete various tasks.
  • Helped with door and window installations.
  • Installed drywall, siding and other structural components.

Metal Stud Framer

All Service Inc
02.2021 - 09.2022
  • Fabricated steel frames, columns, beams, and girders according to blueprints or instructions from site managers.
  • Reviewed work plans and blueprints to ascertain all requirements for project.
  • Worked effectively in fast-paced environments.
  • Erected Steel buildings and framed everything from a open slab

Thermoforming Lead Operator

Sonoco Plastics
03.2016 - 12.2020
  • Extended life of equipment and maintained consistent performance with regular cleaning, lubrication and basic maintenance.
  • Prevented personnel injuries during plant maintenance by practicing diligent lockout-tagout processes.
  • Performed safety checks on machines and production equipment.
  • Tended equipment during operation and monitored readouts to determine areas of concern and quickly correct problems.
  • Properly set up machines at beginning of each shift and verified function.
  • Trained new production staff members on safe and efficient production procedures and proper machine operations.
  • Used problem-solving and issue-resolution skills to promptly and successfully address production problems.
  • Examined incoming materials and compared to documentation for accuracy and quality.
  • Made sure that products were produced on time and are of good quality.

Education

GED -

Yakima Valley Community College Caps Program
Yakima, WA

Skills

  • HVAC system maintenance
  • Troubleshooting skills
  • Commercial construction experience
  • Mechanical aptitude
  • Drywall repair
  • Blueprint and schematics
  • Power and hand tool use
  • Problem-solving
  • Lockout and tagout procedures
  • Project estimation and bidding
  • Codes compliance
  • Flooring repair

Certification

  • Drivers license
  • first aid certified
  • Forklift certified

Timeline

Maintenance Technician

Oxford Suites Hotel
05.2024 - Current

General Labor Construction Worker

People Ready Staffing
10.2022 - 05.2024

Metal Stud Framer

All Service Inc
02.2021 - 09.2022

Thermoforming Lead Operator

Sonoco Plastics
03.2016 - 12.2020

GED -

Yakima Valley Community College Caps Program
Nicholas Galvan