Summary
Overview
Work History
Education
Skills
Timeline
Generic

Nicholas McDaniel

Lakeside,CA

Summary

Dynamic Pipe Layer and Glazier with proven expertise at KTA Construction, excelling in pipe welding and pressure testing. Recognized for optimizing material usage and expediting emergency repairs, while fostering strong relationships with stakeholders. Committed to safety and quality, consistently delivering projects on time and exceeding client expectations.

Hardworking Pipe Layer with safety-driven mentality in hazardous and benign environments. Personable employee with over 8 years of assembling pipes and laying out pipe routes. Skilled applying general rules to identify and solve problems.

Overview

13
13
years of professional experience

Work History

Pipe Layer /Pipefitter Leadman

KTA Construction
03.2017 - Current
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Optimized material usage by accurately determining the type, size, and quantity of pipes needed for each job site.
  • Maintained clean and organized work site, contributing to safer working environment for all personnel.
  • Expedited emergency repairs during critical breakdowns, restoring essential services with minimal downtime.
  • Conducted thorough pre-installation site inspections to assess and prepare groundwork for pipe laying, minimizing disruptions.
  • Sustained positive working relationships with subcontractors, inspectors, and other stakeholders through effective communication skills.

Glazier

Division 8 Inc.
01.2013 - 03.2017


  • Managed multiple projects simultaneously, prioritizing tasks effectively to meet all deadlines without compromising quality.
  • Monitored work site operations and safety to prevent hazards and cultivate efficiency.
  • Conducted precise glass cutting for custom projects, ensuring accurate fit and client expectations were met.
  • Fabricated and installed required hardware and moldings for glass installations.
  • Illustrated commitment to high standards of quality, accuracy and service.

Education

Associate of Science -

San Diego Mesa College
San Diego, CA
06-2012

Skills

  • Pipe welding
  • Pressure testing
  • Backfilling procedures
  • Heavy equipment operation
  • Safety procedures
  • Sewer line installation
  • Water main installation

Timeline

Pipe Layer /Pipefitter Leadman

KTA Construction
03.2017 - Current

Glazier

Division 8 Inc.
01.2013 - 03.2017

Associate of Science -

San Diego Mesa College