Summary
Overview
Work History
Skills
Accomplishments
Affiliations
Timeline
Generic

Nicholas Moore

Dallas,GA

Summary

Skilled Construction Superintendent experienced in ensuring that projects are completed on time, within budget, safely and with quality. 10+ years of experience in a wide range of projects including remodeling, new construction, housing, commercial buildings, agricultural facilities, cold storage buildings, hotels and steel structures. Experienced in supervising staff, scheduling, permitting, ordering materials and preparing project budgets and scopes. Excellent communicator and problem solver. Adept at site safety management and orderly job-site set-up. Proficient in Procore, Outlook, Windows, Excel and Microsoft Project.

Overview

20
20
years of professional experience

Work History

Senior Superintendent

Atlas Building Company of Florida
Sarasota, Florida
07.2024 - Current
  • Read and interpreted drawings and assessed construction against plans.
  • Maintained safe work site by implementing safety requirements and good housekeeping regulations.
  • Prepared and planned worksites to help jobs run smoothly.
  • Contracted and supervised workers for various construction jobs.
  • Prepared comprehensive reports summarizing progress against established goals.
  • Oversaw daily work of team using knowledge of local and national building codes for construction areas.
  • Resolved labor, design and tool issues during construction projects.
  • Initiated proactive measures to address potential delays or problems before they arose.
  • Negotiated contracts with suppliers and subcontractors while ensuring terms are mutually beneficial.

Project Superintendent II

Henning Companies
Des Moines, IA
09.2020 - 06.2024
  • Monitored overall safety by regularly inspecting job sites and confirming observation of protocols and standards by workers.
  • Scheduled staff and subcontractors, ensuring that each shift had adequate coverage so that jobs could be completed on time.
  • Answered questions from clients while conducting pre-closing walk-throughs.
  • Contacted subcontractors and asked for bids on projects, assessing if these quotes met budgetary requirements.
  • Developed on-site safety program to support team with risk mitigation.
  • Coordinated phases of construction projects from inception to completion.
  • Monitored and supported site safety initiatives to protect team members and prevent accidents.
  • Facilitated processing of RFI's, submittals and samples among general contractor, owner and owner's consultants.

Project Superintendent

Ajax Building Corporation
Savannah, GA
09.2019 - 08.2020
  • Followed strict timelines and guidelines for installations of a fast track and historical build out structure.
  • Complied with operational standards and OSHA regulations.
  • Resolved labor, design and tool issues during all phases of construction projects.
  • Maintained daily communication with vendors to drive forward progress of project.
  • Eliminated project lags by organizing works-in-progress and delegating tasks.
  • Maintained safe work environment with zero accidents or lost work days.
  • Liaised with company safety representatives to promote awareness and understanding of safety protocols.
  • Facilitated processing of RFI's, submittals and samples among general contractor, owner and owner's consultants.

Project Superintendent

Summit Livestock Facilities LLC
Remington, IN
01.2018 - 08.2019

Successfully managed and directed overall construction of multiple pre-engineered metal structures and cooler storage facilities ranging in value from 7 to 11 million.

  • Followed strict timelines and guidelines for installations of Agricultural, MEPS and pre-engineered insulated metal structures
  • Trained construction teams on site-specific requirements, techniques and procedures
  • Ensured overall safety by regularly inspecting job sites and ensuring that all personnel, including subcontractors observed protocols and standards
  • Facilitated processing of RFI’s, submittals and samples among general contractor, owner and owner’s consultants
  • Coordinated all phases of construction projects from inception to completion
  • Followed strict timelines and guidelines for installations of Agricultural, MEPS and pre-engineered insulated metal structures
  • Prepared cost and inventory reports and maintained accurate records using company work order reporting system
  • Increased process improvement initiatives and troubleshot problems for corrective action to boost functionality and workflow
  • Maintained daily communication with vendors to drive forward progress of project
  • Maintained safe work environment with zero accidents or lost work days

Superintendent/ Construction Management

Riversbend Construction Inc.
Kennesaw, GA
10.2016 - 12.2017

Successfully managed and directed overall construction of a 30 million dollar project.
Implemented weekly meetings to coordinate, schedule, direct and motivate personnel and subcontractors.

  • Facilitated processing of RFI’s, submittals and samples among the general contractor, the owner and the owner’s consultants.
    Reviewed and investigated Proposed Change Order Requests (PCOR
  • Monitored the safety of all construction activities, making on-site personnel safety the top priority. Acted as the liaison with company safety representatives to promote awareness and understanding of safety protocols
  • Led and managed resolution of all issues during project construction and commissioning phases. Performed several hands-on duties to include framing, drywall, painting, trim, hardware and plumbing
  • Efficiently recorded and rejected incorrect deliveries of material to site. Analyzed and monitored availability of materials to ensure timely completion of each project
  • Generated and Delivered status reports to president of construction for budgeting and planning purposes.

Assistant Superintendent

Carter & Carter Construction
Auburn, AL
08.2015 - 10.2016
  • Conducted weekly meetings with staff and board members to discuss operational objectives.
  • Monitored daily operations of the facility, ensuring that all safety protocols were followed.
  • Developed annual budget for the facility and managed financial resources accordingly.
  • Provided guidance and support to staff in order to meet departmental goals.
  • Drafted reports and documents related to personnel management, budgeting, and other related topics.
  • Implemented policies and procedures to ensure compliance with applicable laws and regulations.
  • Performed administrative tasks such as record-keeping and filing of paperwork in accordance with departmental standards.

Fire Sprinkler Tech

International Fire Protection, Inc.
Austell, GA
10.2014 - 08.2015
  • Built and disassembled scaffolds, bracing and barricades.
  • Performed pipe fabrication, installation and fitting according to proper specifications.
  • Inspected pipes and piping systems to assess their quality and condition. Demolition and rebuilt faulty and/or outdated systems.
  • Installed and replaced manifolds, supply pipes, control valves, risers and water supply lines.
  • Cut and beveled piping using cutting torches, saws and threading machines.
  • Followed relevant codes, regulations and safety techniques.
  • Installed and inspected new and existing pipe lines up to 18 inches in diameter.

Fire Sprinkler Foreman/Journeyman

Century Fire Protection
Duluth, GA
04.2013 - 10.2014
  • Monitored team progress and enforced deadlines.
    Served as the single point of contact for project scheduling and changes.
  • Acted as the liaison with company safety representatives to promote awareness and understanding of safety protocols.
  • Followed relevant codes, regulations and safety techniques.
  • Inspected installation sites to determine material requirements.
  • Performed pipe fabrication, installation and fitting according to proper specifications and blueprints.
  • Worked on all aspects of fire suppression systems from start to finish including :wrap, podium, garden and other various multi-family styles, ranging from 150 to 350 units.

Equipment Operator

Southeast Connections, Llc
Conyers, GA
09.2012 - 04.2013
  • Maintained operator logs, forms and records in accordance with company policies and DOT regulations.
    Documented daily equipment inspections and submitted daily inspection forms to supervisor.
  • Operated equipment safely and efficiently at all times.
  • Listened to warning alarms and responded accordingly.
    Monitored various gauges during vehicle operation and investigated and repaired any abnormalities.
  • Performed heavy labor such as ditch digging, backfilling and hauling.

Construction Superintendent / Construction Manager

Cornerstone Construction
Atlanta, GA
05.2008 - 09.2012
  • Educated general contractor personnel on the quality standards throughout the construction process.
  • Submitted all project closeout documents in accordance with the contract.
  • Assigned projects and tasks to employees based on their competencies and specialties.
  • Monitored the safety of all construction activities, making on-site personnel safety the top priority.
  • Led and managed resolution of all issues during project construction and commissioning phases.
  • Assisted the owner with bidding new jobs and projects.
  • Obtained notices of completion and compliance certifications from all of the construction administration consultants.
  • Performed construction site pre-inspections and coordinated post-construction audits.
  • Extensively trained in plumbing, carpentry, painting, plastering, roofing, drywall and installation.
  • Assisted skilled workers with construction projects in all phases of rough and finish carpentry.
  • Assisted large crews in erecting, repairing and the demolition  of building.
  • Completed indoor and outdoor multi-family residential construction projects.
  • Completed indoor and outdoor commercial construction projects.

Pipefitter Foreman

Integrity Fire Protection
Newnan, GA
10.2005 - 05.2008
  • Performed pipe fabrication, installation and fitting according to proper specifications.
  • Inspected pipes and piping systems to assess their quality and condition.
  • Created and submitted daily reports on the progress of all projects.
  • Followed relevant codes, regulations and safety techniques.
  • Performed pipe fabrication, installation and fitting according to proper specifications and blueprints.
  • Worked on all aspects of fire suppression systems from start to finish of various multi-family style ranging from 100 unit to 250 units

Skills

  • Blueprint fluency
  • Building codes and regulations
  • Baseline schedules creation
  • Budgeting and forecasting
  • Detail-oriented
  • Troubleshooting
  • Organized
  • Quality assurance and control
  • Vendor sourcing
  • Multi-unit operations management

Accomplishments

Henning Companies

1217, 5800 Merle Hay Rd #14

Johnston, IA 50131

Sept 2020- Current

  • 1.5 Million Project
  • 57 foot by 82 door Bio-Security building
  • 8 Showers with in-floor heating
  • Successfully met schedule deadline
  • 9 Million Dollar Project
  • 4 Story, 80 feet by 400 feet Steel Agricultural Structure
  • Successfully met schedule deadline

Ajax Building Company

1080 Commerce Boulevard

Midway, Fl 32343

July 2019-August 2020

  • 1 Million Remodel Project in Historic District.
  • 5,000 square feet Remodel
  • Project won Architectural Award for 2019

Summit Livestock Facilities LLC.

Jen Acres

1895 East County Road 200 North

North Vernon, In 47265

March 2018-October 2018

  • 11 Million Dollar Project
  • 200 feet by 500 feet Steel Agricultural Structure
  • Successfully met schedule deadline
  • Completed under designated budget

Cal-Maine Foods

247 Hillandale Glen

Lake City, Fl 32055

October 2018- April 2019

  • 1.5 Million Dollar Project
  • 100 feet by 150 feet cold storage
  • Successfully met schedule deadline

Riversbend Construction

Arcadia On the River

120 Pumping Station Rd.

Milledgeville Ga 31061

October 2016 - August 2017

  • 30 Million Dollar Project
  • 123 Two Story Units, 510 Bedrooms
  • Multifaceted Community with Gated Entry, Swimming Pool and Spa, Multiple Athletic Courts, and Dog Park
  • Clubhouse Amenities Included; Locker Rooms, Sauna, Tanning Beds, Fitness Center, Yoga and Computer Room
  • Successfully Met Schedule Deadline

Carter and Carter Construction

Station on McIntosh

311 West McIntosh St

Milledgeville Ga 31061

February 2016 - August 2016

  • 11 Million Dollar Project
  • 3 Three Story Buildings, 29 Units, 145 Bedrooms
  • Swimming Pool With Club House Amenities which included Fitness Center
  • Grade Beam Slabs with Spread Footers and Stem Walls
  • Underground Retention Pond
  • Successfully Met Schedule Deadline

Carter and Carter Construction

Providence of Parkway Village

5095 Southwood Road

Fairburn Ga 30123

August 2015 - February 2016

  • 20 Million Dollar Project
  • 2 buildings, 4/3 story and a 3/2 story 150 Units
  • Post tension slabs
  • 3 Elevators
  • Clubhouse Amenities included Computer Room, Fitness Center, Kitchen, and Gazebos
  • Successfully Met Schedule Deadline
  • Process Improvement
    Created new departmental procedures manual. Assessed organizational training needs

Affiliations

High School Diploma

OSHA 10 and 30 Certified

First Aid Certified

Hilti Fire Wall Certified

Competent Person Certified

Timeline

Senior Superintendent

Atlas Building Company of Florida
07.2024 - Current

Project Superintendent II

Henning Companies
09.2020 - 06.2024

Project Superintendent

Ajax Building Corporation
09.2019 - 08.2020

Project Superintendent

Summit Livestock Facilities LLC
01.2018 - 08.2019

Superintendent/ Construction Management

Riversbend Construction Inc.
10.2016 - 12.2017

Assistant Superintendent

Carter & Carter Construction
08.2015 - 10.2016

Fire Sprinkler Tech

International Fire Protection, Inc.
10.2014 - 08.2015

Fire Sprinkler Foreman/Journeyman

Century Fire Protection
04.2013 - 10.2014

Equipment Operator

Southeast Connections, Llc
09.2012 - 04.2013

Construction Superintendent / Construction Manager

Cornerstone Construction
05.2008 - 09.2012

Pipefitter Foreman

Integrity Fire Protection
10.2005 - 05.2008
Nicholas Moore