Accomplished Plumber Foreman with extensive experience at Trefz Mechanical, specializing in high-stakes installations and welding. Proven ability to lead teams effectively while mastering GTAW techniques for stainless steel. Recognized for enhancing system efficiency and ensuring project success through strong problem-solving skills and meticulous attention to detail.
Worked on schools throughout Bethlehem Pa for new heating and cooling systems
Installed 2 Weil McLain 94 series boilers 25 sections each
Underground site work at Spring House Park Complex in Norristown
Worked on mechanical and plumbing systems at Coherent in Easton Pa
Installed new chiller plant piping and processed Chilled water at Trensio
Installed new boiler plant at Trensio
Worked on Mechanical rooms for high rise apartment buildings throughout NYC
Maintained domestic water for the demolition of the old 57 story tower at 270 Park Ave
Maintained temporary roof drains at multiple floors during demolition
Installed drainage system for storm water at ground level with forced main pump lifts
Do to site being over Grand Central Terminal
Rebuilt MTA facilities that were altered during demolition of tower and new shear walls built
Built and maintained water cooling system for new shear walls concrete pours
Welded new pipe and flanges of various sizes at Newtown Creek Sewage treatment plant NYC
Welded brackets for new piping and flanges work was performed on new egg digesters
9/11 Memorial
Installed pre fabbed pipe and made necessary alterations on Stainless steel pipe for Memorial Fountains
Installed 75 horsepower pumps at lower void also known as “bath tub” of the old towers at ground zero
Installed new fountains and piping at Town Square in Rapid City South Dakota
Installed fountains at the Alfred Barnes Museum in Philadelphia Pa
Installed fountain and ice rink in Bethpage Long Island
Installed gas piping and meter piping for Co-Generation plants at NYU campus, and NYU Laguna Hospital
Drains , water piping and control work on numerous chiller plants including new plant of 25 million square feet at Columbia University
Worked on outages at NY power Authority
Worked on numerous high rise apartments throughout NYC
Welded gas riders for new boilers, water heaters, cooking ranges, new meter rooms
Worked primarily on NYC public projects including
Schools
Bus depots
Sanitation garages
Worked on various alterations of office buildings in NYC
Multiple floors for headquarters of Nasdaq
Installed and welded new piping for retrofitting ice rink at Madison Square Garden
25 floors of new core bathrooms at 195 Broadway
Installed plumbing for new laundromats throughout NYC
Residential plumbing
Learned plumbing and heating
Learned to weld carbon steel with SMAW
GTAW for carbon steel and stainless steel
GTAW for dissimilar metals using 309 wire