Summary
Overview
Work History
Education
Skills
Leadership Experience
Continuing Education
Communication Skills
Certification
Volunteer Club Soccer Coach
Timeline

Nick Walker

Sr. Project engineer
Apex,NC

Summary

Proficient Project Engineer Ten years of experience driving over 10 large scale projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget and according to specifications.

Overview

11
11
years of professional experience
1
1
Certification

Work History

Senior Project Engineer

FST Technical Services (WOLFSPEED)
12.2023 - Current
  • Write and perform pre-functional and functional performance tests for newly installed equipment in Semiconductor plant
  • Test SI Logic alarms against Scada/FMCS/BAS system master IO list
  • Perform walkdown of systems, work with contractors on corrective actions and listing/documenting nonconformities
  • Streamline efficiency of newly installed equipment and propose new and more fundamental changes when needed
  • Very compliance with specs and customer requirements
  • Created turnover package for largest facility of its kind.

Automation Technician

Strata Innovative Solutions
04.2023 - 12.2023
  • Troubleshot, fixed and improved electrical controls.
  • Responded to emergency system repairs and maintained regular service schedules for all job-related machines to optimize performance.
  • Inspected and assembled components and consumable parts.
  • Prepared automation concept and control drawings according to client specifications.
  • Used hand and power tools to mount components to panels by following dimensional layout drawings.
  • Created detailed test cases for use on diverse projects.

I&C Commissioning Lead/CX MEP Engineer/Doc Control Specialist

LotusWorks Automation (MICRON TECHNOLOGIES)
02.2020 - 03.2023
  • Write and perform functional acceptance tests for newly installed equipment in a Semiconductor plant
  • Test System Integrator Logic alarms against Scada system master IO list
  • Lead Workgroup review meetings and propose ideas that would streamline efficiency of newly installed equipment as needed
  • Review submittals and P&IDs for accuracy and preventive startup issues for client
  • Review new CX packages for missing equipment and data and raise issues when found
  • Closeout project from system level and transferring of controlled documents to customers data storage point.
  • Managed efficient teams of up to Six employees.

Lead Automation Technician/Schedular Planner

LotusWorks Automation (PFIZER)
09.2018 - 01.2020
  • Maintain user access records, backups and restores from customers secure data storage
  • Generate Audit Trails and review for data integrity
  • Recommend upgrades on equipment while troubleshooting and repairing any controls system that went down during production
  • Train new shift technicians and attend supervisors shift change meetings
  • Scheduled downtime between Automation team and Production to efficiently keep critical systems in compliance with FDA standards
  • Made orders of out-of-stock parts and items needed for upcoming PM’s.

Automation Technician

Baxter Healthcare
07.2013 - 09.2018
  • Repaired automated and semi-automated equipment in medical device manufacturing plant
  • Completed PMs on-time to stay FDA compliant, ordered spare and out of stock parts as needed
  • Made program changes to Allen Bradley, Siemens, Idec, and Soft Shop programming as needed for new installs or minor repairs
  • Repaired everything from motors, valves, Robots, servos, RF welders, drives and PLCs
  • Created new PMs procedures to minimize downtime and maximize older equipment’s OEE.
  • Troubleshot, fixed and improved electrical controls.
  • Assisted in selection of hardware components for automation projects, resulting in cost-effective solutions.
  • Trained operators on use of newly installed automation equipment, contributing to a seamless transition during implementation phases.
  • Supported Engineering and Maintenance departments with training and technical support.
  • Reviewed all test cases and test scripts for quality and identified additional areas to review.
  • Collaborated with engineering teams to design and install automated systems for new product lines.
  • Developed detailed documentation for automated processes, ensuring smooth knowledge transfer and training for operators.

Education

AAS- Electronics, Robotics and Automation Engineering -

Centralia College, Centralia, Washington
06.2012
Completed technical program with Honors while being the President of the Electronics Club, Chair of the Technology Sub Committee, Lead Chair of the Facility Tenure Committee and the Student Fee and Budget Committee. Nominated by my professors for student of the year.

Skills

  • Knowledge of Allen Bradley, Siemens Step 7 and TIA Portal
  • Construction Administration
  • Manufacturing Processes
  • Technical Drawings
  • Construction Review
  • Contract compliance
  • Change Orders
  • Asset Management
  • Engineering
  • Request for Proposals RFPs
  • Non-conforming material reports
  • Health and safety compliance

Leadership Experience

Ability to manage projects and work with those around me to complete a safe and accurate job. Managed Automation team, System Integrator, subcontractors in a fast paced and critical sector. Worked with Major Oil and Gas Companies to complete construction of Oil Well Pads and security related projects. Volunteer Licensed US Youth Soccer as a Coach for Club level Coaching.

Continuing Education

Continuing Education by taking classes on Udemy to stay up to date. Working towards Cx Certification

Communication Skills

Strong Verbal and Written Communication, clear understanding of Client/Customer/Commissioning relations.

Certification

  • NFPA 70E and OSHA 30 Training

Volunteer Club Soccer Coach

In my spare time I coach kids in the game of soccer and give them tools to succeed in school and the work place later on.

Timeline

Senior Project Engineer - FST Technical Services (WOLFSPEED)
12.2023 - Current
Automation Technician - Strata Innovative Solutions
04.2023 - 12.2023
I&C Commissioning Lead/CX MEP Engineer/Doc Control Specialist - LotusWorks Automation (MICRON TECHNOLOGIES)
02.2020 - 03.2023
Lead Automation Technician/Schedular Planner - LotusWorks Automation (PFIZER)
09.2018 - 01.2020
Automation Technician - Baxter Healthcare
07.2013 - 09.2018
Centralia College - AAS- Electronics, Robotics and Automation Engineering,
Nick WalkerSr. Project engineer