I serviced myself into being a quality team member dedicated leader with demonstrated ability to train, manage and motivate team members to achieve organizational objectives. Increasing productivity through safety, administration, and field operations. Effective at using a data-driven approach to identify, model and test automation, electrical, mechanical solutions. Experiences in Oil and Gas production led me to de very diverse and proficient in mechanical and electrical engineering design. I retain strong analytical abilities and adept at utilizing communication and controls engineering approach of equipment to measure production and operational specifications accurately. I demonstrate proficiency in maintaining accurate records and reports to support continuous improvement initiatives by upholding strong management experience.
As an inspector, I commissioned 564,000 HP of natural gas compression during the three years of my employment with Targa. I lead Targa E&C teams safely through all projects. I was responsible for hiring and managing third-party inspections groups during capital projects. Analyzed data collected during inspections to ensure accuracy and consistency. Conducted regular status meetings with internal teams and external partners to track progress against established milestones. Focused on project monitoring and management by developing forecasts and tracking expenses. Determined project staffing needs and led resource management. Notified construction management and project engineering management of other relevant personnel regarding test or production issues. Reviewed technical documents to verify that NEC/NFPA code, Targa design, and standards meet safety compliance in mechanical and electrical operational process design. Managed and resolved conflicts arising from inspection findings, negotiating between parties to achieve compliance. Monitored production processes to detect deviations from specifications or standards. I wrote the Targas station control narrative and cause and effect. Managed third-party contractors in technical calibrating and programming to match design and operational specifications. Verified software programs for usability, functionality, and design issues. Maintained accurate records of all tests conducted during the inspection process. Updated and maintained inspection records and databases for historical reference, and compliance tracking for job book turnover process. Actively worked with engineering and operations teams throughout the duration of a project in order to identify areas needing improvement or adjustment. Reviewed budget and subcontractor estimates in detail and analyzed for accuracy with scope of work relevancy in mind. Focused on project monitoring and management by developing forecasts and tracking expenses. Determined project staffing needs and led resource management. Participated in internal audits to evaluate the effectiveness of current quality control measures. Submitted project deliverables to clients, consistently adhering to quality standards. Negotiated contracts with vendors and suppliers based on company objectives and budget constraints. Identified needs and coordinated resource allocation to deliver quality standards on time and within budget
Lead Maintenance Technician, inventoried, commissioned, calibrated, and tested industrial electrical equipment to assist functionality for planned uses of medium-voltage, motor-driven compression of 300 MMCFD cryogenic gas plant. Coordinated effective preventive maintenance schedules, diagnosed faults by applying functional expertise, and troubleshooting issues to isolate root causes. Installation and repair demands of electrical and mechanical equipment, units, and systems are based on a careful review of technical documentation, maintaining an optimal spare parts inventory to meet expected safety and environmental protocols. Identified and corrected defects such as loose connections, frayed wires, faulted devices, and insufficient equipment. Adhered to all safety and environmental requirements for the Commercial and Environmental departments in order to accede to industry regulations. Aligned motors, pumps, seals, motor bearings, fan blades, fan belts, and compressor valves quarterly for annual compressor PMs. Inlet and residue gas processing, gas filterization, amine systems, hot oil systems, teg systems, propane systems, for plant circulation liquids handling.
Reported to Chaparral 100 mmcfd Cryogenic Gas Plant. Maintained plant and field facilities for equipment failure and preventable maintenance, reported to all daily trouble calls and call-outs. Utilized measuring and testing instruments such as ammeters, ohmmeters, voltmeters, and testing lamps accurately, along with gas calibrating equipment, efficiently, and safely to complete installations and repairs on existing and new facility loop commissioning. Recorded completed repairs, and acquired parts to be ordered on service call tickets/work orders. Provided effective demonstrations of alarm system device functionality. Worked closely with operations and mechanics during the loss of facility call-out and startups. Established reporting criteria and standards to effectively maintain data integrity. Compared quotes, financials for operations, and maintenance supervision in regard to being cost-efficient for budgeting areas. Worked on Cat, Waukesha, and Ariel engine units for gas compression. Commissioned 1Bcf/d cryogenic gas plant Orla, TX after the commissioning job in Olra company promoted me to take over new Mentone, TX 300mmcfd Cryogenic Gas Plant.
Provided technical services for the Completions and Production departments. Collaborated with a diverse team of mechanical engineers, licensed electricians, construction-production foremen, and lease operators. Consistently worked on utilizing drawings and manuals, and coded accurate estimates and proposals for industrial projects. Examined goals and company expectations by expanding company production and maintaining high standards of service, extensively performed mechanical and electrical utility services for industrial-based instrumentation, automation, and programming fields. Implemented safety systems on free-flowing wells, local/remote emergency shut-ins, gas lift, monitored gas sales, liquid pipeline transfers, SWD injection, and oil lact pipeline sales. Production tank and vessel high liquid level well shut-in, flare gas liquid well shut-in, pressure control well shut-in, tank battery, and saltwater disposal, VFD controls, I/O logic programming, end device calibrating, and programming. Trouble shooting interruptible utility power and battery systems. Responded to emergency call-out's and provided on-site support. Directed electricians on installation, maintenance, production equipment ratings, classifications, repairs on electrical wiring of equipment. Constructed a series of network tower's for radio repeater point to point links for remote well-site access.
Constructed electrical installs, utilizing blue prints/ P.I.D's. Orchestrated and performed electrical emt, and rigged pipe runs, from 1/2-6". Added Instrument tubing 1/8-3/4", Aluminum angle tube tray, and cable tray for oil & gas producing facilities. Set electrical switch rack's, automated (MCC) Building's, Terminated motor control panels, automated vfd, soft start enclosures, junction panels single phase three phase motors,disconnect power distribution, load center distribution transformer's, electrical heat trace, and lighting
Automated Facility Control PLC-CPU system's Total Flow, Emerson Roc, Allen Bradley. Installed and terminated, level switch's, pressure transmitter's, level transmitter's, flow transmitter’s RTD's/Thermal couple's, N/O-NC pneumatic/electrical coils, ethernet/serial protocol communications, actuated block/control valves, solar power systems. Maintained organizational cleanliness and safety in all work areas.