Organized and motivated employee eager to apply time management and organizational skills in various environments. Seeking opportunities to expand skills while facilitating company growth. Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.
Overview
10
10
years of professional experience
Work History
Quality Production Specialist
THE BOEING COMPANY
Everett, WA
01.2023 - Current
Assists with review and validation of product non-conformances and disposition type, quality procedures and engineering requirements.
Experienced in processing Inspection Record Change Requests (IRCRs), demonstrating proficiency in coordinating and implementing changes to inspection records to ensure accuracy and compliance with regulatory standards in the aerospace industry.
Proficient in processing FAA Conformities, demonstrating expertise in navigating regulatory requirements and ensuring compliance within aerospace manufacturing environments. Experience in Product Data Management (PDM), CAPPII, CMES, PQR349/PQR371, REDARS, QAIR, and MANTIS to aid in the processes.
Experience developing presentations for leadership.
Experience working with the Boeing Problem Solving Model.
Experience with systematic problem-solving skills.
3+ years of experience with Microsoft Word, Excel, Outlook, and PowerPoint.
Supports analysis to identify and evaluate the quality of products, operations and processes.
Participates in the investigation to determine root cause of nonconformance of plans.
Ability to apply basic knowledge of aerospace design, systems and integration to perform failure and forensic analysis of aerospace components and systems.
Gathers data and provides recommendations/solutions to nonconformance of plans, products or processes.
Assists with the development, modification and documentation of actions to assure problem resolution or to implement corrective/preventive action.
Assists in obtaining corrective action on nonconforming plans and hardware/processes and submits for review.
Supports concurrence and obtains commitments to support program resolution.
Participates and observes the validation associated with corrective action to assure nonconformance has been eliminated.
Verifies internal replication systems adhere to Company and regulatory standards and procedures. Creates airplane specific airborne software packages.
Conducts audits to ensure media is stored and handled per engineering defined requirements.
Assists in the creation of reports and coordinates with the responsible parties for internal distribution.
LSCC Manufacturing Representative
THE BOEING COMPANY
Everett, WA
10.2022 - 01.2023
Assist with activities across multiple functions to coordinate resolution of emergent issues in support of specific operations.
Conducts assessments of processes and practices for comparison to applicable standards and criteria. Provides limited feedback on assessment results.
Support the teammates in implementation of strategies and plans.
Works under general supervision.
Coaches, manages, mentors and inspires employees performing activities in multiple manufacturing subject areas.
Develops and implements business plans, policies, procedures, and process improvements while managing production health using Lean principles.
Develops and maintains relationships and partnerships with customers, suppliers, peers, partners and direct reports.
Provides oversight and approval of technical approaches, products and processes.
Reports production health status to various levels of leadership with professionalism.
Analyzed quality assurance data to identify trends and develop and implement corrective action plans.
Consulted with management and personnel to educate on QA standards.
Analyzed quality assurance data to identify trends and develop and implement corrective action plans.
Utilized database and other tools to manage, track and forecast event jobs.
Collaborated with leadership to establish metrics, assessing event impact.
Applied planning strategies using tools to manipulate data, assess scenarios and perform project analysis.
Wire Assembler / Panel Installer
THE BOEING COMPANY
Everett, WA
06.2021 - 10.2022
Verified job sites had correct tools and materials necessary to complete daily tasks.
Interconnected wiring and components with maximum efficiency and elegance to meet aesthetic demands.
Visually inspected and physically tested previously installed systems and modules to locate faults.
Identified and resolved electrical and environmental concerns negatively affecting system stability or efficiency.
Oriented systems to maximize solar access and optimize structural integrity.
Tracked timelines for project completion, compiling and analyzing data on materials and labor demand to forecast needs for company to place orders and hire staff.
Learned customer needs and desires to suggest specific product options.
Educated customers on project scope and methods, explaining project phases, materials and techniques involved at each stage.
Communicated effectively with clientele to maintain customer satisfaction and loyalty.
Cultivated professional client relationships by asking appropriate questions, identifying needs and providing insightful information regarding products.
Assembler Installer General B
THE BOEING COMPANY
Everett, WA
12.2017 - 06.2021
Completed accurate assembly work by positioning and aligning components.
Set up and performed hand and automatic assembly operations on components, sub-assemblies and assemblies.
Inspected finished parts and components to enforce QA standards and uncover defects prior to packaging.
Removed physical refuse and debris and organized tools to maintain safe work environment.
Performed visual and mechanical quality verifications to meet customer specifications.
Used templates and drawings to complete product according to specifications.
Monitored processes, reporting abnormalities to management team.
Operated precision tools and equipment to perform dimensions without error.
Sorted and placed materials or items on racks, shelves or in bins according to predetermined sequence.
Worked at fast and steady pace to meet production goals.
Maintained neat, organized and clean work areas to avoid safety concerns or production delays.
Kept workstation organized and orderly, making sure production parts, tools, test equipment and documentation were properly stored and maintained.
Mechanical Assembler
TECT Aerospace
Everett, WA
11.2015 - 12.2017
Kept work areas organized and clean to maximize productivity.
Completed standardized tests to assess quality and compliance with specifications.
Documented errors and quality issues for engineering department.
Removed samples, broke down assemblies and inspected individual components.
Looked for faulty components in assembly processes to prevent accidents and errors.
Inspected and tested completed products to verify function, machine capabilities or conformance to customer specifications.
Planned assembly and building operations using data from assembly blueprints, specifications and manuals.
Positioned or aligned components for assembly.
Followed safety measures and procedures to help department meet high safety rating.
Utilized blueprints, sketches and instructions to construct parts and products.
Collaborated with quality control professionals and other assembly teams.
Assembly Mechanic
Applied Technical Services, Inc
Everett, WA
09.2015 - 11.2015
Completed standardized tests to assess quality and compliance with specifications.
Looked for faulty components in assembly processes to prevent accidents and errors.
Assessed work for errors or compliance issues and made corrections and modifications.
Retrieved correct materials from product inventory to perform various fabrication duties.
Improved knowledge and productivity through continuous education and learning from foreman and senior assemblers.
Inspected and tested completed products to verify function, machine capabilities or conformance to customer specifications.
Followed safety measures and procedures to help department meet high safety rating.
Determined root cause for machinery malfunction by performing troubleshooting tasks.
Team Leader / Bulk Folder
CINTAS, Professional Uniform and Facility Services
Everett, WA
04.2014 - 09.2015
Examined final products for conformance with quality and design standards.
Serviced clothing articles by hanging, folding, packaging and tagging items for delivery to customer.
Worked closely with fellow team members to complete assignments on time and within project parameters.
Operated steam, hydraulic and other press machines to remove wrinkles from garments, also employing flatwork items to shape, form and patch articles.
Remained calm and composed to complete high-quality work, even in high-pressure situations and in hot, fast-paced environments.
Followed all manufacturer instructions when using pressing equipment to avoid mishaps with customer garments.
Steam pressed various garments, including bridal gowns, evening dresses and tuxedos, to ready items for special events.
Identified stains and water spots on clothing and used correct cleaning products for safe removal.
Improved operations by working with team members and customers to find workable solutions.
Education
Bachelor of Science - Business Management
Edmonds Community College (still enrolled)
Lynnwood, WA
01-2025
Medical Assisting
UEI College
San Diego, CA
11.2011
Bachelor of Science - Accountancy (undergraduate)
Columban College
Olongapo City, Philippines
03.1993
Skills
Quality Planning / Assurance - proficient in the use of PDM and CAPPII
Data Gathering and Documentation
Customer Service
Active Listening
Planning & Organizing
Reliable & Trustworthy
Microsoft Office
Critical Thinking
Good Work Ethic
People Skills
Relationship Building
Flexible Schedule
Organizational Skills
Interpretation of Blueprints
Wiring Diagrams and Drawings
Measurement and Calibration
Component Assembly
Product Packaging
Verbal and Written Communication
Following Procedures and Protocols
Problem-Solving
Expert in Safety Rules and Operation
Product Assembly
Blueprint Reading
Electrical Assembly
Hand and Power Tools
Cycle Counts
Mechanical and Electrical background
Pneumatic Tools
Affiliations
I enjoy dancing as a kind of exercise. My interest is singing because I was a professional singer once. My family is the most important thing to me, therefore I enjoy spending time with them on the weekends, when we go out to eat, and when we watch movies.
My 30-day Plan as a new Production Manager
As a new production manager at Boeing, my role will be critical in ensuring the smooth operation and efficiency of the production process. Here's a 30-day plan to help me get started:
Week 1: Orientation and Familiarization
Day 1-2: Orientation and Onboarding
Meet with HR for orientation, paperwork, and company policies.
Introduce myself to the team and familiarize myself with the layout of the production facility.
Day 3-4: Learn Processes and Procedures
Shadow experienced production managers to understand daily routines and processes.
Review production schedules, quality control measures, and safety protocols.
Day 5-7: Meet with Team Members
Schedule one-on-one meetings with my direct reports to understand their roles, challenges, and goals.
Conduct team meetings to introduce myself, share my vision, and gather feedback.
Week 2: Assess Current Operations
Day 8-10: Analyze Production Data
Review production reports, performance metrics, and any recent issues.
Identify areas of improvement and potential bottlenecks.
Day 11-12: Assess Equipment and Resources
Evaluate the condition of machinery, tools, and infrastructure.
Determine if any upgrades or maintenance are needed.
Day 13-14: Review Supply Chain
Meet with procurement and supply chain teams to understand inventory management and supplier relationships.
Identify any potential risks or opportunities for optimization.
Week 3: Develop Improvement Strategies
Day 15-16: Set Goals and Priorities
Define short-term and long-term goals for production efficiency, quality, and safety.
Prioritize areas for improvement basing on my assessment.
Day 17-19: Develop Action Plans
Collaborate with my team to develop action plans for addressing identified issues.
Assign responsibilities and timelines for implementation.
Day 20-21: Training and Skill Development
Identify training needs for my team members.
Schedule workshops or training sessions to enhance skills and knowledge.
Week 4: Implementation and Monitoring
Day 22-24: Implement Changes
Roll out improvement initiatives according to my action plans.
Monitor progress and make adjustments as needed.
Day 25-27: Communication and Feedback
Maintain open communication with my team and gather feedback on implemented changes and address any concerns.
Day 28-30: Continuous Improvement
Conduct regular performance reviews to track progress towards goals.
Identify further areas for improvement and plan next steps accordingly.
Throughout the 30-day plan, remember to prioritize safety, quality, and efficiency in all my actions.
Building strong relationships with my team and fostering a culture of collaboration will be essential for success in my role as a production manager at Boeing.
Timeline
Quality Production Specialist
THE BOEING COMPANY
01.2023 - Current
LSCC Manufacturing Representative
THE BOEING COMPANY
10.2022 - 01.2023
Wire Assembler / Panel Installer
THE BOEING COMPANY
06.2021 - 10.2022
Assembler Installer General B
THE BOEING COMPANY
12.2017 - 06.2021
Mechanical Assembler
TECT Aerospace
11.2015 - 12.2017
Assembly Mechanic
Applied Technical Services, Inc
09.2015 - 11.2015
Team Leader / Bulk Folder
CINTAS, Professional Uniform and Facility Services
D/Maintenance Team Lead at Boeing, The Boeing Company/ Boeing Global Services, BGS, Al Udeid AB QatarD/Maintenance Team Lead at Boeing, The Boeing Company/ Boeing Global Services, BGS, Al Udeid AB Qatar