Framer
Aaron Wallace Construction
Appleton
06.2023 - 03.2025
- Utilized various tools, equipment, materials and forming systems to complete construction tasks.
- Attached insulation material between wall studs or ceiling joists to provide thermal protection.
- Cleaned job sites by clearing away carpentry debris and waste.
- Measured and marked cut lines on materials using ruler or marking gauge.
- Fitted, cut and installed wood trim.
- Installed windows, flooring, or trim using hand or power tools.