Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Norberto Velasquez

Jacksonville,FL

Summary

Dedicated and adaptable professional with a proactive attitude and the ability to learn quickly. Strong work ethic and effective communication skills. Eager to contribute to a dynamic team and support organizational goals. Experienced and dependable general worker with a proven track record of efficiently completing tasks in various settings. Skilled in manual labor, equipment operation, and maintaining a clean and organized workspace. Safety-conscious with a strong work ethic and the ability to adapt to different environments. Ready to contribute to a dynamic team and make a positive impact. Results-oriented individual with a passion for continuous learning and innovation. Known for leveraging analytical thinking and creativity to solve problems and deliver high-impact solutions in fast-paced environments. Motivated construction laborer committed to learning and implementing skilled trades and meeting customer needs. Follows instructions and leads others with equal proficiency. Cultivates productive working relationships and instills confidence and trust. Disciplined professional focused on completing highest quality construction work. Skilled builder with manual dexterity, depth perception, and reading and math skills to add value to diverse job site roles. Committed to learning skilled trades and to long-range career in field.

Overview

6
6
years of professional experience

Work History

Cladding Installer

Pro Metal Contractors
Jacksonville, FL
06.2022 - Current
  • Cleaned up site after completion of job including removal of debris and discarded materials.
  • Applied sealants around windows and doors to ensure a waterproof finish.
  • Worked collaboratively with other team members to complete projects within deadlines.
  • Assisted in the preparation of materials and equipment for cladding installation.
  • Ensured proper disposal of waste created during installation process according to company guidelines.
  • Performed routine maintenance on tools and machinery used in the installation process.
  • Attended regular meetings with supervisors to discuss progress on current projects.
  • Followed safety protocols when operating power tools and ladders.
  • Ensured that all components were properly aligned before securing them with screws.
  • Read and interpreted specs, building plans, blueprints and sketches to successfully complete each task.
  • Loaded and unloaded ladders, walk boards, latter jacks and other large tools and equipment to prepare for job tasks.
  • Applied precut siding and manually cut material to size and shape at work sites.
  • Cut and trimmed material to shape to fit around windows and corners.
  • Followed sequence indicated by numbers printed on pieces and interlocked pieces through tabs at edges to properly attach siding.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals.
  • Repaired and maintained surface materials to make building exteriors weatherproof and waterproof.
  • Monitored job sites for adherence to quality control procedures throughout the project life cycle.
  • Ordered necessary materials from suppliers in a timely manner to meet project deadlines.
  • Assisted in training new workers on proper techniques for handling cladding materials safely and efficiently.
  • Communicated regularly with clients about progress of jobsite activities and any changes in the scope of work due to unforeseen circumstances.
  • Coordinated with other trades such as carpenters, electricians, plumbers and painters.
  • Responded promptly to customer inquiries regarding product availability, delivery timescales, pricing information.
  • Prepared detailed cost estimates for each job based on labor hours required and materials needed.
  • Evaluated completed projects for conformance to applicable building codes and regulations.
  • Troubleshot problems encountered during construction process quickly.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Maintained cleanliness and orderliness in lift areas, including stations and equipment.
  • Trained new employees on ride operations, pointing out safety mechanisms and features.

Siding Installer

Walisson Norbe Siding Construction
Jacksonville, FL
01.2018 - 06.2022
  • Inspected work sites for safety hazards before beginning work.
  • Repaired minor damage caused by weather conditions or accidents after completion of projects.
  • Ensured that all nails were placed at proper angles so that siding would not come loose over time.
  • Utilized hand tools such as hammers, saws and drills in order to complete projects.
  • Assisted other workers in loading and unloading materials onto job sites when needed.
  • Performed periodic maintenance checks on all tools used during installation process.
  • Measured, cut and installed siding materials to specified dimensions.
  • Read blueprints and followed instructions provided by supervisor regarding specific tasks required for each job.
  • Replaced damaged or rotten wood with new material when necessary.
  • Built scaffolding or ladders for access to higher sections of building exteriors when needed.
  • Covered exposed areas with plastic sheeting when painting or staining was required.
  • Worked closely with other tradespeople such as electricians and plumbers to ensure seamless integration between different components of project.
  • Prepared surfaces for siding installation by sanding, scraping, cleaning or removing old siding.
  • Read and interpreted specs, building plans, blueprints and sketches to successfully complete each task.
  • Graded the surface beneath the siding in order to ensure proper drainage away from structure.
  • Operated saw blade in reverse to cut pieces of vinyl.
  • Loaded and unloaded ladders, walk boards, latter jacks and other large tools and equipment to prepare for job tasks.
  • Followed sequence indicated by numbers printed on pieces and interlocked pieces through tabs at edges to properly attach siding.
  • Cut and trimmed material to shape to fit around windows and corners.
  • Applied precut siding and manually cut material to size and shape at work sites.
  • Operated equipment with strong focus on safety and ground communication.
  • Tended pumps, compressors or generators to provide power or heat or move materials.
  • Ensured that all siding was installed according to manufacturer's specifications and customer requirements.
  • Worked closely with architects and engineers during planning stages of projects in order to ensure that designs meet customer expectations.
  • Organized crew schedules, assigned tasks, monitored progress, and provided feedback to workers on their performance.
  • Identified opportunities for improvement within existing processes or procedures.
  • Identified potential problems that could delay completion of projects or increase costs before they occurred.
  • Prepared cost estimates for new projects based on labor hours, material costs, overhead expenses.
  • Assessed the quality of work performed by subcontractors and addressed any issues or discrepancies as necessary.
  • Inspected finished product for defects or damage prior to final approval from customer or supervisor.

Skills

  • Project Estimation
  • Hand tools proficiency
  • Proper Measurement
  • Window Capping
  • Siding Installation Techniques
  • Wood Siding Experience
  • Code Compliance
  • Project Management
  • Fiber Cement Siding
  • Corner Post Trimming
  • Time management abilities
  • Demolition and Destruction
  • Hand and Power Tool Operation
  • Attention to Detail
  • Problem-Solving
  • Multitasking
  • Joint sealing
  • Worksite Safety and Maintenance
  • Form Construction and Removal
  • Soffit and Fascia Work
  • Flashing Installation
  • Vinyl Siding Expertise
  • Scaffolding Setup
  • Fall protection
  • Adaptable learning
  • Cladding Installation Techniques
  • Repair Procedures Determination
  • Surface Waterproofing
  • Labor Estimates
  • Responsible and Adaptable
  • Scaffolding Erection
  • Spray Gun Operations
  • Professionalism
  • Team Collaboration
  • Analytical Thinking

Languages

English
Professional
Spanish
Native/ Bilingual

Timeline

Cladding Installer

Pro Metal Contractors
06.2022 - Current

Siding Installer

Walisson Norbe Siding Construction
01.2018 - 06.2022
Norberto Velasquez