Summary
Overview
Work History
Education
Skills
Hobbies and Interests
Languages
Timeline
Generic

Norman Strickland

Newberry

Summary

With over a decade of experience in the construction industry, this candidate consistently demonstrates dedication and commitment to delivering high-quality work. Starting as a general laborer in Gainesville, Florida, they were immediately involved in the construction of a six-story VA hospital, where they quickly recognized the importance of precision in operations. To enhance their skills, they obtained a rigging certification, allowing them to expertly guide crane operations for material transfer, such as rebar. In their role within the construction industry, they have developed a diverse range of skills and responsibilities, including high-rise concrete work, constructing footers, columns, and walls, as well as framing elevators and installing decking, table systems, rodbusters, and rebar manufacturing. Additionally, they are trained in floor stripping and have experience as a layout apprentice. They are proficient in operating heavy machinery such as excavators, warehouse forklifts, 10-ton forklifts, skid steerers, rollers, loaders, and backhoes. As a rigger groundman, they have played a crucial role in ensuring safe and efficient operations on various projects. Throughout their career, they have successfully overseen the construction of diverse projects including hospitals, educational institutions, upscale hotels and residential complexes, parking structures, and military installations. Their unwavering commitment to excellence and extensive skill set make them a valuable asset to any construction team.

Overview

17
17
years of professional experience

Work History

Concrete Construction Laborer

Scherer Construction
09.2024 - Current
  • Promoted a clean worksite environment by consistently collecting trash, excess materials, and discarded equipment during all phases of construction.
  • Ensured quality workmanship with precise leveling and aligning of concrete during the curing process.
  • Contributed to a positive work environment by cooperating with team members, sharing knowledge and best practices for efficient task completion.
  • Maintained project timelines by efficiently operating various concrete tools and machinery, such as power saws, mixers, pumps, and trowels.
  • Contributed to project success by installing rebar and wire mesh reinforcement materials for added strength in concrete structures.
  • Supported project completion by setting up and dismantling concrete forms, framework, and scaffolding.
  • Collaborated with team members to complete tasks on time while adhering to construction plans and specifications.
  • Improved crew productivity by effectively mixing, pouring, and spreading concrete for various construction projects.
  • Assisted in minimizing project delays by promptly addressing equipment malfunctions and coordinating repairs or replacements as needed.
  • Demonstrated adaptability with successful completion of diverse tasks including foundation work, wall construction, slab creation, retaining walls installations.

Residential Roofer

Quality Framing
04.2024 - 09.2024
  • Repaired damaged roofs due to weather events or wear-and-tear, prolonging the lifespan of residential homes'' exteriors.
  • Troubleshot roofing issues during inspections, identifying areas in need of repair or replacement.
  • Performed precise measurements of roofing materials, ensuring appropriate cuts for optimal fit and minimal waste.
  • Ensured accurate material estimates for projects, reducing waste and minimizing expenses.
  • Enhanced customer satisfaction by efficiently completing roofing projects on time and within budget constraints.
  • Exceeded client expectations by consistently delivering high-quality work and ensuring a seamless experience from consultation to project completion.

Concrete Field Engineer

Universal Engineering Sciences, Inc
01.2024 - 04.2024
  • Enhanced safety compliance on job sites through diligent monitoring, proactive communication, and employee training initiatives.
  • Ensured accurate concrete strength results by conducting comprehensive field testing and monitoring procedures.
  • Developed innovative formwork solutions for challenging architectural designs, resulting in aesthetically pleasing structures.
  • Assisted with bid preparation by providing technical expertise on proposed solutions and cost-saving measures during negotiations.

Site Foreman

CSM Construction
02.2020 - 01.2023
  • Outline - As one of4 site foremen for CSM Construction, I oversaw daily operations for6 major sites including a warehouse for UPS, an international airport apron hanger, an elementary school, a dealership parking garage, a high-rise luxury hotel, and a high-rise luxury apartment
  • Responsibilities
  • Oversaw the daily allocation of tasks, including the precise number of masonry blocks laid and the strategic emplacement of reinforcing bars within excavation sites for concrete footers
  • Diligent supervision and coordination of construction personnel and subcontractors, ensuring the seamless progression of daily operations, reporting to the Superintendent
  • Led the framing crew and conducted daily Task Hazard Analysis (THA) meetings to ensure our adherence to a schedule that was both safe and efficient
  • Project - The BMW of Wesley Chapel project represents a substantial $24 million investment and features the construction of an expansive parking garage in collaboration with CSM
  • This monumental structure spans seven stories, covering nearly130,000 square feet, strategically situated on an approximately4-acre parcel under the ownership of Morgan Auto Group
  • For18 months, our dedicated team expertly managed the excavation process, the precise placement of footers and columns, and the efficient coordination of material transportation to and from the site, including the skilled direction of crane operations
  • This ambitious project reached its successful completion in June2022

Site Foreman

KD Construction
01.2017 - 01.2020
  • Outline - As one of4 site foremen for KD Construction I oversaw daily operations for4 major sites of high-rise luxury apartments in Doral, Pompano Beach, Downtown Tampa, and West Palm Beach, Florida
  • Responsibilities
  • Meticulous assembly of beams and tables for the parking garage structure, as well as overseeing the intricate process of stripping, jumping beams and tables, and managing the logistical flow of materials to and from the site
  • Diligent supervision and coordination of construction personnel and subcontractors, ensuring the seamless progression of daily operations, reporting to the Superintendent
  • Led the framing crew and conducted daily Task Hazard Analysis (THA) meetings to ensure our adherence to a schedule that was both safe and efficient
  • Led with a team of4 leading hands and approximately40-50 staff all-together
  • Project - I was the lead coordinator for the Altis Grand Central project, a prestigious endeavour valued at $59 million
  • This significant project commenced towards the end of2017 and transitioned into the early months of2018, under the subcontracting jurisdiction of Altman Contractors
  • We achieved successful project completion in March2019
  • The scope of this venture included expert forming and block work for an eight-story residential complex housing314 apartment units

Foreperson

CECO Construction
01.2015 - 01.2017
  • Outline - As Foreperson for CECO Construction, I reported to the Superintendent on several large projects such as high-rise luxury apartments, and parking garages
  • Responsibilities
  • Managed crews tasked with stripping decks and pouring concrete
  • Ensured the precision of setups and alignments, laying the groundwork for slab-on-grade foundations, and coordinating the assembly of scaffolding for decking
  • Led with a team of4 leading hands and approximately40-50 staff all-together
  • Managing Site H&S
  • Project - The Hermitage project, valued at65 million dollars, involved my leadership in managing the decking crew in addition to supervising both the framing and column crews
  • My responsibilities included conducting daily Task Hazard Analyses (THAs) throughout the project, which spanned from the beginning of2015 until the onset of2016
  • Operating as a subcontractor for Construction Engineering Group (CEG), the project's scope encompassed the development of348 upscale one and two-bedroom residential units, with my specific focus on the shell work

Site Foreman

Allen Spear Construction
01.2008 - 01.2015
  • Outline - As site foreman for Allen Spear Construction I oversaw daily operations for a VA hospital in Puerto Rico, Gainesville, Florida, and New Orleans, Louisiana
  • I've also contributed to other projects including a hospice centre in Jacksonville, Florida, a hospital and an IT tech school in Panama City, Florida, a music convention centre in Nashville, Tennessee, a storage bunker on a U.S Army base in Fort Campbell, Kentucky, and a Navy base training facility in Red Bank, South Carolina
  • Responsibilities
  • Oversaw the daily allocation of tasks, including the precise number of masonry blocks laid and the strategic emplacement of reinforcing bars within excavation sites for concrete footers
  • Diligent supervision and coordination of construction personnel and subcontractors, ensuring the seamless progression of daily operations, reporting to the Superintendent
  • Conducted daily Task Hazard Analysis (THA) meetings to ensure our adherence to a schedule that was both safe and efficient
  • Led with a team of4 leading hands and approximately40-50 staff all-together
  • Project - $26M
  • Sub-contracted under Clark Construction
  • This multi-building site covers29 acres of land in the heart of New Orleans
  • The project was one of the single-largest construction projects in the city's history
  • I was the Site Foreman, reporting to the Superintendent
  • I rigorously enforced safety protocols and consistently engaged in proactive problem-solving to maintain project momentum and adherence to timelines
  • I provided mentorship and direction to junior staff members, fostering a learning environment and enhancing skill sets across the team
  • I served as the key point of contact between project managers and stakeholders, ensuring clear communication and alignment of project goals The project reached successful completion in2016, marked by exemplary standards of excellence in construction practices

Education

HS DIPLOMA - undefined

Bronson High School
Bronson, FL

Skills

  • Site Managed up to the value of USD65M
  • Procore
  • Team leadership and ability to develop and grow the skillset of the team
  • Communication with all stakeholders
  • High level of craftsmanship — lead by example

Hobbies and Interests

Gardening is my passion, and I find my greatest joy among the branches of fruit trees, nurturing them to bear the sweetest of harvests. With skillful hands and a creative spirit, I transform timber into artful pieces of furniture, a craft honed in the woodshop that echoes the legacy of my father's renowned local enterprise, Strickland's Custom Cuts. Beyond the sawdust and blooms, I'm an adventurer at heart, finding solace in the embrace of nature through the tranquil patience of fishing, the exhilarating challenge of trekking, and the primal thrill of the hunt.

Languages

Spanish
Professional Working
English
Native or Bilingual

Timeline

Concrete Construction Laborer

Scherer Construction
09.2024 - Current

Residential Roofer

Quality Framing
04.2024 - 09.2024

Concrete Field Engineer

Universal Engineering Sciences, Inc
01.2024 - 04.2024

Site Foreman

CSM Construction
02.2020 - 01.2023

Site Foreman

KD Construction
01.2017 - 01.2020

Foreperson

CECO Construction
01.2015 - 01.2017

Site Foreman

Allen Spear Construction
01.2008 - 01.2015

HS DIPLOMA - undefined

Bronson High School
Norman Strickland