Summary
Overview
Work History
Education
Skills
Certification
Affiliations
Personal Information
Timeline
Generic
Norvin Michael Calvo Papel

Norvin Michael Calvo Papel

Antipolo City,Philippines

Summary

Accomplished professional with expertise in Project Management and Site Supervision, proficient in Autocad, 2D, 3D, REVIT, BIM, LUMION, SKETCHUP, and VRAY. Demonstrates strong capabilities in MS Office applications including Word, Excel, PowerPoint, and Microsoft Edge. Adept at overseeing complex projects from inception to completion with a focus on efficiency and quality. Career goal includes leveraging technical skills to drive innovative solutions in architectural design and construction management.

Innovative Architect with reputable background in diverse design and construction project management. Leverages industry knowledge and experience to bring complex concepts and sustainable designs to fruition. Committed to eco-responsible practices and land management.

Overview

23
23
years of professional experience
6
6
years of post-secondary education
1
1
Certification

Work History

Freelance Architect

Free-lance Architect (Design-Build)
04.2016 - 05.2025
  • C24 Unit 1G Cambridge Vill. Phils
  • Carrisa Homes/Amaya and SpringTown Homes-Residential Housing Cavite Phils (Lhoopa Inc, Owner –Developer) April 2022 -March 2024
  • Maple Grove Project- 10 Storey Condominium. FDAS and Auxiliary Works. Bacao 1 Gen Trias Cavite Philippines {May 2021- June 2022}
  • 2 Storey Church- Design Development /Supervision 24 Ignacio Cruz St. San Roque Marikina City {March 2022 – July 2023}
  • 1 Storey Pharmacy - Design And Supervision’ Kabayan Rx Pharmacy, {June 2023}
  • 2 Units Office with Additional Roofdeck, Villa Grande Subd, Antipolo City, Design and Supervision {May 2023 - Nov 2023}
  • Propose 3-Storey Residential with Roofdeck, Mr and Mrs. Mitchelle Galvez –Batangas Phils{Bldg Permit Stage} {Sept -Oct 2017}
  • Warehouse Renovation “Seaquest Logistics, Cupang Muntinlupa City Phils (June – Sept 2016) (Renovation Works Completed) Phils.
  • 3 Story Residence, (Civil Works) Ms. Lynette Guzman, Manila, Phils (Oct -Dec 2016)
  • 2-Store Residence w/ Deck, Marivic Rellora Residence –Pasig City Phils. (March 2017)
  • 6-Storey Residential Renovation, Mr. Marco Chen -San Juan Manila Phils.(August 2017)
  • 3 Storey Residence, Lynette Guzman – Luan st. Hobart Subd. Commonwealth Quezon City (Sept-Jan .2017) (Completed
  • 2 Storey Residential with Roofdeck, Mr and Mrs. Jindos Trazo –Cainta Rizal Phils. {Construction Dec 2017 –April 2018}
  • 3-Storey Residence with attic, Mr. and Mrs. Macadangdang – Country homes Cainta Rizal (For Building Permit stage July 2018}
  • 3-Storey w/ Deck w/ 20 Unit Apartment, Mr. and Mrs. David – Bulacan Phils.(Sept 2018 -Jan 2019)
  • 2 Storey Residence and 3 storey 9-Units Apartment Building, Owner: Mr and Mrs Bracamante, and Masangkay – Cubao QC Oct 2018 (Design Stage)

Site Engineer Cum QA/QC ENGINEER

AMANA QATAR CONTRACTING
Doha
03.2015 - 03.2016
  • Company Overview: P.O. Box 23377 Doha Qatar Tel No. +974 4 401 6222
  • Monitor of daily work accomplishment and ensuring we comply baseline project schedule.
  • Revise commented shop drawings for all trades by consultant and immediately resubmit for catch up schedule and inspections.
  • Supervise civil, structural & Archl works as per QA/QC procedures and ITP (Inspection and Testing Plan)
  • Ensure all approved plans, Specifications. and all works are strictly implemented/ compliance to ASHGAL (PUBLIC WORKS AUTHORITY)
  • Strict compliance of Project Quality Plan (PQP)& Qatar Construction Specification (QCS 2010)
  • Make QC and Status Report to ASHGAL (QATAR PUBLIC WORKS AUTHORITY), Strictly comply QHSE and standards.
  • Submit Material Testing to laboratories for Compliance Testing of all materials used at the project.
  • P.O. Box 23377 Doha Qatar Tel No. +974 4 401 6222
  • Project Handled: 4- New Schools In Doha (Package 4) (QR 370 MILLON) ASHGAL PROJECT (QATAR PUBLIC WORKS AUTHORITY)

Project Engineer

ARABTEC SAUDI ARABIA LTD
Alhasa, KSA
03.2012 - 03.2014
  • Company Overview: P.O .Box 140091 Tel +966 (12) 612 7735, www.arabtecsaudi.com
  • Involve in the submittal of shop drawings & material submittals and RFI forms and queries.
  • Expedite all civil, structural, architectural and infra works ensuring quality, safety and time accomplishments, directly reporting to Construction Manager.
  • Involve daily work schedule monitoring, work request and site productivity rate including quality of works of manpower.
  • Attend to regular technical & management meetings with Engineers, and Site Managers.
  • Coordinate with QC Engineers for target Accomplishment base from Project Schedule.
  • P.O .Box 140091 Tel +966 (12) 612 7735, www.arabtecsaudi.com
  • Project Handled: Saudi Arabian National Guard Housing Project 5000 Villas Including Landscape and Infrastructure (SR 5 Billion Contract)

Junior Architect (Technical Support Group)

REDCO CONSTRUCTION ALMANA
Doha
06.2010 - 10.2011
  • Company Overview: P.O. Box 23300, Doha Qatar Email: info@redcoalmana.com
  • Involve in the overall inspection and supervision of all architectural works of the project, directly reporting to Technical Manager.
  • Hands on supervision and strict monitoring 8- Buildings simultaneously & coordinate to errors and discrepancies to other trades & disciplines.
  • Involve in making Construction Drawings/Shop Drawings & ensuring compliance with Governing authorities. And compare Asbuilt Plans with CIVIL DEFENCE DRWG. If there are changes or revisions.
  • Check carefully consultants drawing comments and immediately revise drawings to avoid errors in execution.
  • Make, as-built drawings prior to hand over.
  • Created Site Memos, Site Instructions under the instruction of Senior Architect.
  • P.O. Box 23300, Doha Qatar Email: info@redcoalmana.com
  • Project Handled: Business Park Hotel Facilities Project Najma Qatar. 5 –Office Bldgs + 3 Basement (2) 1- Conference Bldg (3) 1-Showroom Bldg (4) 7 –flats Crown Plaza Hotel + 3 Basement (QR 750 Million Contract)

Site Architect/Building Inspector

MLVC ENGINEERS & CONSULTANT
Taytay, Philippines
04.2009 - 01.2010
  • Company Overview: 268 Date Palm St Palmera Hills Taytay Rizal, Phils.
  • Involve in the design proposal for all design issues and production of / shop drawings, Coordination Drawing & Detail Drawings.
  • Inspected works as per contract Documents. Evaluate Contractors Billings, Make Punchlist, prior to project turnover.
  • Monitoring & quality control of daily works and checking all material/ deliveries at site if complies with the Specification and contract.
  • Deals with critical construction issues, Technical and coordination meetings.
  • Check for the compliance of Governing Authority & Bldg Codes, and its implementation at site for proper execution.
  • 268 Date Palm St Palmera Hills Taytay Rizal, Phils.
  • Project Handled: (1) Mandaluyong Executive Mansion III (MEM III) 7- Storey Cityland Condominium Bldgs (2) GET Grand Emerald Tower 40 Storey Condominium Tower Bldg.(P 175 Million Pesos –Contract)

Freelance Architect

FREELANCE ARCHITECT/ DESIGNER
Antipolo
01.2008 - 03.2009
  • The “ENSO SPA” 2nd Flr. E. Bldg, Bagumbayan Libis Quezon City (Jan- March 2008)
  • 2-Storey Res.Bldg. Nina Belgica Residence -, Cainta Rizal Phils (May –Aug 2008)
  • 2-Storey Res. Bldg. Martin Joseph Residence- Compound San Isidro, Cainta Rizal Phils (Sept –Nov 2008)
  • Bungalow Res. Renovation, Alasaas Residence- Antipolo Rizal Phils (Dec 2008 –Jan 2009)
  • 2- Storey Res. Renovation & Landscape Alex Santos Residence Antipolo City Phils (Feb –March 2009)

Cadd Operator/ Detailer

AL-ARAB ELECTROMECHANICAL ENGINEERING
Doha
12.2006 - 12.2007
  • Company Overview: P.O Box 23817 Doha Qatar
  • Created builders shop drawing plumbing, electrical, hvac and firepro directly reporting to Technical Manager for urgency at site.
  • Assist Engineers in making levels for electro-mechanical combined services to other trades to avoid conflicts and discrepancies and clashes for checking by consultant.
  • Production of Coordination Drawings CSD for mepfs services/ Revised Tender Document Drawings and reflect as per site condition.
  • Created As-built and shop drawings.
  • P.O Box 23817 Doha Qatar
  • Project Handled: (1) Porto Arabia “The Pearl Qatar” Project 3 -Condominium Towers 23 Flats + 5 Basements – Parcel 08 Morocco Tower, Parcel 16A Morocco Tower, Parcel 08B Tuscan Tower (Multi-Billion QR Project)

Cadd Operator/ Detailer

HILMARCS CONSTRUCTION CORPORATION
Quezon City
01.2005 - 11.2005
  • Create all working drawings/ shop drawings and construction details for all services plumbing, electrical Mechanical, Arch’l & Structural.
  • Make Layout Plan for Details for various projects, main project, the curtain wall installation of archll glass and structural frames of scenic elevator.
  • Produce Asbuilt Plans for occupancy permit and other relevant permits prior to project turnover.
  • Make Drawings and Document Transmittals to various Design Consultants, City Engineers office and Clients.
  • Make Interior fitout Design Proposals & details a/ 3d renderings for the Makati Hall of Justice and other ongoing projects.
  • Project Handled: (1) Redevelopment of Magallanes Park Interchange, Phase 1 (2) Makati Additional Scenic Elevator, (3) Makati Hall of Justice, (4) Makati Police Station Bldg.

Cadd Operator /Project Coordinator

JMR MANALANG AND ASSOCIATES
San Andres Malate, Philippines
10.2002 - 12.2004
  • Company Overview: Malate Manila, Phils
  • Make Drawing Documentation and Submittals.
  • Created Preliminary Designs & Plans space programming, details and Interior and exterior renderings.
  • Revise Designs floor plans & Interior Design, electrical, ceiling plans & furniture layout as per owners requirements.
  • Site Inspections, supervision and site measurements, manpower allocation and daily site works.
  • Created Bill of Materials & Quantity surveying works including inventories and deliveries.
  • Malate Manila, Phils
  • Project Handled: (1) Office Unit Rm 1405, Medical Plaza Condo. Phils., (2) Residential Renovation, QC Phils, (3) 4 Units Music and Entertainment Rooms 2nd FLr Walter Mart Mall, Bulacan Phils

Education

Bachelor of Science in Architecture -

Technological Institute of The Philippines
Quezon City, Philippines
06.1998 - 03.2004

Certificate of Registration/Licensed Architect -

Professional Regulation Commission
Manila,Philippines
06.2006 - 06.2006

Skills

  • Project Management
  • Site Supervision
  • Autocad
  • 2D
  • 3D
  • REVIT
  • BIM
  • LUMION
  • SKETCHUP
  • VRAY
  • MS Office
  • Word
  • Excel
  • Powerpoint
  • Microsoft Edge

Certification

  • CPD Seminar/Training: Complete Plumbing System Design for Buildings, PRC CPD Accreditation
  • CPD Seminar/Training: PROJECT COST ESTIMATES, PRC CPD Accreditation
  • Certificate of Course Completion, AutoCAD 2D, 3D & Rendering, Microcadd Technologies Inc. Phils.
  • Certificate of Eligibility Civil Service Commission, CAREER SERVICE SUBPROFESSIONAL, Manila, Philippines

Affiliations

  • Saudi Council of Engineers, Eastern Region Dammam, Saudi Arabia, 2013
  • United Architects of the Philippines (UAP), Q.C. Silangan Chapter, Philippines

Personal Information

Nationality: Filipino

Timeline

Freelance Architect

Free-lance Architect (Design-Build)
04.2016 - 05.2025

Site Engineer Cum QA/QC ENGINEER

AMANA QATAR CONTRACTING
03.2015 - 03.2016

Project Engineer

ARABTEC SAUDI ARABIA LTD
03.2012 - 03.2014

Junior Architect (Technical Support Group)

REDCO CONSTRUCTION ALMANA
06.2010 - 10.2011

Site Architect/Building Inspector

MLVC ENGINEERS & CONSULTANT
04.2009 - 01.2010

Freelance Architect

FREELANCE ARCHITECT/ DESIGNER
01.2008 - 03.2009

Cadd Operator/ Detailer

AL-ARAB ELECTROMECHANICAL ENGINEERING
12.2006 - 12.2007

Certificate of Registration/Licensed Architect -

Professional Regulation Commission
06.2006 - 06.2006

Cadd Operator/ Detailer

HILMARCS CONSTRUCTION CORPORATION
01.2005 - 11.2005

Cadd Operator /Project Coordinator

JMR MANALANG AND ASSOCIATES
10.2002 - 12.2004

Bachelor of Science in Architecture -

Technological Institute of The Philippines
06.1998 - 03.2004
Norvin Michael Calvo Papel