5 years general professional experience,
I have worked as a Quality Engineer in Manufacturing,Welding and Galvanizing departmens.
Participate and organizated for Lab.Test (Tensile, Chemical, Charpy, Bending)
Having experience manage to overseas projects (USA, Canada,Sweden, Finland, Estonia.) acc. to projects ITP.
I have experience in Kaizen / 5S / Lean manufacturing applications.
Preparing Welding Plan and organizate Project’s Ndt control (RT, UT, MT, VT).
Performed quality audits in different supplier facilities.
I have knowledge in the preparing to Automotive Quality Documents (FMEA, PPAP, APQP).
-Analyzing and enforcing of technical specification for Project requirements ITP.
-Managing and monitoring all quality control activities (raw material, serial manufacturing, hot dip galvanizing, welding).
-Preparation of Internal instructions and procedures for the quality system.
-Prepared quality control reports in order to detect and avoid nonconformities.
-Participating in customer meetings and providing the necessary organization to customer requests.
-Preparation and delivery of staff performance evaluations.
-Providing the necessary organization for Lab.Test (Tensile, Chemical, Charpy, Bending, Copper Sulphate and Stripping Test)
-Preparing Welding Plan and organizate Project’s Ndt control (RT, UT, MT, VT).
Lead Kaizen/lean production team, responsible of 5S operations.
-Performed quality control audits on pre-production supply chain, verifying continuity of raw materials.
-Providing the organization of quality team.
Project Name: Jim Bridger Transmission Line – Quanta Services Houston, USA
- Analyzee the of the project's ITP.
- Witness all the production parameters. Review all the necessary quality documentation.
- Managing and monitoring all customer inspection requirements at site (raw material, manufacturing, hot dip galvanizing,
dulling process, welding)
- Providing the necessary organization for Lab.Test (Tensile, Chemical, Charpy, Bending, Copper Sulphate)
- Participate welding ndt control (UT,MT,VT) and reporting.
- Prepared documentation for necessary inspection reports in order to detect and avoid nonconformities.
- Providing the organization of inspection team.
Project Name: Fort McMurray West 500Kv Transmission Line Alberta, CANADA
-Analyze the of the project's ITP.
-Ensuring that all the acitivities at site are as per the procedures and standards.
-Made decisions about the results of inspections and tests, assuring that materials and products meet required standards.
-Prepared documentation for necessary inspection reports in order to detect and avoid nonconformities.
-Providing the organization of inspection team.
-Participate welding ndt control (UT,MT,VT) and reporting.
-Participating in laboratory test (Tensile, Charpy, Chemical, Bending)
-Slab and Billet Production processes were examined in Continuous Casting Department
-Casting Technical and rolling process were examined.
ISO 16949 Automotive Quality Management Certificate
ISO 9001 Quality Management Systems Certificate
ISO 19011 Auditing Management Systems Certificate
ISO 45001 Occupational Health and Safety (OH&S) Management System Certificate
ISO 14001 Environmental Management Systems Certificate
Crisis Management Certificate
Effective Presentation Certificate
Personal Stress Management Certificate
EN ISO 5817, Preparation welding plan, WPS and WPQR.
ISO 16949 Automotive Quality Management Certificate
ISO 9001 Quality Management Systems Certificate
ISO 19011 Auditing Management Systems Certificate
ISO 45001 Occupational Health and Safety (OH&S) Management System Certificate
ISO 14001 Environmental Management Systems Certificate
Crisis Management Certificate
Effective Presentation Certificate
Personal Stress Management Certificate
EN ISO 5817, Preparation welding plan, WPS and WPQR.