Summary
Overview
Work History
Education
Skills
Certification
Custom Section 1
Timeline
Generic

Oliver Livermont

Colorado Springs,CO

Summary

Results-driven Superintendent with expertise in pipe installation, equipment operation, and project management. Proven ability to manage teams and ensure safety compliance across multiple construction sites.

Overview

22
22
years of professional experience
3
3
Certifications

Work History

Superintendent/Foreman

NB Trenchless
Colorado Springs, Colorado
01.2016 - Current
  • Coordinated daily operations for trenching construction projects to ensure timely and efficient completion.
  • Managed multiple sites concurrently.
  • Led pipe crew of 6 to 10 employees, focusing on meeting project deadlines and maintaining quality standards.
  • Oversaw pipe installation and grade accuracy.
  • Focusing on sub-development utilities and storm drains.
  • Implemented on-site safety protocols to minimize risks and ensure compliance with safety regulations.
  • Oversaw equipment maintenance and repair schedules.
  • Compiled daily reports and acquired necessary permits for project compliance.
  • Participated in job bidding and take-offs.
  • Check delivery accuracy and work with suppliers.
  • Operate the excavator, loader, skid steer, some dozer, haul truck, water truck, and most equipment.

Owner/Operator

3308 INC
Colorado Springs, Colorado
09.2012 - 12.2015
  • Oversaw all operations of phone and fiber optic installation.
  • Operated construction equipment daily at work sites.
  • Participated in directional drilling, trenching, and excavation installation.
  • Developed and submitted competitive bids to secure contracts.
  • Oversaw hiring and firing processes to build effective team.
  • Acquired permits.
  • Coordinated with suppliers to ensure timely and accurate deliveries.
  • Participated in equipment acquisition.
  • Recorded expenses and maintained receipts.
  • Overawe 3 to 7 employees.

Pipe Forman

HCP Constructors
Pueblo West, Colorado
08.2010 - 08.2012
  • Led pipe crew of 18 to 25, ensuring efficient workflow and team coordination.
  • Managed all aspects of pipe installation, ensuring grade accuracy to meet project specifications.
  • Focused on large-diameter cross-country pipelines, 24-54 inch steel, and PVC. Water and sewer.
  • Operated an excavator for pipeline installation.
  • Oversaw backfill and cleanup operations.
  • Worked with inspectors and clients on a daily basis.
  • Negotiated pipeline installation agreements with landowners, facilitating smooth project execution.
  • Insured delivery accuracy.
  • Maintained strict safety protocols.

Pipe layer/Foreman/Operator/Laborer

High Country Pipeline
Penrose, CO
12.2004 - 08.2010
  • Installed various types of pipes according to specifications and project requirements.
  • Operated heavy machinery for trenching and pipe placement, ensuring precise execution of tasks.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Oversaw excavation of trenches for pipe laying, ensuring adherence to safety and quality standards.
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Tested newly constructed pipelines for leaks before commissioning them into service.
  • Conducted inspections of installed pipelines to ensure quality and safety standards.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Oversaw repairs of leaking joints in pipelines using welding equipment and specialized pipe fittings.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Followed blueprints and schematics to layout pipe systems accurately.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Performed backfilling operations after completing piping installations.
  • Backfilled excavated locations after completion of work to protect piping and prepare for final grading.
  • Maintained records related to work performed on pipelines and other associated systems.
  • Calculated volumes of materials used during jobs such as trench excavations and backfill operations.
  • Maintained tools and equipment to ensure proper functioning during operations.
  • Assisted in the setup and maintenance of job site safety measures consistently.
  • Verified that all safety protocols were followed while performing duties.
  • Collaborated with team members to achieve on-time completion of pipeline projects.
  • Collaborated with team members in order to ensure successful completion of tasks.
  • Communicated with project managers regarding material needs and workflow updates.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Cleaned debris from worksites following completion of tasks.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.
  • Graded and leveled trench bases using tamping machines and hand tools.
  • Trained new employees on equipment use and safety procedures.
  • Located underground utilities in preparation for digging and marked locations to prevent damage.
  • Measured distances between points to determine the length of pipe needed for a job.

Laborer

SJ Louis Construction
Waite Park, Minnesota
05.2004 - 12.2005
  • Supported skilled tradespeople in executing construction projects efficiently.
  • Operated hand tools and machinery for construction tasks.
  • Prepared job sites by clearing debris and setting up materials.
  • Executed various physical labor tasks to facilitate timely completion of construction projects.
  • Performed physical activities requiring heavy lifting, walking and standing for long periods of time.
  • Operated picks and shovels to effectively dig, spread, and level dirt and gravel for site preparation.
  • Performed repetitive assembly tasks with hand and power tools and automated equipment.

Education

High School Diploma -

Midland High School
South Dakota
05-2002

Skills

  • Pipe installation
  • Equipment operation
  • Project management
  • Materials coordination
  • Safety management
  • Blueprint and schematics

Certification

Osha certification 40 hr. compliance 

Custom Section 1

  • Other than the first job that was listed here, I have worked continually over the past 21 years with a single ownership group, ensuring consistent growth and application of my skills across multiple company evolutions. With each change of company names I gained new responsibilities while bringing my experience along.

Timeline

Superintendent/Foreman

NB Trenchless
01.2016 - Current

Owner/Operator

3308 INC
09.2012 - 12.2015

Pipe Forman

HCP Constructors
08.2010 - 08.2012

Pipe layer/Foreman/Operator/Laborer

High Country Pipeline
12.2004 - 08.2010

Laborer

SJ Louis Construction
05.2004 - 12.2005

High School Diploma -

Midland High School
Oliver Livermont