Detail-oriented employee who brings extensive construction background and specialized experience on challenging projects. Leads team members to meet goals, maximize performance, and maintain important safety standards. Knowledgeable about applicable codes and industry best practices. Who also offers 15+ years of experience leading communication and operations to complete various projects. Great coordinator between teams, vendors and design professionals. Efficient problem-solver to keep projects on time and on budget. Knowledgeable leader with record of accomplishment on diverse construction projects. Translates directives of inspectors, constructions managers and clients into actionable on-site directives to consistently meet project demands. Expert in tackling problems head-on and maintaining strict standards.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Foreman/Superintendent /Project Manager

Colorado Civil Infrastructure
Englewood, Colorado
03.2020 - 07.2024
  • Planned, managed and coordinated construction activities to ensure timely completion of projects.
  • Monitored work progress to ensure compliance with building codes, safety regulations and quality standards.
  • Supervised staff including subcontractors and laborers on assigned projects.
  • Provided technical advice for resolving design problems and construction issues.
  • Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
  • Reviewed project proposals, estimates, schedules and contracts related to the project.
  • Developed strategies for cost control, scheduling, quality assurance and problem solving.
  • Collaborated with engineers, architects and other professionals to discuss plans and resolve design issues.
  • Coordinated material procurement processes with suppliers while ensuring timely delivery of materials at job sites.
  • Negotiated changes or modifications in contracts as needed during the course of a project.
  • Maintained accurate records such as daily logs, time sheets, inspection reports, for each project.
  • Assisted in preparing bids for new projects by analyzing blueprints, specifications and other documentation related to the project.
  • Ensured that all equipment is properly maintained and serviced in accordance with manufacturer's guidelines.
  • Attended and participated in progress and project meetings.
  • Oversaw employee productivity to enforce efficient use of materials and equipment.
  • Met and worked with internal teams to recognize and discuss current and future needs.
  • Evaluated plans and inspected ongoing construction to keep work in line with project goals.

Notable Projects/Experience:

  • Central 70 (Sub-Contractor to Kiewit/CDOT). Various storm pipe installation and concrete structures done throughout the I-70 Project
  • 152nd And Imboden Rd. Drainage Improvements (Adams County). Ditch grading and storm pipe installation.
  • DHA Sun Valley Redevelopment (Sub-Contractor to Pinkard Construction and Denver Housing Authority). Removals of old utilities, concrete curb and gutter/sidewalks and asphalt roadways. Earthwork lot rough grade and all sidewalk/roadway prep. Water, sewer and storm line installations as well as concrete structures.
  • Ft. Carson RV Park (Sub Contractor to Rome Civil and TMG). Water and sewer line installation including lift station with force main.
  • Reata Colorado Golf Sub Division (Turn-Key sub-contractor to Sterling Custom Homes. Water, sewer, and storm line installations. All structural/flatwork concrete and asphalt.
  • E-470 Flyway (Sub-Contractor to Kiewit/CDOT). Detention pond grading and storm line installation with some structural concrete.
  • SH21 and Powers (Sub-Contractor to Kramer North America/CDOT) Primarily storm line and structural concrete installation.

Pipe Foreman

Flatiron Construction Corp.
Broomfield, CO
11.2018 - 03.2020
  • Inspected newly installed pipes to ensure they met safety standards and specifications.
  • Developed weekly production schedules for pipe crews, ensuring that deadlines were met.
  • Maintained records of work completed, materials used, and personnel assigned to each job.
  • Resolved conflicts between workers in a timely manner while maintaining a safe working environment.
  • Ordered necessary supplies to complete jobs efficiently and within budget constraints.
  • Analyzed blueprints or drawings to determine best methods for completing tasks safely.
  • Adhered to OSHA regulations when overseeing the erection of scaffolding around piping systems.
  • Provided guidance and assistance to subordinates during difficult tasks or challenging situations.
  • Tracked progress of each project, providing updates on completion times as needed.
  • Directed the use of heavy equipment such as cranes, backhoes, bulldozers., when handling large-scale pipe installations.
  • Identified areas where efficiency could be improved by making changes in existing procedures or introducing new ones.
  • Assisted in training new employees on proper safety protocols related to pipe installation activities.
  • Studied project specifications to plan sequence and schedule for pipe installations.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Allocated material and labor resources to promote on-time and under-budget project completion.

Notable Projects/Experience:

  • C-470 Express Lane (CDOT). Old storm sewer and roadway removals as well as some earthwork grading. New storm sewer and concrete structure installations.

Pipe Foreman

Diaz Construction
Denver, CO
01.2016 - 11.2018
  • Developed weekly production schedules for pipe crews, ensuring that deadlines were met.
  • Maintained records of work completed, materials used, and personnel assigned to each job.
  • Resolved conflicts between workers in a timely manner while maintaining a safe working environment.
  • Ordered necessary supplies to complete jobs efficiently and within budget constraints.
  • Analyzed blueprints or drawings to determine best methods for completing tasks safely.
  • Adhered to OSHA regulations when overseeing the erection of scaffolding around piping systems.

Notable Projects/Experience:

  • Edgewater emergency repairs. On call services for any water main/service or sewer repairs needed.
  • North Washington Water District Water Main Replacement. Removal of old ac water main for new water main installation with new service lines as well.
  • Limon, CO Sanitary Sewer Replacement. Removal of old clay sewer main for new PVC sewer main installation and sewer service replacements where needed.
  • Edgewater Police Department Building. Installations of all utilities and rough grading of lot.
  • Arapahoe County Sanitary Sewer Lift Station Rehab. Rehab of various sanitary sewer lift stations around Arapahoe County replacing valves and any other parts in need of repair.

Heavy Equipment Operator

Edge Contracting
Golden, CO
04.2015 - 01.2016
  • Operated multiple pieces of heavy equipment in a safe and efficient manner to excavate land for construction projects.
  • Transported materials from one site to another using off-road vehicles.
  • Assisted with the installation of underground utilities such as sewer lines and water mains.
  • Loaded and unloaded trucks with construction materials such as gravel, sand, and asphalt.
  • Performed routine inspections on all heavy machinery prior to use.
  • Utilized GPS systems to accurately plot out job sites for excavation purposes.
  • Followed safety protocols while operating machinery in order to avoid accidents or injuries.
  • Operated excavators and other construction equipment to properly grade land.
  • Operated front end loader to move dirt and different base materials.
  • Learned about new equipment and related attachments while maintaining knowledge of items used daily to meet job requirements.

Notable Projects/Experience:

  • Estes Park/Westminster/Highlands Ranch/Arvada Flood Plain Repair (FEMA). Earthwork grading and boulder placement to repair flood plains damaged by flood waters, also installed some storm drains/concrete structures in certain areas.

Heavy Equipment Operator

Ames Construction
Denver, CO
11.2012 - 04.2015
  • Operated multiple pieces of heavy equipment in a safe and efficient manner to excavate land for construction projects.
  • Transported materials from one site to another using off-road vehicles.
  • Maintained detailed records of hours worked, materials used, and completed jobs.
  • Assisted with the installation of underground utilities such as sewer lines and water mains.
  • Loaded and unloaded trucks with construction materials such as gravel, sand, and asphalt.
  • Utilized GPS systems to accurately plot out job sites for excavation purposes.
  • Operated excavators and other construction equipment to properly grade land.
  • Employed heavy equipment operation best practices resulting in minimal complaints or incidents.

Notable Projects/Experience:

  • Gold Line RTD Light Rail Project (RTD/CDOT). Earthwork fine grading/embankment and storm drain installation.

Material Handler/Electrical Apprentice

Encore Electric
Englewood, Colorado
10.2011 - 11.2012
  • Installed and maintained electrical wiring, equipment, and fixtures in accordance with local codes and regulations.
  • Read and interpreted blueprints, schematics, diagrams, and technical documents for installation of new systems.
  • Assisted in the planning of new installations by studying customer requirements and following approved specifications.
  • Used hand tools such as wire strippers, cutters to prepare wires for connections to boxes, terminals.
  • Worked with a variety of materials including PVC conduits, copper wiring, aluminum wiring and MC cables.
  • Cut openings in walls or floors to accommodate the passage of pipes or electrical conduit using power saws or cutting torches.
  • Pulled wires through conduit runs using fish tapes or pull strings when necessary.
  • Assembled junction boxes according to code requirements.
  • Worked in team-based environment to accomplish projects.
  • Assisted with electrical installation tasks, added new wiring and adjusted breaker boxes.
  • Listened to directives of senior electrical professionals to complete efficient tasks.
  • Measured and prepared supplies for electrical tasks.

Notable Projects/Experience:

  • UCH Expansion @ Colorado University Hospital. All new electrical install.
  • University Of Colorado Recreational Center Remodel

Pipelayer /Heavy Equipment Operator

Scott Contracting, Inc.
Golden, CO
08.2010 - 10.2011
  • Laid out and marked underground pipe routes to ensure accuracy of installation.
  • Assisted in the excavation of trenches for pipe laying.
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Performed backfilling operations after completing piping installations.
  • Operated rollers, front-end loaders and backhoes for site work.
  • Put in new fire hydrants, gate valves and fire lines to support city requirements.

Notable Projects/Experience:

  • Fredrick, CO Subdivision. Water/Sewer/Sanitary installations and rough grading of lots.

Pipelayer

American Infrastructure
Denver, CO
05.2008 - 08.2010
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
  • Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
  • Assembled prefabricated parts such as chambers, manholes, catch basins.
  • Repaired sanitary and storm water sewer structures and pipe systems.
  • Directed equipment operators and alerted to hazards by using effective hand signals.
  • Laid out and marked underground pipe routes to ensure accuracy of installation.

Notable Projects/Experience:

Aurora, Lakewood and Parker, CO Sub Divisions. Water/Sewer/Sanitary installations and rough grading of lots.

Laborer /Pipe Layer

Parker Excavating
Pueblo, CO
10.2005 - 05.2008
  • Completed variety of physical labor tasks.
  • Organized tools, supplies, and equipment needed for specific jobs according to instructions provided by supervisor.
  • Operated various power tools such as drills and saws safely while following manufacturer's instructions.
  • Mixed, poured, and spread concrete, asphalt gravel and other materials.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
  • Installed pipes using hand tools, power tools and heavy machinery.
  • Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.

Notable Projects/Experience:

  • Canon City, CO Waterline. New waterline Install with horizontal bores under HWY 50
  • Federal Center (Lakewood) emergency waterline repair
  • Peterson Air Force Base. New waterline install
  • Ft. Carson Waterline Replacement. Removal of old AC waterline and replaced with PVC pipe.

Education

High School Diploma -

Bear Creek High School
Lakewood, CO
05-2002

Skills

  • Business Planning
  • Strategic Planning
  • Infrastructure Planning
  • Training Oversight
  • Project Management
  • Quality Assurance
  • Employee Discipline
  • Continuous Improvement
  • Contractor Management
  • Key Decision Making
  • Blueprint and Schematic Understanding
  • Commercial Construction Experience
  • Labor Relations
  • Subcontractor Management
  • Construction Management
  • Blueprint Interpretation
  • Project Coordination
  • Heavy Equipment Operation
  • Safety Procedures
  • Water and Sewer Piping
  • Multitasking
  • Analytical Thinking
  • Problem-Solving Abilities
  • Project Planning
  • Obtaining Bids
  • Subcontractor Coordination
  • Vendor Relationships
  • Construction Knowledge
  • Schedule Coordination

Certification

  • OSHA 10
  • OSHA 30
  • Confined Space Certification
  • Competent Person

Languages

English
Professional
Spanish
Professional

References

  • John Johnson (720) 982-6192
  • Lane Walker (720) 607-0372
  • Luis Diaz (303) 883-3961
  • John Bonney (720) 203-4600
  • Brian Kennedy (720) 607-8104

Timeline

Foreman/Superintendent /Project Manager

Colorado Civil Infrastructure
03.2020 - 07.2024

Pipe Foreman

Flatiron Construction Corp.
11.2018 - 03.2020

Pipe Foreman

Diaz Construction
01.2016 - 11.2018

Heavy Equipment Operator

Edge Contracting
04.2015 - 01.2016

Heavy Equipment Operator

Ames Construction
11.2012 - 04.2015

Material Handler/Electrical Apprentice

Encore Electric
10.2011 - 11.2012

Pipelayer /Heavy Equipment Operator

Scott Contracting, Inc.
08.2010 - 10.2011

Pipelayer

American Infrastructure
05.2008 - 08.2010

Laborer /Pipe Layer

Parker Excavating
10.2005 - 05.2008

High School Diploma -

Bear Creek High School
  • OSHA 10
  • OSHA 30
  • Confined Space Certification
  • Competent Person
Omar Varela