Detail-oriented employee who brings extensive construction background and specialized experience on challenging projects. Leads team members to meet goals, maximize performance, and maintain important safety standards. Knowledgeable about applicable codes and industry best practices. Who also offers 15+ years of experience leading communication and operations to complete various projects. Great coordinator between teams, vendors and design professionals. Efficient problem-solver to keep projects on time and on budget. Knowledgeable leader with record of accomplishment on diverse construction projects. Translates directives of inspectors, constructions managers and clients into actionable on-site directives to consistently meet project demands. Expert in tackling problems head-on and maintaining strict standards.
Overview
19
19
years of professional experience
1
1
Certification
Work History
Foreman/Superintendent /Project Manager
Colorado Civil Infrastructure
Englewood, Colorado
03.2020 - 07.2024
Planned, managed and coordinated construction activities to ensure timely completion of projects.
Monitored work progress to ensure compliance with building codes, safety regulations and quality standards.
Supervised staff including subcontractors and laborers on assigned projects.
Provided technical advice for resolving design problems and construction issues.
Inspected construction sites regularly to detect potential safety hazards and ensure compliance with safety protocols.
Reviewed project proposals, estimates, schedules and contracts related to the project.
Developed strategies for cost control, scheduling, quality assurance and problem solving.
Collaborated with engineers, architects and other professionals to discuss plans and resolve design issues.
Coordinated material procurement processes with suppliers while ensuring timely delivery of materials at job sites.
Negotiated changes or modifications in contracts as needed during the course of a project.
Maintained accurate records such as daily logs, time sheets, inspection reports, for each project.
Assisted in preparing bids for new projects by analyzing blueprints, specifications and other documentation related to the project.
Ensured that all equipment is properly maintained and serviced in accordance with manufacturer's guidelines.
Attended and participated in progress and project meetings.
Oversaw employee productivity to enforce efficient use of materials and equipment.
Met and worked with internal teams to recognize and discuss current and future needs.
Evaluated plans and inspected ongoing construction to keep work in line with project goals.
Notable Projects/Experience:
Central 70 (Sub-Contractor to Kiewit/CDOT). Various storm pipe installation and concrete structures done throughout the I-70 Project
152nd And Imboden Rd. Drainage Improvements (Adams County). Ditch grading and storm pipe installation.
DHA Sun Valley Redevelopment (Sub-Contractor to Pinkard Construction and Denver Housing Authority). Removals of old utilities, concrete curb and gutter/sidewalks and asphalt roadways. Earthwork lot rough grade and all sidewalk/roadway prep. Water, sewer and storm line installations as well as concrete structures.
Ft. Carson RV Park (Sub Contractor to Rome Civil and TMG). Water and sewer line installation including lift station with force main.
Reata Colorado Golf Sub Division (Turn-Key sub-contractor to Sterling Custom Homes. Water, sewer, and storm line installations. All structural/flatwork concrete and asphalt.
E-470 Flyway (Sub-Contractor to Kiewit/CDOT). Detention pond grading and storm line installation with some structural concrete.
SH21 and Powers (Sub-Contractor to Kramer North America/CDOT) Primarily storm line and structural concrete installation.
Pipe Foreman
Flatiron Construction Corp.
Broomfield, CO
11.2018 - 03.2020
Inspected newly installed pipes to ensure they met safety standards and specifications.
Developed weekly production schedules for pipe crews, ensuring that deadlines were met.
Maintained records of work completed, materials used, and personnel assigned to each job.
Resolved conflicts between workers in a timely manner while maintaining a safe working environment.
Ordered necessary supplies to complete jobs efficiently and within budget constraints.
Analyzed blueprints or drawings to determine best methods for completing tasks safely.
Adhered to OSHA regulations when overseeing the erection of scaffolding around piping systems.
Provided guidance and assistance to subordinates during difficult tasks or challenging situations.
Tracked progress of each project, providing updates on completion times as needed.
Directed the use of heavy equipment such as cranes, backhoes, bulldozers., when handling large-scale pipe installations.
Identified areas where efficiency could be improved by making changes in existing procedures or introducing new ones.
Assisted in training new employees on proper safety protocols related to pipe installation activities.
Studied project specifications to plan sequence and schedule for pipe installations.
Established and enforced procedures and work standards, promoting team performance and safety.
Allocated material and labor resources to promote on-time and under-budget project completion.
Notable Projects/Experience:
C-470 Express Lane (CDOT). Old storm sewer and roadway removals as well as some earthwork grading. New storm sewer and concrete structure installations.
Pipe Foreman
Diaz Construction
Denver, CO
01.2016 - 11.2018
Developed weekly production schedules for pipe crews, ensuring that deadlines were met.
Maintained records of work completed, materials used, and personnel assigned to each job.
Resolved conflicts between workers in a timely manner while maintaining a safe working environment.
Ordered necessary supplies to complete jobs efficiently and within budget constraints.
Analyzed blueprints or drawings to determine best methods for completing tasks safely.
Adhered to OSHA regulations when overseeing the erection of scaffolding around piping systems.
Notable Projects/Experience:
Edgewater emergency repairs. On call services for any water main/service or sewer repairs needed.
North Washington Water District Water Main Replacement. Removal of old ac water main for new water main installation with new service lines as well.
Limon, CO Sanitary Sewer Replacement. Removal of old clay sewer main for new PVC sewer main installation and sewer service replacements where needed.
Edgewater Police Department Building. Installations of all utilities and rough grading of lot.
Arapahoe County Sanitary Sewer Lift Station Rehab. Rehab of various sanitary sewer lift stations around Arapahoe County replacing valves and any other parts in need of repair.
Heavy Equipment Operator
Edge Contracting
Golden, CO
04.2015 - 01.2016
Operated multiple pieces of heavy equipment in a safe and efficient manner to excavate land for construction projects.
Transported materials from one site to another using off-road vehicles.
Assisted with the installation of underground utilities such as sewer lines and water mains.
Loaded and unloaded trucks with construction materials such as gravel, sand, and asphalt.
Performed routine inspections on all heavy machinery prior to use.
Utilized GPS systems to accurately plot out job sites for excavation purposes.
Followed safety protocols while operating machinery in order to avoid accidents or injuries.
Operated excavators and other construction equipment to properly grade land.
Operated front end loader to move dirt and different base materials.
Learned about new equipment and related attachments while maintaining knowledge of items used daily to meet job requirements.
Notable Projects/Experience:
Estes Park/Westminster/Highlands Ranch/Arvada Flood Plain Repair (FEMA). Earthwork grading and boulder placement to repair flood plains damaged by flood waters, also installed some storm drains/concrete structures in certain areas.
Heavy Equipment Operator
Ames Construction
Denver, CO
11.2012 - 04.2015
Operated multiple pieces of heavy equipment in a safe and efficient manner to excavate land for construction projects.
Transported materials from one site to another using off-road vehicles.
Maintained detailed records of hours worked, materials used, and completed jobs.
Assisted with the installation of underground utilities such as sewer lines and water mains.
Loaded and unloaded trucks with construction materials such as gravel, sand, and asphalt.
Utilized GPS systems to accurately plot out job sites for excavation purposes.
Operated excavators and other construction equipment to properly grade land.
Employed heavy equipment operation best practices resulting in minimal complaints or incidents.
Notable Projects/Experience:
Gold Line RTD Light Rail Project (RTD/CDOT). Earthwork fine grading/embankment and storm drain installation.
Material Handler/Electrical Apprentice
Encore Electric
Englewood, Colorado
10.2011 - 11.2012
Installed and maintained electrical wiring, equipment, and fixtures in accordance with local codes and regulations.
Read and interpreted blueprints, schematics, diagrams, and technical documents for installation of new systems.
Assisted in the planning of new installations by studying customer requirements and following approved specifications.
Used hand tools such as wire strippers, cutters to prepare wires for connections to boxes, terminals.
Worked with a variety of materials including PVC conduits, copper wiring, aluminum wiring and MC cables.
Cut openings in walls or floors to accommodate the passage of pipes or electrical conduit using power saws or cutting torches.
Pulled wires through conduit runs using fish tapes or pull strings when necessary.
Assembled junction boxes according to code requirements.
Worked in team-based environment to accomplish projects.
Assisted with electrical installation tasks, added new wiring and adjusted breaker boxes.
Listened to directives of senior electrical professionals to complete efficient tasks.
Measured and prepared supplies for electrical tasks.
Notable Projects/Experience:
UCH Expansion @ Colorado University Hospital. All new electrical install.
University Of Colorado Recreational Center Remodel
Pipelayer /Heavy Equipment Operator
Scott Contracting, Inc.
Golden, CO
08.2010 - 10.2011
Laid out and marked underground pipe routes to ensure accuracy of installation.
Assisted in the excavation of trenches for pipe laying.
Installed pipes using hand tools, power tools and heavy machinery.
Performed backfilling operations after completing piping installations.
Operated rollers, front-end loaders and backhoes for site work.
Put in new fire hydrants, gate valves and fire lines to support city requirements.
Notable Projects/Experience:
Fredrick, CO Subdivision. Water/Sewer/Sanitary installations and rough grading of lots.
Pipelayer
American Infrastructure
Denver, CO
05.2008 - 08.2010
Installed pipes using hand tools, power tools and heavy machinery.
Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
Assembled prefabricated parts such as chambers, manholes, catch basins.
Repaired sanitary and storm water sewer structures and pipe systems.
Directed equipment operators and alerted to hazards by using effective hand signals.
Laid out and marked underground pipe routes to ensure accuracy of installation.
Notable Projects/Experience:
Aurora, Lakewood and Parker, CO Sub Divisions. Water/Sewer/Sanitary installations and rough grading of lots.
Laborer /Pipe Layer
Parker Excavating
Pueblo, CO
10.2005 - 05.2008
Completed variety of physical labor tasks.
Organized tools, supplies, and equipment needed for specific jobs according to instructions provided by supervisor.
Operated various power tools such as drills and saws safely while following manufacturer's instructions.
Mixed, poured, and spread concrete, asphalt gravel and other materials.
Gained independent working skills and guided and mentored less experienced team members.
Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
Installed pipes using hand tools, power tools and heavy machinery.
Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
Notable Projects/Experience:
Canon City, CO Waterline. New waterline Install with horizontal bores under HWY 50
Federal Center (Lakewood) emergency waterline repair
Peterson Air Force Base. New waterline install
Ft. Carson Waterline Replacement. Removal of old AC waterline and replaced with PVC pipe.
Education
High School Diploma -
Bear Creek High School
Lakewood, CO
05-2002
Skills
Business Planning
Strategic Planning
Infrastructure Planning
Training Oversight
Project Management
Quality Assurance
Employee Discipline
Continuous Improvement
Contractor Management
Key Decision Making
Blueprint and Schematic Understanding
Commercial Construction Experience
Labor Relations
Subcontractor Management
Construction Management
Blueprint Interpretation
Project Coordination
Heavy Equipment Operation
Safety Procedures
Water and Sewer Piping
Multitasking
Analytical Thinking
Problem-Solving Abilities
Project Planning
Obtaining Bids
Subcontractor Coordination
Vendor Relationships
Construction Knowledge
Schedule Coordination
Certification
OSHA 10
OSHA 30
Confined Space Certification
Competent Person
Languages
English
Professional
Spanish
Professional
References
John Johnson (720) 982-6192
Lane Walker (720) 607-0372
Luis Diaz (303) 883-3961
John Bonney (720) 203-4600
Brian Kennedy (720) 607-8104
Timeline
Foreman/Superintendent /Project Manager
Colorado Civil Infrastructure
03.2020 - 07.2024
Pipe Foreman
Flatiron Construction Corp.
11.2018 - 03.2020
Pipe Foreman
Diaz Construction
01.2016 - 11.2018
Heavy Equipment Operator
Edge Contracting
04.2015 - 01.2016
Heavy Equipment Operator
Ames Construction
11.2012 - 04.2015
Material Handler/Electrical Apprentice
Encore Electric
10.2011 - 11.2012
Pipelayer /Heavy Equipment Operator
Scott Contracting, Inc.
08.2010 - 10.2011
Pipelayer
American Infrastructure
05.2008 - 08.2010
Laborer /Pipe Layer
Parker Excavating
10.2005 - 05.2008
High School Diploma -
Bear Creek High School
OSHA 10
OSHA 30
Confined Space Certification
Competent Person
Similar Profiles
George BruningGeorge Bruning
Civil Foreman at Colorado Civil InfrastructureCivil Foreman at Colorado Civil Infrastructure