Dependable, dedicated team player and top performer who consistently meets project deadlines and budget goals. Understands the importance of quality work and preventative maintenance. Organized Pipefitter who effectively manages simultaneous projects. Precisely follows directions and works efficiently to produce quality results. Successful at managing multiple projects daily and seeing a diverse range of technical tasks through to completion.
Overview
37
37
years of professional experience
Work History
Pipefitter
Allfirst LLC
09.2019 - Current
Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Demonstrated versatility in skillset by working with various types of pipes such as PVC, copper, steel, cast iron among others.
Contributed to successful project outcomes by working closely with plumbers, steamfitters, and welders on diverse job sites.
Installed new systems and connected piping to existing components by welding, bolting and threading.
Improved workflow with efficient pipe system modifications, including cutting, threading, welding, and soldering components as needed.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Supported fellow team members in their tasks, fostering a collaborative work environment that prioritized both safety and efficiency.
Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
Interpreted blueprints to determine locations, quantities, and sizes of materials required.
Self-motivated, with a strong sense of personal responsibility.
Bolstered quality control measures with thorough documentation of completed tasks and regular updates to project managers.
JOURNEYMAN PIPE FITTER
Fluor Corporation
05.2018 - 06.2019
Read and interpreted blueprints and schematics to determine locations, quantities and sizes of materials required
Accurately read, understood, and carried out written instructions
Maintained documentation for areas such as orders, activities, schedules and employee performance
Safe and efficient operation of all required equipment
Followed safe work practices, which included fall protection and personal protective equipment
Fabricated, assembled, installed and maintained piping systems
Identified issues and brought to job foreman to be resolved
PIPE FITTER
FLUOR CORPORATION
12.2016 - 03.2018
Installed valves, hangers, supports, and flanges.
Eliminated risks by correctly identifying potential safety hazards
Independently worked on projects, while offering process coordination and cooperation with other teams
Worked with certified pipe welders by providing accurate pipe preparation and fitting
Read blueprints to determine appropriate materials and procedures for each project
CARPENTER
FLUOR CORPORATION
04.2016 - 12.2016
Followed established job site safety regulations and maintained a safe and clean work area
Operated electric cordless drill and circular saw, jigsaw
Read blueprints and construction documents to determine project directives
AUTOMOTIVE MECHANIC
ALLIANCE AUTO CARE
12.2013 - 05.2015
Diagnosed computer and electrical failure with appropriate testing equipment
Managed and maintained the necessary level of supplies in the shop
Communicated effectively with customers on future problems and repairs that might need to be addressed
AUTOMOTIVE MECHANIC
TOMS AUTO REPAIR SERVICE
08.2005 - 07.2013
Communicated effectively with customers on future problems and repairs that might need to be addressed.
Managed and maintained the necessary level of supplies in the shop.
Maintained vehicle records by recording and filing all service and repairs.
AUTOMOTIVE MECHANIC
BRUNO'S GARAGE INC
08.2000 - 02.2005
Managed the front counter, including answering the phone and opening and closing the shop.
Reviewed work orders and discussed them with supervisors.
Inflated tires on a test machine and adjusted controls to simulate road conditions.
AUTOMOTIVE MECHANIC
KINGS PARK CAR CARE
08.1996 - 08.2000
Disassembled engines and repaired or replaced defective parts.
Replaced drive and hydraulic systems.
Trained staff on proper coolant flush processes and all aspects of air conditioning testing.
AUTO MECHANIC
J&M AUTO REPAIR
06.1993 - 07.1996
Tested vehicles and their components and systems.
Repaired, replaced and adjusted brakes and brake pads.
Operated equipment such as infrared engine analyzers, compression gauges and computerized diagnostic device.
CARPENTER
FIRAT CARPENTRY
05.1988 - 06.1993
Constructed residential decks, carport's, garages, and sunrooms.
Repaired and remodeled wood, iron, chain link and vinyl fencing.
Followed established job site safety regulations and maintained a safe and clean work area.
Proactively managed projects to obtain complete customer satisfaction for all custom work.