Professional focused on Mechanical systems with experience in installation, maintenance, and repair. Strong technical skills in diagnostics, troubleshooting, and system optimization. Team player who adapts to changing environments and prioritizes achieving results. Proven to be able to lead others, and can acclimate to any conditions effectively to meet project deadlines while still maintaining a safe work environment. Reliable and driven to ensure efficient and high-quality outcomes in all tasks.
- Install Ductwork and Refrigerant lines, then perform pressure tests to ensure they meet our quality standards
- Coordinate with other trades after reviewing MEPs, RCPs, and the site plan to ensure synchronicity with no conflicting installation on site
- Mentor Apprentices and fellow journeymen alike
- Mark the layout after reviewing the drawings thoroughly
Performed TIG welding on the condenser for the nuclear reactor at Diablo Canyon Power Plant
- Certified for Nuclear energy worker, Radiation worker, Welder, Confined spaces, Hazmat, Work Package Order, and Lock Out/ Tagout, all through PG&E
- Replaced stainless steel drip pans inside of the reactor in full protective gear while wearing a Dosimeter
- Conducted Duct Air Leakage Testing throughout entire jobsite
- Interpreted RCPs and MEPs in order to layout where Mechanical components were to be installed
- Installed Ductwork, Refrigerant lines and related components
- Conducted Duct Air Leakage testing on all ductwork and generated reports on the results
- Connected AHUs and Heat Pumps to water, power, and fuel
- Coordinated with other trades and interpreted drawings to complete tasks promptly and safely
- Replaced multiple TXVs on refrigerant lines and subsequently tested each one to ensure adequate operation
-Balanced the entire HVAC system at Ventura County Medical Center, ensuring that every room had optimal air pressure including critical spaces such as Operating Rooms and the Neo-Natal Ward
-Generated daily reports documenting CFM at every register in the building
-Inspected, tested, and resolved malfunctions in AHUs, VFDs, pumps, motors, compressors, and valves
-Install/Demo HVAC Ductwork and related components (VAVs, Exhaust Fans, etc.)
- Performed startup of air handler units and executed troubleshooting, repair, and maintenance
-Install/demo HVAC ductwork
-Fabricated, welded, and installed duct supports for exterior ductwork
-Installed and did the startup on various AHUs and their related components
-Installed and ran Mini-Split units, and installed everything from the lineset to the communication wire and thermostats
-Performed pressure tests, diagnostics, and repairs on high pressure refrigerant lines
-Installed Sheet Metal siding and gutters at the Port Hueneme Water Treatment Facility
-Worked from articulating boom lifts
-Moved materials with forklift
-Installed Rain gutters and downspouts at a Super 8 motel
-Sealed and modified existing flashing
-Installed Sheet Metal siding and gutters at the Port Hueneme Water Treatment Facility
-Worked from articulating boom lifts
-Moved materials with forklift
-Installed and fabricated general flashing on windows, doorways, and walkways
-Installed Coping on every track
-Installed Roof panels
-Installed Gutters, liter heads, and downspouts
-Loaded materials onto roof with all terrain forklift
-Installed standing seam roof panels and related components
-Fabricated and installed roof rakes, crickets, and ridge caps
-Installed valley flashing and foam closures
-Modified and installed coping
-Ran site logistics for our material to streamline on-site operations
-Installed aluminum cladding on stairways at UCSB
-Modified and Installed ornamental trim pieces at every stair landing
- Fixed multiple company work trucks
-Performed Testing and Air Balancing using various instruments including airflow hoods, anemometers, and pitot tubes to accurately balance the airflow in the entire HVAC system
-Plugged into thermostats via computer with proprietary software to adjust to appropriate CFM to balance the system and recorded all data via Microsoft Excel
-Rigged and flew multiple AHUs onto roofs and then installed them and performed the initial startup
-Installed ductwork, refrigerant lines, exhaust fans, and economizers
-Installed Mini split units along with line sets and communication wires and performed their start ups
- Coordinated with other trades to facilitate site operation
-Installed aluminum panels and related components for a wind screen on a high rise for an office building
-Worked from Articulating Boom Lifts frequently
-Moved materials around the site via all terrain forklift
-Performed multiple crane picks to roof (signal person)
-Mentored several apprentices
-Ran a crew to install the perimeter guardrails on the roof of Gateway of Pacific office complex
-Became well acquainted with every type of drawing available including MEPs and RCPs to better coordinate with every trade
-Installed handrails, stairs, and miscellaneous steel components for Google, YouTube, and various laboratories
-Erected, Welded, and field fabricated steel
-Ran multiple crane picks
-Operated Boom Lifts, Scissor lifts, and Forklifts while having the necessary training
-Regularly attended Foreman meetings, and submitted RFIs
-Filled out JHAs daily
-Mentored Apprentices
-Installed Epoxy anchors on CMU walls frequently
after scanning for rebar
-Layout
-Installed composite panel siding and related components at SJSU’s Aquatic Center.
-Installed and Fabricated Flashing
-Operated Boom Lifts, Scissorlifts, and Forklifts
-Installed Sheet Metal panels and related components at Mountain View Hospital
-Installed decking and erected stairs at Camp Parks Military Base
-Fabricated and installed miscellaneous steel at Facebook Headquarters
- Installed Stainless Steel Netting on the Golden Gate Bridge
- Coordinated with the crane operator and other trades to ensure safety and efficiency were met during crane picks
-Shook out, rigged, erected, and bolted up structural steel beams and columns
-Plumbed the building via turnbuckles
-Signaled the crane for large picks
-Fabricated and installed benches, tables, and guardrails for Google
-Installed epoxy anchors
-Fabricated, Installed, and modified stairs, handrails, guardrails, floor plates, gusset plates and other miscellaneous steel at Apple Campus 2
-Operated all terrain forklifts, warehouse forklifts, scissor lifts, and boom lifts in every kind of weather
-Was put in charge of a crew responsible for welding in metal floor plates next to $250,000 pieces of glass; therefore, setting up fire protection and taking before and after pictures became second nature
-Completed daily job hazard analyses and production reports, accurately tracking man hours and project status
-Learned how to communicate and build trust with the crew regardless of age, race, or gender