Summary
Overview
Work History
Education
Skills
Languages
Certification
References
Timeline
Generic

Julian Gallardo

Corsicana,TX

Summary

Seasoned Construction Field Supervisor with a solid foundation in overseeing project execution, quality control, and workforce coordination. Strengths lie in leadership, problem-solving and operational efficiency. Previously delivered successful construction projects on time and within budget by managing resources effectively and fostering team collaboration. Exceptional skills in blueprint reading and understanding of building codes ensure compliance with regulations at all times.

Flexible hard worker ready to learn and contribute to team success.

Detailed Foreman skilled in planning, assigning and directing work tasks. Team-oriented professional with strong commitment to maintaining safe, clean job sites. Dedicated to quality and clear communication.

Overview

33
33
years of professional experience
1996
1996
years of post-secondary education
1
1
Certification

Work History

API Storage Tank Construction Field Supervisor

Turner Industries
Sulphur, Louisiana
11.2024 - Current
  • Supervised daily construction site operations and maintained safety protocols.
  • Coordinated with subcontractors to ensure timely project progress and adherence to plans.
  • Assisted in training new employees on site safety practices and equipment usage.
  • Monitored work quality and compliance with building codes and regulations.
  • Communicated project updates to team members and management effectively.
  • Responsible for coordinating deliveries of materials from suppliers to worksite location.
  • Monitored quality control procedures to ensure compliance with standards.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Kept production team moving forward for progress in daily site operations.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.

API Storage Tank Construction Field Supervisor

Pat Tank Inc
Port Arthur, Texas
03.2013 - 08.2026
  • Supervised daily construction site operations and maintained safety protocols.
  • Coordinated with subcontractors to ensure timely project progress and adherence to plans.
  • Assisted in training new employees on site safety practices and equipment usage.
  • Communicated project updates to team members and management effectively.
  • Monitored work quality and compliance with building codes and regulations.
  • Conducted regular inspections of tools and equipment for maintenance needs.
  • Organized materials delivery schedules to support efficient workflow on-site.
  • Responsible for coordinating deliveries of materials from suppliers to worksite location.
  • Monitored quality control procedures to ensure compliance with standards.
  • Ensured that all building codes were adhered to throughout the project's duration.
  • Ordered supplies as needed for completion of projects.
  • Prepared reports detailing progress made on a weekly basis for management review.
  • Maintained records of timecards, equipment usage logs, material inventories.
  • Performed daily site assessments to identify potential hazards or risks.
  • Resolved conflicts between workers or subcontractors when necessary.
  • Managed sites by focusing on safety, operations and productivity.
  • Checked project details to verify job site materials and equipment.
  • Communicated with employees to demonstrate high standards and mitigate issues.

API Storage Tank Construction Field Supervisor

Bbb Tank Services
Baytown, Texas
08.2013 - 08.2016
  • Supervised daily construction activities on site for safety compliance.
  • Coordinated with subcontractors to ensure timely project completion.
  • Conducted safety inspections and ensured that all safety protocols were followed.
  • Supervised demolition activities onsite while ensuring proper disposal of debris.
  • Inspected materials used during construction to ensure they met job specifications.
  • Ordered supplies as needed for completion of projects.
  • Maintained records of timecards, equipment usage logs, material inventories.
  • Monitored quality control procedures to ensure compliance with standards.
  • Directed and coordinated the activities of workers in a construction project.
  • Prepared and planned worksites to help jobs run smoothly.
  • Reported project progress, site problems and labor status to supervisors.
  • Kept production team moving forward for progress in daily site operations.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.

Ironworker

General Dynamics
Richardson, Texas
08.2004 - 02.2009
  • Fabricated and assembled structural steel components on construction sites.
  • Installed beams and columns using cranes and rigging equipment.
  • Interpreted blueprints to determine project specifications and requirements.
  • Ensured compliance with safety regulations during all phases of work.
  • Operated hand tools and power tools for metal cutting and shaping tasks.
  • Conducted inspections of welds and connections for quality assurance.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Loaded and unloaded trucks with tools and supplies needed for job sites.
  • Cut material with shears, hand torches, plasma cutters, or power saws.
  • Maintained a clean workspace throughout the duration of the project.
  • Lifted and positioned heavy steel beams into place.
  • Welded components together using gas welding or arc welding processes.
  • Climbed ladders and scaffolds to access work areas at height.
  • Fabricated metal components with cutting torches, arc welders, and other tools.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Aligned structural steel members using levels or lasers.
  • Performed preventive maintenance checks on all tools used during construction projects.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Removed and replaced existing grating and structural steel with appropriate materials.

Welder

Kiewitt Offshore Services
Ingleside, Texas
01.2003 - 08.2004
  • Operated welding equipment to join metal components for offshore projects.
  • Conducted inspections on welds to maintain quality control measures.
  • Assisted in training new welders on techniques and safety protocols.
  • Maintained a clean working environment by removing scrap metal from work areas.
  • Set up welding machines based on the job at hand.
  • Used welding skills to help repair and maintain heavy-duty machinery.
  • Fabricated and welded components to assemble structural forms, such as machinery frames, tanks, pressure vessels, and furnace shells.
  • Scraped off excess spatter using portable grinders and arc-cutting equipment.
  • Operated manual and semi-automatic welding equipment in vertical, horizontal and overhead positions.
  • Applied shielded metal arc welding techniques with electrodes in flat, horizontal vertical positions as well as overhead applications.
  • Troubleshot problems related to welds including porosity issues caused by improper shielding gas flow rates.
  • Utilized oxyacetylene torches for preheating metals prior to welding or bending them into desired shapes.
  • Adjusted settings on machines such as current level so it matches the specifications outlined in blueprints and drawings.
  • Monitored the fitting, burning, and welding processes to avoid overheating of parts or warping, shrinking, distortion, or expansion of material.
  • Prepared workpiece edges by grinding, cutting, buffing or bending to verify snug fit.
  • Marked or tagged material with job number, piece marks and other identifying marks.

Carpenter

Gallardo Construction
Lilburn, Georgia
06.1997 - 01.2003
  • Constructed frameworks for residential and commercial projects using various materials.
  • Installed doors, windows, and cabinetry with precision according to specifications.
  • Operated power tools safely to complete carpentry tasks efficiently.
  • Measured, cut and shaped wood materials to specifications using hand tools, such as saws and chisels.
  • Installed drywall sheets onto walls or ceilings using nails or screws.
  • Maintained a clean job site at all times by disposing of debris properly after each shift.
  • Promoted team safety by keeping work areas free of hazards.
  • Fashioned frameworks or props using hand tools and wood screws, nails or glue.
  • Erected scaffolding to assemble above-ground structures.
  • Measured and marked cut lines on materials using ruler or marking gauge.
  • Worked independently on projects and tasks within carpentry team.

Farm Hand

Richie Farms
Taft, Texas
06.1993 - 06.1997
  • Loaded and unloaded trucks with supplies or products from the farm.
  • Performed general maintenance tasks around the farm, including repairing fences and buildings.
  • Maintained farm equipment such as tractors, harvesters, and other machinery.
  • Cleaned out barns, stalls, pens, and other animal enclosures on a regular basis.
  • Harvested crops according to season and maintained records of yields.
  • Organized storage areas for harvested crops.
  • Planted seeds according to prescribed methods of production.
  • Fed and watered livestock, ensuring their health and well-being.
  • Operated and maintained farm machinery and equipment, following safety protocols.
  • Moved equipment, poultry or livestock manually or using trucks or carts.
  • Used all-terrain vehicles to patrol expansive land holding, pastures and grazing areas to monitor animal activities.

Education

Sinton High School
Sinton, TX

Skills

  • Site supervision
  • Safety compliance
  • Project coordination
  • Quality control
  • Equipment maintenance
  • Employee training
  • Problem solving
  • OSHA compliance
  • Permit acquisition
  • Site safety management
  • Building codes
  • Attention to detail
  • Team mentoring
  • Fall protection
  • Materials estimating
  • Construction vehicles operation
  • Construction supervision
  • Site inspection
  • Job planning
  • Heavy lifting
  • Timesheet review

Languages

English
Native/ Bilingual
Spanish
Professional

Certification

  • NCCCO certification,

References

References available upon request.

Timeline

API Storage Tank Construction Field Supervisor

Turner Industries
11.2024 - Current

API Storage Tank Construction Field Supervisor

Bbb Tank Services
08.2013 - 08.2016

API Storage Tank Construction Field Supervisor

Pat Tank Inc
03.2013 - 08.2026

Ironworker

General Dynamics
08.2004 - 02.2009

Welder

Kiewitt Offshore Services
01.2003 - 08.2004

Carpenter

Gallardo Construction
06.1997 - 01.2003

Farm Hand

Richie Farms
06.1993 - 06.1997

Sinton High School
Julian Gallardo