Summary
Overview
Work History
Education
Timeline
Generic

Pablo Pena

Summary

Hardworking and reliable professional with outstanding background in applying a strong work ethic to perform daily construction duties. Intelligent in planning tasks by performing simple and complex calculations. Safety-minded in following procedures, maintaining organized workspaces and using tools properly.

Overview

13
13
years of professional experience

Work History

Finish Carpenter

Millwork Solutions
Livermore, CA
10.2016 - Current
  • Communicate with teammates and supervisors frequently to understand requirements and complete projects on time.
  • OSHA 10 certified
  • Power tool knowledge
  • Install laminate and corian countertops
  • Read blueprints or building plans to prepare layout and materials required.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Promote compliance with applicable federal, state and OSHA laws and regulations.
  • Install finished products such as cabinetry fixtures shelves and molding in homes offices stores restaurants.
  • Produce high-quality work in full compliance with project standards and good carpentry practices.
  • Install windows, flooring, or trim using hand or power tools.
  • Assemble cut and shape materials and fasten them together with nails, screws, staples, dowels or glue.
  • Fill nail holes cracks dents gouges with putty filler sandpaper, then finish to match existing surface.
  • Work independently on projects and tasks within carpentry team.
  • Adhere to project blueprints and requirements to deliver quality work.
  • Utilize various tools, equipment, materials and forming systems to complete construction tasks.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Kept worksites organized and tidy to reduce hazards.

Carpenter

Dino's Flooring
01.2011 - 10.2016
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Installed baseboards
  • Laminate flooring
  • Demolition of current flooring to prepare for new installation
  • Operated various power tools such as drills and saws safely while following manufacturer's instructions.
  • Cleaned work area after job completion ensuring all debris is properly disposed of.
  • Completed variety of physical labor tasks.
  • Lifted objects weighing up to 50 pounds without assistance when necessary.

Education

Associate of Applied Science -

Heald College
Stockton, CA
07-2016

Timeline

Finish Carpenter

Millwork Solutions
10.2016 - Current

Carpenter

Dino's Flooring
01.2011 - 10.2016

Associate of Applied Science -

Heald College
Pablo Pena