Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Timeline
Generic

Paden McCall

Kosse,TX

Summary

Experienced Supervisor leading team members on-time job completion. Assign tasks, train employees, provide feedback, mediate interpersonal conflicts and implement company procedures.

Excellent communication and listening skills. Provide leadership and vision which drives teams to meet goals. Hard-working Supervisor with exceptional experience leading teams, delivering results and exceeding expectations. Creative and motivated leader adept at utilizing exceptional design and planning strengths to accomplish complex projects. Skilled in teaching new concepts and best practice strategies.

Motivated employee learns quickly in fast-paced, high-volume environments. Consistently adheres to safety standards. Maintains open availability and flexibility to work various shifts.

Reliable Machine Operator with work history of good performance in fast-paced production environments. Knowledgeable in quality control measures and manufacturing quality standards. Demonstrated expertise in equipment operation and maintenance.

Overview

14
14
years of professional experience

Work History

Concrete Supervisor

Big Creek Construction
08.2013 - Current
  • Ensured timely project completion through effective delegation of tasks and close monitoring of progress.
  • Maintained safety standards on the job site, resulting in a decrease in accidents and injuries.
  • Excavated and graded areas for placement of curb, sidewalk, paving, bridges, slabs, and headwalls.
  • Set forms, tied rebar, and poured curb, sidewalk, paving, bridges, slabs, and headwalls.
  • Excavated for and placed rcp and culvert boxes.


Owner/Operator Supervisor

China Spring Concrete
11.2011 - 08.2013
  • Managed daily operations for optimal efficiency, streamlining processes to reduce costs.
  • Cultivated a positive work environment, leading to higher employee retention rates and overall job satisfaction.
  • Ensured timely project completion through effective delegation of tasks and close monitoring of progress.
  • Maintained safety standards on the job site, resulting in a decrease in accidents and injuries.
  • Excavated and graded areas for placement of curb, sidewalk, and paving.
  • Set forms, tied rebar, and poured curb, sidewalk, and paving.
  • Operated various types of machinery, contributing to the successful completion of diverse projects.
  • Performed preventative maintenance tasks consistently which resulted in fewer breakdowns requiring costly repairs.

Concrete Foreman

Waco Paving
08.2009 - 11.2011


  • Ensured timely project completion through effective delegation of tasks and close monitoring of progress.
  • Maintained safety standards on the job site, resulting in a decrease in accidents and injuries.
  • Excavated and graded areas for placement of curb, sidewalk, and paving.
  • Set forms, tied rebar, and poured curb, sidewalk, and paving.

Education

High School Diploma -

China Spring High School
China Spring, TX

No Degree - Basics

McLennan Community College
Waco, TX

Skills

  • Staff Management
  • Data Analytics
  • Operations Management
  • Equipment Operation
  • Machinery Operation
  • Problem-Solving

Accomplishments

  • Collaborated with team of 9 in the development of multiple Tdot projects.
  • Built Concrete mixer plants from ground up.

Languages

English
Native or Bilingual
Spanish
Limited Working

Timeline

Concrete Supervisor

Big Creek Construction
08.2013 - Current

Owner/Operator Supervisor

China Spring Concrete
11.2011 - 08.2013

Concrete Foreman

Waco Paving
08.2009 - 11.2011

High School Diploma -

China Spring High School

No Degree - Basics

McLennan Community College
Paden McCall