Summary
Overview
Work History
Education
Skills
Timeline
Generic

Patrick Felt

Cypress,TX

Summary




To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Dedicated professional with history of meeting company goals utilizing consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Overview

19
19
years of professional experience

Work History

Land Survey Technician

Baseline Corporation
06.2022 - 11.2023
  • Set up precise measurement and control equipment.
  • Performed field calculations to complete assessments.
  • Reduced errors in data collection through meticulous attention to detail and thorough fieldwork.
  • Performed detailed topographic surveys for engineering projects, ensuring accurate elevation data for design purposes.
  • Demonstrated commitment to safety protocols while conducting field operations in various environmental conditions.
  • Performed boundary, topographic and traverse land surveys.

Owner

Concrete By Felt LLC
01.2018 - 12.2021
  • Managed day-to-day business operations.
  • Consulted with customers to assess needs and propose optimal solutions.
  • Trained and motivated employees to perform daily business functions.
  • Enhanced operational efficiency and productivity by managing budgets, accounts and costs.
  • Monitored market conditions to set accurate product pricing and take advantage of emerging trends.
  • Assessed supplier quality to maintain tight cost controls and maximize business operational performance.
  • Established, optimized and enforced business policies to maintain consistency and high-quality standards across industry operations.
  • Generated revenues yearly and effectively capitalized on industry growth.
  • Conducted target market research to scope out industry competition and identify advantageous trends.
  • Established and administered annual budget with controls to prevent overages, minimize burn rate and support sustainability objectives.

Project Manager

Self
01.2018 - 12.2021
  • Spec Home Investments.
  • Kept site work safe and in line with budget, schedule and applicable building codes.
  • Hired and oversaw subcontractors to meet project needs.
  • Managed talented teams of electricians, carpenters, plumbers and other craftsmen on residential projects.
  • Maximized cost savings by assessing subcontractor bids before completing contract agreements.
  • Reviewed contractor invoices, approving payments on acceptable work.
  • Obtained building and specialty permits from local jurisdictional agencies.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor laborers.
  • Scheduled utility service providers according to project timelines.

Concrete Finisher Foreman

High Performance Concrete
01.2012 - 12.2017
  • Shoveled materials such as dirt, gravel and asphalt.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Set wood and other forming materials to prepare for concrete pours.
  • Wore correct clothing and protective equipment for jobs.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Created specific finishes on poured concrete.
  • Adhered to safety and reporting procedures.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Completed physically demanding tasks such as lifting up to 100 pounds to move job materials.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality and code standards.
  • Operated power trowel to finish.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Engaged with customers and subcontractors and provided timelines for project completion.
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.

Communication Tower Technician

Rilo Electric
03.2010 - 06.2011
  • Determined required installation methods and assembled proper tools and equipment to complete projects to specifications.
  • Rigged towers, monopoles and rooftops to build new tower or collocate antenna on existing structure under FCC guidelines.
  • Performed tower construction at heights of 200 feet while maintaining focus on safety.
  • Bolted equipment into place using hand and power tools.
  • Kept working areas clean, safe and stocked with appropriate equipment and supplies to meet expected shop and customer demands.
  • Leveraged sweep testing tools and PIM software to test operation of tower transmission components.
  • Calibrated and aligned components using scales, gauges and other measuring instruments.
  • Drove truck and trailer to and from job sites, up to 4 hour drives.
  • Optimized operations by performing system upgrades, troubleshooting component failures and installing approved system modifications.

Shop Lead Fabricator

LPR Construction Co.
01.2007 - 02.2009
  • Followed Operational Safety and Health Administration (OSHA) regulations to promote safe equipment operation and workplace safety.
  • Utilized welding equipment and tools to safely complete predetermined operations .
  • Supervised 4 apprentices and offered specific recommendations to improve work quality.
  • Performed required maintenance on equipment to enable readiness for project use.
  • Recognized and reported defective material and equipment to shift supervisor.
  • Operation of small and industrial style forklifts.
  • Skilled in safe use of all hand and power tools.

Tool Crib Manager

LPR Construction Co.
01.2005 - 01.2007
  • Maintained instruments and tools to help team complete maintenance tasks quickly and with accurate outcomes.
  • Monitored incoming and outgoing tools to track locations.
  • Verified computer inventory against physical inventory and resolved discrepancies.
  • Unpacked, inspected and stored new tools according to crib plans.
  • Tracked excess materials and coordinated returns of damaged or unused items to vendors.
  • Received incoming shipments of tools and equipment from trucks.
  • Charged raw materials to specific jobs and documented lost or broken tools.
  • Facilitated preventive maintenance on equipment in line with company standards.
  • Handled day-to-day shipping and receiving.
  • Organized records of vehicles, schedules and completed orders.
  • Expedited resolutions of shipping errors and packaging mistakes.
  • Conducted inventory audits accuracy following company procedures.

Education

High School Diploma -

Harold Ferguson High School
Loveland, CO
05.2004

Skills

  • Integrity and Dependability
  • Industry Expertise
  • Leadership
  • Teamwork Skills
  • Strategic Planning
  • Complex Problem-Solving
  • Project Oversight
  • New Construction
  • Vendor Relationships
  • Timely Project Completion
  • Materials Take-Offs
  • Bid Reviewing
  • Purchasing and Procurement
  • Managing Multiple Projects
  • Subcontractor Relations
  • Critical Thinking
  • Inventory Monitoring and Management
  • Building and Construction
  • Project Drawings
  • Maintaining Clean Work Areas
  • Laborer Supervision
  • Site Installations
  • Basic Mathematical Abilities
  • Concrete Installation and Finishing
  • Decorative Stamping
  • Hand and Power Tool Operation
  • Safe Equipment Operation
  • Welding and Fabrication
  • Fall Protection

Timeline

Land Survey Technician

Baseline Corporation
06.2022 - 11.2023

Owner

Concrete By Felt LLC
01.2018 - 12.2021

Project Manager

Self
01.2018 - 12.2021

Concrete Finisher Foreman

High Performance Concrete
01.2012 - 12.2017

Communication Tower Technician

Rilo Electric
03.2010 - 06.2011

Shop Lead Fabricator

LPR Construction Co.
01.2007 - 02.2009

Tool Crib Manager

LPR Construction Co.
01.2005 - 01.2007

High School Diploma -

Harold Ferguson High School
Patrick Felt