Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Patrick Holder

Houston

Summary

Skilled Residential Framing Carpenter with over 40 years of experience in framing installation and project scheduling. Expertise in collaborating with teams to meet project timelines while maintaining a focus on safety and quality assurance.

Overview

44
44
years of professional experience

Work History

Residential Framing Carpenter

Eddie Holder
Huffman
01.1983 - Current
  • Constructed wooden frameworks for residential buildings according to blueprints.
  • Installed doors, windows, and other fixtures with precision and care.
  • Operated hand and power tools to complete framing tasks efficiently.
  • Collaborated with team members to ensure project timelines were met.
  • Inspected materials for quality before use in construction projects.
  • Maintained a clean and safe work environment on job sites.
  • Followed safety protocols while performing various carpentry tasks.
  • Constructed interior partitions, headers, stairways, door frames, window frames, and exterior wall structures.
  • Installed windows, doors, cabinets, countertops, trim molding, baseboards.
  • Hung drywall on walls and ceilings using a drill or screw gun.
  • Assisted in the layout and installation of walls, floors, and roof systems for residential framing projects.
  • Attached siding to the exterior of buildings using screws or nails.
  • Lifted heavy objects such as lumber onto roofs using ladders or hoists.
  • Repaired any faulty framing due to warped wood or structural damage from weather conditions.
  • Inspected all materials before use to ensure quality construction standards were met.
  • Cut openings in walls for plumbing pipes and electrical wiring.
  • Utilized hand tools such as levels, plumb bobs, chisels, drills and drivers.
  • Assembled floor joists by nailing them into place with hammers and nails.
  • Worked with blueprints and architectural drawings to determine project specifications.
  • Measured and cut lumber to desired lengths with a saw or power miter box.
  • Erected scaffolding around job sites as necessary for safety purposes.
  • Built stairs for decks and porches using pre-cut stringers.
  • Utilized various tools, equipment, materials and forming systems to complete construction tasks.
  • Worked independently on projects and tasks within carpentry team.
  • Removed damaged materials from structures to ensure safety and integrity. or defective parts or sections of structures and repaired or replaced using hand tools.
  • Measured and marked cut lines on materials using ruler or marking gauge.
  • Consistently constructed square and level projects.
  • Fashioned frameworks or props using hand tools and wood screws, nails or glue.
  • Bored boltholes in wood, masonry, or concrete using an electric or pneumatic drill to facilitate construction. in wood, masonry or concrete using electric or pneumatic drill.
  • Coordinated with subcontractors to work specialty areas, heating or electrical wiring work.

Education

GED -

Ross S Sterling
Baytown

Skills

  • Framing installation
  • Blueprint interpretation
  • Framework assembly
  • Structural integrity
  • Material inspection
  • Tool usage
  • Project scheduling

Languages

English
Professional

Timeline

Residential Framing Carpenter

Eddie Holder
01.1983 - Current

GED -

Ross S Sterling
Patrick Holder