Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Patrick Madrid

Fresno,CA

Summary

Responsible Foreman with excellent project oversight, team management and blueprint interpretation skills coupled with more than 33 years of experience. Achieves project milestones and adheres to deadlines and quality standards.

Focused Foreman considered expert in planning, assigning and directing work tasks. Dedicated team player committed to maintaining safe, clean job sites. Pursuing role where hard work and dedication will be highly valued.


Overview

33
33
years of professional experience
1
1
Certificate

Work History

Cellar Foreman

The Wine Group
7409 W Central Ave, Fresno 93709, CA
06.1986 - 05.2019
  • Checked equipment to determine if maintenance was required.
  • Reworked positions and workflow based on individual abilities and production targets.
  • Interacted with employees to demonstrate high standards and mitigate issues effectively.
  • Interviewed, hired and trained new workers.
  • Meticulously tracked parts and equipment used on each job site.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Inspected sights to evaluate safety, operations and crew performance against objectives.
  • Calculated materials and labor required to complete jobs on-schedule and prepared estimates.
  • Operated heavy equipment on daily basis.
  • Managed safety and security of location to prevent intrusion, criminal activity, vandalism and injuries to workers.
  • Oversaw employee attendance record, handled payroll and ordered new materials for sites.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Established clear priorities and production quality standards.
  • Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
  • Evaluated incoming materials for quality and amounts ordered.
  • Set and revised production schedules to meet changing demands.
  • Wrote production reports to help senior leadership make accurate operational plans and decisions.
  • Maximized resource utilization and achieved production targets by managing day-to-day usage of department resources.
  • Adaptable and proficient in learning new concepts quickly and efficiently
  • Resolved problems, improved operations and provided exceptional service
  • Delivered services to customer locations within specific timeframes
  • Assisted with day-to-day operations, working efficiently and productively with all team members
  • Developed strong organizational and communication skills through coursework and volunteer activities
  • Excellent communication skills, both verbal and written
  • Completed paperwork, recognizing discrepancies and promptly addressing for resolution
  • Self-motivated, with strong sense of personal responsibility
  • Acted as team leader in group projects, delegating tasks and providing feedback
  • Passionate about learning and committed to continual improvement
  • Worked flexible hours across night, weekend and holiday shifts
  • Demonstrated respect, friendliness and willingness to help wherever needed
  • Paid attention to detail while completing assignments
  • Gained strong leadership skills by managing projects from start to finish

Cement Finisher

Melton Construction
Kerman, CA
Jan1980 - Jun1983
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Set wood and other forming materials to prepare for concrete pours.
  • Mixed, spread, and patched concrete to specifications.
  • Demolished and repaired old concrete surfaces.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Wore correct clothing and protective equipment for jobs.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
  • Adhered to safety and reporting procedures.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Completed physically demanding tasks such as lifting up to 100 pounds to move job materials
  • Created specific finishes on poured concrete
  • Demolished and repaired old concrete surfaces
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms
  • Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards
  • Routinely lifted and moved items weighing up to 100 pounds
  • Wore correct clothing and protective equipment for jobs
  • Operated equipment such as forklifts safely to efficiently complete site work
  • Routinely lifted and moved items weighing up to 100 pounds
  • Set wood and other forming materials to prepare for concrete pours
  • Shoveled materials such as dirt, gravel, and asphalt
  • Mixed, spread, and patched concrete to specifications
  • Installed rebar and molded expansion joints and edges for concrete projects
  • Completed physically demanding tasks such as lifting up to 100 pounds to move job materials
  • Applied contraction, construction, or isolation joints in appropriate areas and situations
  • Prepared and placed concrete to create sidewalks, driveways, or patios
  • Cut, chipped, or sawed concrete to create desired shapes
  • Installed forms for shaping, insulating, or creating decorative effects in concrete
  • Handled repairs on concrete finishing equipment, keeping tools operational
  • Measured and marked areas for deploying concrete
  • Troweled and finished concrete to create textured or decorative surfaces
  • Mixed cement for standard, volumetric, or pervious concrete

Education

Security And Investigation Certificate - Security And Investigation

Barclay College
Fresno, CA
1984

High School Diploma -

Kerman High School
Kerman, CA
06.1983

Skills

  • Hiring Determinations
  • Project Leadership
  • Daily Reporting
  • Construction Vehicles Operation
  • Schedule Determination
  • Multi-Project Coordination
  • Specifications Conformance
  • Work Planning and Prioritization
  • Materials Estimations
  • Site Measuring and Marking
  • Site Inspection
  • Rough Layouts
  • Budget Development
  • Effective Communication
  • Dimensions and Measurements
  • Structural Repairs
  • Workflow Coordination
  • Maintenance Requirements
  • Engineering and Technology
  • Fall Protection
  • Electrical Installations
  • Critical Thinking
  • Process Improvement Initiatives
  • Shift Coverage
  • Stress Tolerance
  • Methodology Enhancement
  • Voltage Electrical Equipment
  • Word Processing
  • Status Meetings
  • Work Site Preparation
  • Presentation Delivery
  • Preventive Equipment Maintenance
  • Analyzing Details
  • Welding and Brazing
  • Physical Strength and Stamina
  • Local and National Codes
  • Ladder Work

Certification

  • Train The Trainer Forklift Operator Safety Program, Clark - 20-2009
  • Ammonia Safety and Training, ASTI -2001- 2005
  • Scissor-lift Trainer, Wine Group - 2010-2019
  • Weigh Master, Wine Group - 1986-2019
  • Hazardous Wast Operations and Emergency Response Training -1986- 2015
  • CPR and First Aid, American Red Cross] - 1983-2019

Timeline

Cellar Foreman

The Wine Group
06.1986 - 05.2019

Cement Finisher

Melton Construction
Jan1980 - Jun1983

Security And Investigation Certificate - Security And Investigation

Barclay College

High School Diploma -

Kerman High School
Patrick Madrid