Experienced facility manager/project manager with over 30 years of expertise in the operation and project management of medical device and semiconductor production. Known for high level of competency, motivated and dependable self-starter who thrives on challenges. Excels at skillfully managing time and resources, working effectively in a team setting, and consistently striving for excellence to achieve positive results.
Overview
43
43
years of professional experience
Work History
Facilities Engineer/Facilities Manager
Meyer Burger Industrial Americas
01.2023 - Current
Managed site facility (Fire protection system, Pest Controls, Site landscaping services and site construction coordination) in preparation for building conversion to solar cell manufacturing facility
Involved in strategic planning and design of retired semiconductor facility to solar cell manufacturing
Planning involved to $ 375 million dollar project to retrofit facility into PV manufacturing.
Facilities Manager/Facility Project Manager
Spectranetics Corporation/Philips Corporation
01.2008 - 01.2023
- Management of multiple projects involving both outside and inside CER (Controlled Environmental Room) - Management of CER (Extrusion Area) build for ISO 8 area, to include all facilities validation IQ (Installation Qualification) of cleanroom -Lead in main cleanroom modifications (Air exchange modifications and exhaust improvements) to eliminate physical TOC barriers in main production floor. -Lead in exhaust system upgrade for t cleanroom. - Build out of machine shop and managed equipment move from Cascade facility to Federal. -Build out of onsite medical clinic (Paladina) with on time and under budget delivery. -Spearheaded transition from FaciliWorks maintenance program to Maintenance Connection system
Involving coordination of validation between Spectranetics QE software engineer and Maintenance Connection validation engineers. - Lead on build out of additional office space at 9945 (Hybrid) annex. - Negotiate pricing and contracts with contractors and vendors on construction projects.
Controlled expenses to meet budget requirements.
Oversaw all aspects of equipment installation, maintenance, and repair for both internal and external services.
Created management reports outlining important facility statistics.
Responded to building emergencies and managed repairs.
Supervised staff in day-to-day activities.
I&C Technician IV
Intel Corporation
01.2000 - 01.2008
- Responsibility and maintain Direct Digital Control PLC (SCADA) system for HVAC, boiler, chiller and industrial waste water controls
Controls to include Cimplicity HMI platform involving scripting, screen design and database management
Responsible for all calibration and repairs of all field devices. - Operate in support structure for LSS HPM system at facility
This includes
VESDA, MDA's, ControlLogix life safety systems. -Write maintain and implement PLC code changes for energy management and improvement projects. -Supported Intel’s safety program as acting chair of SST (Safety Segment Team) with facility safety record of 7 plus years injury and incident free.
Identified issues by testing and troubleshooting instruments, components and assemblies using voltmeters, circuit testers and oscilloscopes.
Removed damaged instruments and repaired components.
Cleaned and adjusted instruments.
I&C Engineering Technician
Atmel Corporation
01.1999 - 01.2000
- Responsibility and maintain DCS Foxboro (SCADA) system for HVAC, boiler, chiller and industrial waste water controls. - Write maintain and update facility operational specifications and procedures. - Involved in maintenance and calibration of facility control systems.
Facility Engineering Technician II
Rockwell Semiconductor
01.1995 - 01.1998
- Direct responsibility for operation and maintenance of Ultra Pure Water System. - Involved in maintenance and calibration of waste water control systems. - Managed and maintained Simplex alarm system. -Operate and maintain Direct Digital Control PLC (SCADA) system for HVAC, boiler, chiller and industrial waste water controls. - Conduct bacteria and pH control analysis on reverse osmosis equipment. - Operate and maintain high pressure pump system. - Write maintain and update facility operational specifications and procedures. -Managed and maintained bulk gas analytical equipment - Designed installed multiple Ultrapure water and controls projects.
Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.
Facility Technician I & II
United Technologies
01.1982 - 01.1995
-Involved with all facility support systems, including UPW, waste water, bulk gas, boiler, chiller, HVAC and building automation controls.
Education
Skills
Ladder Logic Programming
Direct Digital Controls Programming (Basic)
Simplex Alarm System Programming (Model 2120)
BASIC Computer Language
FORTRAN Computer Language
VBAScripting
Microsoft Project
Excel Spreadsheet
Lean principles
Building Codes
Equipment Installation
Asset Management
Construction management
Timeline
Facilities Engineer/Facilities Manager
Meyer Burger Industrial Americas
01.2023 - Current
Facilities Manager/Facility Project Manager
Spectranetics Corporation/Philips Corporation
01.2008 - 01.2023
I&C Technician IV
Intel Corporation
01.2000 - 01.2008
I&C Engineering Technician
Atmel Corporation
01.1999 - 01.2000
Facility Engineering Technician II
Rockwell Semiconductor
01.1995 - 01.1998
Facility Technician I & II
United Technologies
01.1982 - 01.1995
Similar Profiles