Experienced facility manager/project manager with over 30 years of expertise in the operation and project management of medical device and semiconductor production. Known for high level of competency, motivated and dependable self-starter who thrives on challenges. Excels at skillfully managing time and resources, working effectively in a team setting, and consistently striving for excellence to achieve positive results.

Overview

43
43
years of professional experience

Work History

Facilities Engineer/Facilities Manager

Meyer Burger Industrial Americas
01.2023 - Current
  • Managed site facility (Fire protection system, Pest Controls, Site landscaping services and site construction coordination) in preparation for building conversion to solar cell manufacturing facility
  • Involved in strategic planning and design of retired semiconductor facility to solar cell manufacturing
  • Planning involved to $ 375 million dollar project to retrofit facility into PV manufacturing.

Facilities Manager/Facility Project Manager

Spectranetics Corporation/Philips Corporation
01.2008 - 01.2023
  • - Management of multiple projects involving both outside and inside CER (Controlled Environmental Room) - Management of CER (Extrusion Area) build for ISO 8 area, to include all facilities validation IQ (Installation Qualification) of cleanroom -Lead in main cleanroom modifications (Air exchange modifications and exhaust improvements) to eliminate physical TOC barriers in main production floor. -Lead in exhaust system upgrade for t cleanroom. - Build out of machine shop and managed equipment move from Cascade facility to Federal. -Build out of onsite medical clinic (Paladina) with on time and under budget delivery. -Spearheaded transition from FaciliWorks maintenance program to Maintenance Connection system
  • Involving coordination of validation between Spectranetics QE software engineer and Maintenance Connection validation engineers. - Lead on build out of additional office space at 9945 (Hybrid) annex. - Negotiate pricing and contracts with contractors and vendors on construction projects.
  • Controlled expenses to meet budget requirements.
  • Oversaw all aspects of equipment installation, maintenance, and repair for both internal and external services.
  • Created management reports outlining important facility statistics.
  • Responded to building emergencies and managed repairs.
  • Supervised staff in day-to-day activities.

I&C Technician IV

Intel Corporation
01.2000 - 01.2008
  • - Responsibility and maintain Direct Digital Control PLC (SCADA) system for HVAC, boiler, chiller and industrial waste water controls
  • Controls to include Cimplicity HMI platform involving scripting, screen design and database management
  • Responsible for all calibration and repairs of all field devices. - Operate in support structure for LSS HPM system at facility
  • This includes
  • VESDA, MDA's, ControlLogix life safety systems. -Write maintain and implement PLC code changes for energy management and improvement projects. -Supported Intel’s safety program as acting chair of SST (Safety Segment Team) with facility safety record of 7 plus years injury and incident free.
  • Identified issues by testing and troubleshooting instruments, components and assemblies using voltmeters, circuit testers and oscilloscopes.
  • Removed damaged instruments and repaired components.
  • Cleaned and adjusted instruments.

I&C Engineering Technician

Atmel Corporation
01.1999 - 01.2000
  • - Responsibility and maintain DCS Foxboro (SCADA) system for HVAC, boiler, chiller and industrial waste water controls. - Write maintain and update facility operational specifications and procedures. - Involved in maintenance and calibration of facility control systems.

Facility Engineering Technician II

Rockwell Semiconductor
01.1995 - 01.1998
  • - Direct responsibility for operation and maintenance of Ultra Pure Water System. - Involved in maintenance and calibration of waste water control systems. - Managed and maintained Simplex alarm system. -Operate and maintain Direct Digital Control PLC (SCADA) system for HVAC, boiler, chiller and industrial waste water controls. - Conduct bacteria and pH control analysis on reverse osmosis equipment. - Operate and maintain high pressure pump system. - Write maintain and update facility operational specifications and procedures. -Managed and maintained bulk gas analytical equipment - Designed installed multiple Ultrapure water and controls projects.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.

Facility Technician I & II

United Technologies
01.1982 - 01.1995
  • -Involved with all facility support systems, including UPW, waste water, bulk gas, boiler, chiller, HVAC and building automation controls.

Education

Skills

  • Ladder Logic Programming
  • Direct Digital Controls Programming (Basic)
  • Simplex Alarm System Programming (Model 2120)
  • BASIC Computer Language
  • FORTRAN Computer Language
  • VBAScripting
  • Microsoft Project
  • Excel Spreadsheet
  • Lean principles
  • Building Codes
  • Equipment Installation
  • Asset Management
  • Construction management

Timeline

Facilities Engineer/Facilities Manager

Meyer Burger Industrial Americas
01.2023 - Current

Facilities Manager/Facility Project Manager

Spectranetics Corporation/Philips Corporation
01.2008 - 01.2023

I&C Technician IV

Intel Corporation
01.2000 - 01.2008

I&C Engineering Technician

Atmel Corporation
01.1999 - 01.2000

Facility Engineering Technician II

Rockwell Semiconductor
01.1995 - 01.1998

Facility Technician I & II

United Technologies
01.1982 - 01.1995

Patrick Marron