Summary
Overview
Work History
Education
Skills
Timeline
Generic

Patrick Tennie

Newnan,Ga

Summary

Hard-working Supervisor with exceptional experience leading teams, delivering results and exceeding expectations. Creative and motivated leader adept at utilizing exceptional design and planning strengths to accomplish complex projects. Skilled in teaching new concepts and best practice strategies with 27 years of experience in working in the Concrete industry.

Overview

27
27
years of professional experience

Work History

Project Manager Supervisor

Kleenco Construction
08.2015 - Current
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
  • Planned, designed, and scheduled phases for large projects.
  • Met project deadlines without sacrificing build quality or workplace safety.
  • Established effective communication among team members for enhanced collaboration and successful project completion.
  • Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
  • Delivered exceptional customer satisfaction by proactively addressing client concerns and meeting or exceeding expectations throughout the engagement process.
  • Monitored progress against established goals, adjusting schedules and resources as needed to keep projects on track.
  • Developed strong relationships with stakeholders through regular communication updates, fostering trust and confidence in the team''s ability to deliver results.
  • Monitored project performance to identify areas of improvement and make adjustments.
  • Provided detailed project status updates to stakeholders and executive management.
  • Streamlined project initiation processes, enabling quicker transition from planning to execution.
  • Recruited and oversaw personnel to achieve performance and quality targets.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Set wood and other forming materials to prepare for concrete pours.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Collaborated with team members to ensure smooth transitions between different phases of the concrete placement process.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Created specific finishes on poured concrete.
  • Enhanced overall job site safety by ensuring proper usage of tools and equipment during concrete finishing processes.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Demonstrated versatility by successfully completing various types of concrete projects, including residential, commercial, and industrial applications.
  • Minimized downtime during projects by properly maintaining tools, equipment, and machinery essential for efficient execution of tasks related to concrete finishing.
  • Assisted in training new employees on proper techniques and best practices for concrete finishing tasks.
  • Reduced material wastage through effective use of leveling, screeding, and concrete smoothing techniques.

Concrete Finisher

Fayetteville County Public Schools
03.2002 - 06.2012
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
  • Operate and maintain heavy equipment and small tools such as telehandler, trowel machines (ride-on and walk-behind), generators, vibrators, saws, etc.
  • Use and sequence of straight edges, bull floats, mops and highway straight edges, float blades, combo blades, hand tools, sledgehammer, hand saws, power drills, saws, lasers, finish blades, etc.
  • Tie and place rebar, wire mesh, and post-tensioning cables.
  • Assemble wooden or metal concrete forms, ties, and shoring.
  • Pour, vibrate, and finish concrete foundations, walls, stairs, and slabs.
  • Applied sealers or waterproofing to concrete as required by project.

Machinery Operator

Mega Granite
03.2012 - 03.2012
  • Ensured compliance with industry regulations by following established guidelines for safe machinery operation at all times.
  • Established a reputation for reliability by consistently arriving on time, maintaining high attendance levels, and displaying a strong work ethic throughout the duration of employment as a Machinery Operator.
  • Reduced downtime by promptly troubleshooting and resolving machinery issues.
  • Demonstrated excellent communication skills while coordinating with team members on project status updates, changeovers, equipment adjustments, resulting in smoother workflows.
  • Identified malfunctions or failures by routinely monitoring and analyzing equipment operations.
  • Utilized various hand tools and measuring instruments to perform machine setups, fine-tune adjustments, and verify product dimensions for quality assurance purposes.
  • Tended operating machinery to identify equipment malfunctions and locate sources of product defects.
  • Complied with company and OSHA safety rules and regulations.
  • Exceeded performance expectations by consistently meeting or surpassing established goals for output quantity and quality while operating multiple types of machinery simultaneously when required.
  • Loaded raw materials into machines and unloaded finished products to keep manufacturing process running smoothly.
  • Calibrated, tested, and adjusted machine settings or controls in preparation for production operations.
  • Set up and ran machinery to produce exceptional products for industrial needs.
  • Perform repetitive tasks such as lifting up to 50 lbs., walking, climbing, stooping, standing, pushing, and/or pulling for extended periods of time, in a hot, humid, cold, dusty, and noisy industrial environment - this may also include working in high and/or confined spaces

Co-Owner/Operator

Tennie Construction
07.1997 - 02.2012
  • Construction: Constructed and maintained concrete structures like driveways, patios, roads, and sidewalks
  • Ensured compliance with all local, state, and federal regulations for safe business practices.
  • Preparation: Read and interpreted blueprints, instructions, and specifications
  • Mixing: Mixed ingredients to obtain concrete
  • Pouring: Assisted with pouring and leveling concrete
  • Finishing: Used hand tools and equipment to texture concrete surfaces and create unique finishes
  • Maintenance: Performed maintenance work on concrete structures
  • Quality: Ensured adherence to quality standards and safety regulations
  • Records: Maintained accurate records of work performed and materials used
  • Overseeing daily operations to ensure efficiency and quality of products or services.
  • Building and maintaining relationships with partners, suppliers, and customers.
  • Recruiting, training, and managing staff, and fostering a positive work environment.

Education

High School Diploma -

Newnan High School
Newnan Georgia
05.2000

Skills

  • Project Management
  • Staff Management
  • Project planning and development
  • Project Scheduling
  • Customer Relations
  • Work flow planning
  • Risk Management
  • Concrete finishing
  • Power Tool Operation
  • Commercial construction experience
  • Hand troweling
  • Broom finishing
  • Sidewalk Construction
  • Cement and pavement
  • Polished concrete
  • OSHA protocols
  • Class A Commercial Driver's License
  • Blueprint reading abilities
  • Machinery inspection
  • Site Prep
  • Bobcat operator
  • Responsible for the proper forming, reinforcement, footer emplacement, and surface finishing of concrete emplacement slabs
  • willing and able to travel 75-85% as required (driving company vehicle and/or fly commercially if necessary)
  • Mixing machine Operator
  • Skilled in Commercial Concrete
  • Concrete, Grout and Slurry Mixing

Timeline

Project Manager Supervisor

Kleenco Construction
08.2015 - Current

Machinery Operator

Mega Granite
03.2012 - 03.2012

Concrete Finisher

Fayetteville County Public Schools
03.2002 - 06.2012

Co-Owner/Operator

Tennie Construction
07.1997 - 02.2012

High School Diploma -

Newnan High School
Patrick Tennie