Electrician
Quality Labor Management LLC
Tampa, FL
05.2024 - Current
- Constructed control panels from blueprints or schematic drawings.
- Worked on high voltage switchgear projects involving transformer hookups and terminations up to 15kv level.
- Assisted with the layout of large scale industrial plant projects.
- Identified problems with electrical systems by observing operation, listening for problems and using test equipment such as multi-meters.
- Repaired or replaced worn or defective parts using hand tools and power tools.
- Installed emt, ridged pipe, and pvc for new wiring systems in commercial buildings.
- Connected wires to circuit breakers and transformers.
- Worked on three-phase, 277/480 volt power panels.
- Performed electrical installations, maintenance and repairs of electrical systems, wiring, fixtures and components.
- Interpreted blueprints and technical drawings to correctly assemble panels and control boxes.
- Connected wires to circuit breakers, transformers, or other components.
- A few times I led small teams to install, maintain and repair electrical wiring
- Dismantled electrical components using hand tools to disconnect and restore wiring connections.
- Pulled insulated wires or cables through conduits to complete circuits.
- Trained workers to install, maintain and repair electrical equipment and fixtures.