A leader in the construction industry with more than 20 years of managerial experience and an owner's mindset. Plug and play superintendent Project Ranging for 1 million T.I construction to 140 million Ground up Mission Critical center. Great Understanding HRA's, WPS, EAP's, SSP, PTP with Mission critical Electrical Energization Plan (EEP). Always starving to learn the right the way the first time, Communication is key in the field to catch road blocks. Best to ask the question if the clash is obviously a common sense fix. Always looking to bring in that end Date in.

Overview

26
26
years of professional experience
1
1
Certification

Work History

Project Superintendent

HITT Contracting
12.2021 - Current

Projects To-date value

  • Ground Up Mission Critical $140 Million
  • Ground Up Base Build Three tilt up $87 million
  • Public Work Dry Lab $9 million
  • Mission Critical PDU/ Busways /PQM retrofit $6 million
  • Private Dry Lab Active Nuclear Research $18 million
  • Higher Education 20K SQFT T.I w/custom Stair case $9 million

Project Superintendent

Dome Construction
07.2018 - 03.2020
  • Expand customer satisfaction as primary point of contact for senior management, building inspectors, and on-site personnel. Reach project milestones by integrating efforts of subcontractors and vendors with company personnel. Fashion daily progress reports with photographs and text, answer requests for information (RFI), create work schedules, enforce safety policies, oversee talent acquisition, and handle disciplinary matters.
  • Earned $15K bonus in 2020 for completing all projects on time, below budget, and within safety parameters.
  • Completed 8 commercial building projects between 6 months to 2 years in length and $400K to $6M in value.
  • Lead between 10—40 workers and coordinate 10—12 subcontracting and vendor teams on each project.
  • Maintain an exemplary safety record by beginning each day with a safety-minded "Huddle Meeting" and by directing weekly safety seminars. Prevented any work site fatality and an amputation of any type.
  • Masterminded the most efficient sequencing order for each project milestone.
  • Key Projects at Dome:
  • Nvidia.com — Santa Clara, CA
  • Building R Upgrade
  • Ended a 4-month $6M project on schedule while integrating 20+ workers and 12 subcontractors/vendors.
  • Built 30K-sqft of new floor space including 10K-sqft. of office facilities and a 5K-sqft. cafeteria.
  • Assembled 800-sqft. of temporary walls to mitigate dust and noise while 1,000+ Nvidia employees maintained regular working hours at the same location.
  • Upgraded electrical and fire systems within the building and passed all inspections the first time.
  • Agilent.com — San Jose, CA
  • Maintenance and TI Upgrades
  • Finished a $3M project targeted for a 24-hour time that included 35+ workers plus 3 subcontractor and vendor companies. Overhauled the building's water system, fabricated new conference rooms, and upgraded all electrical systems.
  • Concluded a 24-hour project in 14 hours and within budget.
  • Lake Pharma Biologics — Redwood City, CA
  • Laboratory and Office Upgrades
  • Guided a 5-month $800K project incorporating 10 workers and 8 subcontractors/vendors. Rebuilt 6K-sqft. of floor space on the second floor of an occupied 3-story building and outfitted a new 1200-sqft. level 2 laboratory.
  • Installed firewalls, HVAC fire-dampening system, fume hoods, and a waste disposal system in the laboratory.
  • Met timeline objectives despite a 40-day decrease in project deadline.

Project Superintendent

Cody/Brock Commercial Builders
11.2016 - 07.2018
  • Traveled between different work locations and conquered milestones within targeted deadlines. Finalized 6 crucial builds, monitored material requisition requests, governed cost and resource management for subcontractors by issuing notices of non-compliance.
  • Spearheaded weekly meetings between subcontractors, vendors, and consultants to ensure seamless schedule compatibility and power-hitting coordination of goals.
  • Ensure that all work sites were well-organized, safe, and clean with accurate and updated documents.
  • Key Projects at Cody/Brock:
  • Cushman & Wakefield (Gary Hansen) — San Jose, CA
  • Silver Creek Valley
  • Actualized a "market-ready" 30K-sqft. commercial property by coordinating a crew of 15+ workers, along with 10 vendor and subcontractor teams. Fulfilled plans for a complete "Underground Works" beneath the facility including all service piping. Erected all prefabricated iron framing for the structure.
  • Equipped entire facility with Americans with Disabilities Act/ADA complaint pathways.

Superintendent

West Sierra Builder
03.2011 - 11.2016
  • Crafted sustainable procedures, defect plans, and co-designed assessment systems in partnership with engineers and consultants. Verified blueprints and identified needed facility repairs after inspections.
  • Envisioned and implemented preventative maintenance routines that reduced service equipment downtime.

Superintendent

Kilik Engineering
10.1999 - 02.2011
  • Planned and conducted construction site surveys to establish baselines, elevations, and other geodetic metrics. Measured and marked property lines with theodolites, transits, levels, and satellite-based global positioning systems to determine latitudes and key topographical features while also coordinating work crews.

Skills

  • Work Schedule Development
  • Cross Functional Team Management
  • Safety Management
  • Vendor Account Management
  • Building Inspections
  • Subcontractor management
  • Energy management
  • OSHA Regulations
  • Teamwork
  • Quality Assurance
  • Hazardous Materials Management
  • PlanGrid
  • Procor
  • Microsoft Projects
  • Microsoft Excel
  • Microsoft Word

Certification

  • Certifications: Aerial Operator
  • Forklift Certification Class V, VII
  • OSHA 30-Hour
  • First Aid/ CPR

Languages

Spanish
Professional Working

Timeline

Project Superintendent

HITT Contracting
12.2021 - Current

Project Superintendent

Dome Construction
07.2018 - 03.2020

Project Superintendent

Cody/Brock Commercial Builders
11.2016 - 07.2018

Superintendent

West Sierra Builder
03.2011 - 11.2016

Superintendent

Kilik Engineering
10.1999 - 02.2011
Paul Buentello