Summary
Overview
Work History
Education
Skills
Timeline
Generic

Paul Conner

Summary

Dynamic and results-oriented professional with extensive experience at Ace Hardware, adept in inventory management and customer relations. Excelled in enhancing customer satisfaction and reducing installation errors at TUSONIX through meticulous quality control and efficient problem-solving. Skilled in forklift operation and possesses strong safety awareness, demonstrating a commitment to maintaining high safety standards and operational excellence.

Project Regulations

Work Planning and Prioritization

Responsible, Reliable

Works well with others, or independently

Overview

22
22
years of professional experience

Work History

Sales Floor Manager

Ace Hardware
01.2022 - Current
  • Demonstrated product and answered questions for prospective customers.
  • Developed strong and lasting rapport to improve customer service and retain valued clients.
  • Managed inventory effectively, ensuring optimal stock levels and timely merchandise availability.
  • Maintained positive customer relations by addressing problems head-on and implementing successful corrective actions.

Lead Installer

TUSONIX
04.2008 - 12.2021
  • Improved customer satisfaction by providing efficient and accurate installations.
  • Reduced installation errors, implementing thorough quality control measures.
  • Tended to machines, troubleshot malfunctions and completed basic repairs to keep equipment fully functional and well-maintained.
  • Tested systems, noting issues and completing preventive maintenance.
  • Assisted with system design and layout to optimize installations and continuous performance.
  • Operated tools, equipment, and machinery according to safety standards.

Shop Production

California Closet Company
03.2002 - 06.2020
  • Loaded trucks properly secured items to prevent damage on deliveries
  • Managed efficient unloading of freight, inspected merchandise, and documented customer concerns for supervisions.
  • Removed and unloaded packages from trucks for customer deliveries, using extreme care to avoid damage to goods.
  • Worked scheduled hours as required and took on available shifts during holidays and busy periods.
  • Completed daily inspections, basic maintenance and common repair actions to keep equipment operating at full capacity.
  • Strengthened relationships with vendors to secure favorable pricing on supplies while ensuring high-quality products were consistently delivered on time.

Education

Some College - Building Construction Technology

The Construction School
Marana, AZ

High School Diploma -

Marana High School
Marana, AZ
05.2005

Skills

  • MSHA
  • General Safety Skills
  • C-Pac Security and Threat Awareness Annually
  • Look out/Tag out
  • US DOT Awareness
  • Respirator Training
  • Hazardous Waste Operations/RCRA Training
  • Forklift Certified
  • First Aid, CPR, Bloodborne pathogen

Timeline

Sales Floor Manager

Ace Hardware
01.2022 - Current

Lead Installer

TUSONIX
04.2008 - 12.2021

Shop Production

California Closet Company
03.2002 - 06.2020

Some College - Building Construction Technology

The Construction School

High School Diploma -

Marana High School
Paul Conner