Summary
Overview
Work History
Education
Skills
Timeline
Generic

Payton Reneau

Weatherford,TX

Summary

Results-driven professional with experience at Blattner Energy and KEG 1 O'Neal. Proven ability in data accuracy and material handling, showcasing strong attention to detail and team collaboration. Recognized for enhancing project efficiency and maintaining high safety standards while consistently meeting performance goals. Proficient in basic mathematics and committed to a clean, organized workspace.

Overview

3
3
years of professional experience

Work History

Underground Electrician

Parish Utilities
Weatherford, TX
08.2025 - Current
  • Installed and maintained underground electrical systems to ensure operational efficiency.
  • Conducted routine inspections and troubleshooting of electrical equipment for optimal performance.
  • Interpreted blueprints and technical drawings to facilitate accurate installations.
  • Implemented safety protocols to minimize risks during excavation and wiring tasks.

Warehouse Worker

KEG 1 O'Neal
Weatherford, TX
01.2024 - Current
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Consistently lifted materials weighing as much as 50 pounds.
  • Maintained clean workspaces by following strict guidelines for storage areas, dock bays, and equipment zones.
  • Contributed to achieving team goals with consistent punctuality, reliability, and adherence to established performance standards.
  • Assisted in the training and onboarding of new employees, contributing to a cohesive and efficient workforce.
  • Ensured accurate order fulfillment by diligently cross-checking pick lists against packed items for consistency.

Field Surveyor

Blattner Energy
Plainview, TX
10.2022 - 12.2023
  • Demonstrated commitment to safety by following established protocols, attending training sessions, and wearing appropriate protective gear during all field activities.
  • Reduced errors in final reports by meticulously reviewing collected data for discrepancies
  • Increased project efficiency by utilizing advanced survey equipment and software for precise measurements and data analysis
  • Ensured proper spacing for site and silt fences.
  • Performed daily morning checks on all equipment.
  • Utilized GPS technology and topographic data to enhance project accuracy.

Education

High School Diploma -

Millsap ISD
Millsap, TX
05.2023

Skills

  • Self-motivated and disciplined
  • Cleaning and organizing
  • Heavy lifting
  • Attention to detail
  • Team collaboration
  • Material loading and unloading
  • Basic mathematics
  • Basic computer proficiency

Timeline

Underground Electrician

Parish Utilities
08.2025 - Current

Warehouse Worker

KEG 1 O'Neal
01.2024 - Current

Field Surveyor

Blattner Energy
10.2022 - 12.2023

High School Diploma -

Millsap ISD