Summary
Overview
Work History
Education
Skills
Timeline
Generic

Pedro Escobedo

Clute,TX

Summary

Hardworking roofer well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines. Capable Construction Laborer experienced in operating and maintaining equipment to support job site needs. Physically strong and fit with good time management abilities and dexterity to support skilled work. Determined Construction Worker brings solid experience filling various roles on projects. Detail-oriented approach to meeting team and project needs on time. Knack for basic carpentry, roofing and materials management.

Overview

14
14
years of professional experience

Work History

Construction Worker

Diego's Company
Clute, TX
01.2018 - 12.2023
  • Mixed concrete, mortar and other materials to prepare building material.
  • Installed formwork for concrete structures according to specifications.
  • Assisted in the preparation of construction sites by clearing debris, leveling ground and erecting scaffolding.
  • Operated a variety of tools to excavate, move and grade earth for foundations, trenches and roads.
  • Lifted heavy objects into place with cranes or hoists.
  • Repaired damaged structures with appropriate materials including wood and metal components.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Completed carpentry work and installed crown molding and wood flooring to meet customer preferences.

Roofer

TEX-MEX HOUSE ROOFING
Freeport, TX
01.2010 - 01.2018
  • Climbed ladders and scaffolding to reach roofs for inspection, repair, or installation.
  • Installed underlayment, shingles, metal roofing systems, and other materials to construct roofs.
  • Inspected existing roofs for damage or leaks and applied sealants when necessary.
  • Repaired damaged areas of the roof using tar and other waterproofing materials.
  • Removed old roof coverings in preparation for new installations.
  • Measured and cut materials according to specifications with hand tools such as hammers, saws, chisels.
  • Maintained accurate records of completed jobs including measurements and material used.

Education

Mexico High School
Mexico

Skills

  • Scaffold building
  • Team-oriented and dependable
  • Power Tool Operation
  • Window Installation
  • Site preparation
  • Worksite preparation
  • Flooring Installation
  • Carpentry
  • Construction

Timeline

Construction Worker

Diego's Company
01.2018 - 12.2023

Roofer

TEX-MEX HOUSE ROOFING
01.2010 - 01.2018

Mexico High School
Pedro Escobedo