Parkland Hospital
- Ran conduit (1/2” – 4” EMT/rigid) to support electrical systems in operation rooms.
- Terminated electrical panels (120V, 240V, 480V) for hospital systems.
- Installed and connected fixtures, ensuring compliance with safety standards.
- Troubleshot electrical issues, performing system repairs and enhancements.
Winstar Hotel
- Installed and ran conduit (1/2” – 4” EMT/rigid) throughout hotel facilities.
- Terminated electrical panels (120V, 240V, 480V), ensuring seamless power distribution.
- Installed fixtures, including lighting and electrical outlets.
- Performed troubleshooting on electrical systems, addressing malfunctions quickly and effectively.
Capital One Offices –
- Ran conduit for cubicles and other office infrastructure, ensuring efficient electrical layouts.
- Installed floor plugs and terminated electrical services (120V, 240V, 480V).
- Installed and hung fixtures to meet design and functionality requirements.
- Troubleshot electrical issues and performed corrective maintenance to improve system performance.
The Heart Hospital Baylor Scott –
- Installed conduit (1/2” – 4” EMT/rigid) to support hospital electrical systems.
- Terminated electrical panels (120V, 240V, 480V) and connected hospital equipment.
- Installed lighting and electrical fixtures in operating rooms and other critical areas.
- Troubleshot electrical systems to ensure patient safety and operational efficiency.
- Conduit installation (EMT/Rigid, 1/2” – 4”)