Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Pedro Rodriguez

Dallas,Texas

Summary

Dedicated construction worker with RDZ Construction, skilled in concrete repair and slab pouring. Proven problem-solver with a strong focus on worksite safety and team collaboration. Successfully maintained organized job sites, enhancing efficiency and safety while delivering high-quality results in fast-paced environments. Committed to excellence in all aspects of construction.

Overview

4
4
years of professional experience

Work History

Construction Worker

RDZ Construction
Dallas, TX
05.2021 - Current
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Set wood and other forming materials to prepare for concrete pours.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Created specific finishes on poured concrete.

Education

Trinidad Garza ECHS
Dallas, TX

Skills

  • Problem-solving
  • Heavy lifting
  • Construction
  • Attention to detail
  • Power tool operation
  • Team collaboration
  • Worksite safety
  • Equipment operation
  • Slab pouring
  • Concrete cutting
  • Concrete repair
  • Surface preparation
  • Concrete mixing

Languages

Spanish
Native or Bilingual

Timeline

Construction Worker

RDZ Construction
05.2021 - Current

Trinidad Garza ECHS
Pedro Rodriguez