Summary
Work History
Education
Skills
Timeline
Generic

Peter McGinley

Dublin,PA

Summary

With a proven track record at Scollon Contractors, I excel in concrete finishing and worksite safety, showcasing my ability to enhance project quality by 30%. My expertise spans from forklift operation to advanced concrete sculpting, underpinned by a strong foundation in OSHA protocols and inventory management.

Work History

Concrete Finisher

Scollon Contractractors
  • Wore correct clothing and protective equipment for jobs.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Mixed, spread, and patched concrete to specifications.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Applied concrete fabrication techniques to achieve desired project specifications, quality, and code standards.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Routinely lifted and moved items weighing up to Number pounds.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
  • Set wood and other forming materials to prepare for concrete pours.
  • Created specific finishes on poured concrete.
  • Demolished and repaired old concrete surfaces.
  • Observed manufacturer's safety procedures and corporate standards for pouring and finishing.
  • Estimated materials and labor costs for concrete projects to manage project budgets.
  • Prepared and placed concrete to create sidewalks, driveways, or patios.
  • Inspected concrete structures for complete fills, defects, or damage.
  • Repaired damaged items using different chemicals and tools.
  • Handled repairs on concrete finishing equipment, keeping tools operational.
  • Mixed cement for standard, volumetric, or pervious concrete.
  • Measured and marked areas for deploying concrete.
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Applied sealers or waterproofing to concrete as required by project.
  • Troweled and finished concrete to create textured or decorative surfaces.
  • Adhered to safety and reporting procedures.
  • Cut, chipped, or sawed concrete to create desired shapes.
  • Installed forms for shaping, insulating, or creating decorative effects in concrete.
  • Applied contraction, construction, or isolation joints in appropriate areas and situations.

Union Laborer

JJ Dougherty
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Prepared job sites by removing debris and setting up materials and tools.
  • Operated power equipment to move materials and promote job efficiency.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Interacted daily with various project managers, subcontractors, and municipal inspectors to complete construction projects.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Worked on sites, installing roofs and other exterior components.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Operated forklifts and boom lifts to complete various tasks.
  • Installed drywall, siding and other structural components.
  • Cleaned and maintained tools, equipment and worksites.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Mixed and poured concrete for variety of projects.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Loaded and unloaded materials onto trucks and trailers.
  • Used variety of hand and power tools to complete tasks.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Provided labor support to carpenters, masons and other skilled trades.
  • Helped with erecting scaffolding and ladders.
  • Helped with door and window installations.

Concrete Laborer

Austin Contractor Services
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
  • Set wood and other forming materials to prepare for concrete pours.
  • Demolished and repaired old concrete surfaces.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Routinely lifted and moved items weighing up to Number pounds.
  • Trained new laborers in crew processes and safety behaviors.
  • Operated diverse manual and power tools to cut and shape concrete to required specifications.
  • Safely operated concrete-cutting and finishing drills, power saws and trowels to complete assigned tasks.
  • Assisted with concrete mixing, following instructions for proper ratios of cement, sand and water.
  • Assisted with installation of steel and anchor bolts to reinforce concrete.
  • Utilized wheelbarrows, shovels and other tools to move, spread and level concrete.
  • Participated in concrete pouring and finishing, expertly managing application of sealers and curing compounds.
  • Interpreted blueprints and diagrams to determine project dimensions and requirements.
  • Applied contraction, construction, or isolation joints in appropriate areas and situations.
  • Handled repairs on concrete finishing equipment, keeping tools operational.
  • Estimated materials and labor costs for concrete projects to manage project budgets.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Inspected concrete structures for complete fills, defects, or damage.
  • Adhered to safety and reporting procedures.
  • Shoveled materials such as dirt, gravel, and asphalt.
  • Installed forms for shaping, insulating, or creating decorative effects in concrete.
  • Reviewed all project documentation and blueprints to prioritize and schedule job tasks.
  • Repaired damaged items using different chemicals and tools.
  • Operated equipment such as forklifts safely to efficiently complete site work.
  • Troweled and finished concrete to create textured or decorative surfaces.

Education

Graduated - General

Northeast Catholic
North East, PA
06.1996

Skills

  • Worksite safety
  • Concrete finishing
  • Defect correction
  • Forklift operation
  • Power tool operation
  • Basic structural engineering
  • Concrete sculpting
  • Power saws
  • OSHA protocols
  • Hand tool operation
  • Inventory management
  • Finishing techniques
  • Site preparation
  • Concrete polishing
  • Jointers and edgers
  • Concrete pouring
  • Retaining walls
  • Trowel machinery
  • Countertop construction
  • Rebar installation
  • Bull floats
  • Commercial construction experience
  • Pitch and depth correction
  • Surface preparation
  • Cement and pavement
  • Job proposal estimation
  • Hand tools operation
  • Surface curing methods

Timeline

Concrete Finisher

Scollon Contractractors

Union Laborer

JJ Dougherty

Concrete Laborer

Austin Contractor Services

Graduated - General

Northeast Catholic
Peter McGinley