Concrete Form Setter Finisher Self Employed | 2010 - 2019
Gained proficiency in various form systems utilized throughout the industry, enabling seamless transitions between different project types or requirements.
Reduced waste on job sites by carefully managing material inventory and implementing strategic recycling efforts where appropriate.
Ensured accuracy in form alignment with the use of precise measuring tools and techniques.
Developed strong relationships with coworkers, fostering a positive work environment that encouraged teamwork and collaboration.
Show Description
Trainer System Pavers | 2006 - 2009
Delivered onboarding sessions covering installation standards, safety procedures, and customer communication.
Trained field teams on paver systems, materials, and jobsite expectations.
Coached new hires on workflow processes, tools, and quality requirements.
Developed training materials for consistent instruction across crews and departments.
Show Description
Foreman Dont Remember | 2003 - 2005
Supervised daily crew activities, ensuring safe work practices and consistent task completion.
Coordinated workflow priorities to keep production schedules aligned with site requirements.
Assigned tasks based on worker skill level, equipment availability, and project deadlines.
Monitored job progress, correcting issues quickly to maintain quality standards.
Show Description
Concrete Form Setter Finisher Self Employed | 1998 - 2002
Installed embeds, anchors, and inserts before concrete pours.
Used hand tools and power tools to assemble form sections efficiently.
Inspected form alignment and corrected defects before concrete delivery.
Cleaned, stripped, and organized reusable form materials for next setup.
Show Description
Concrete Form Setter Finisher Meidling Concrete | 1994 - 1998
Set and aligned concrete forms for walls, slabs, and foundations.
Measured and cut lumber for precise form dimensions and layouts.
Braced formwork to maintain stability during concrete placement.
Read plans and markings to verify elevations, corners, and openings.
Show Description
Form Setter Finisher Self Employed | 1994 - 1996
Adjusted formwork components to accommodate site conditions and design changes.
Reinforced forms with braces and supports to maintain stability during pours.
Removed and cleaned form materials after curing, preparing equipment for reuse.
Maintained safe work practices while handling heavy materials and power tools.
Show Description
Forman Mike Shea Concrete | 1992 - 1994
Supervised concrete crews during forming, pouring, finishing, and cleanup operations.
Coordinated daily work schedules to keep projects moving efficiently and safely.
Verified formwork, rebar placement, and slab preparation before concrete placement.
Trained crew members on proper tools, materials, and concrete installation techniques.
Show Description
Form Setter Finisher Self Employed | 1987 - 1992
Measured and marked form layouts for foundations, walls, and slabs.
Installed and secured formwork using hand tools, levels, and fastening equipment.
Aligned forms to specifications, ensuring proper dimensions and structural accuracy.
Read construction plans to set forms for concrete placement and finishing.
Show Description
Laboer Shea Brothers | 1982 - 1986
Loaded and unloaded materials using forklifts, dollies, and hand tools
Assisted crews with site preparation, cleanup, and debris removal
Maintained safe work areas by following PPE and jobsite safety procedures
Transported supplies, tools, and equipment to support daily operations
Show Description