Summary
Overview
Work History
Education
Skills
Timeline
Generic
Peter Percy

Peter Percy

Edmonton ,Alberta

Summary

Adept at enhancing operational efficiency and quality, my tenure at Hawkers Hauling as a Sandblaster showcased my ability to improve project completion times by mastering surface preparation techniques and abrasive blasting expertise. Renowned for strong communication and teamwork, I consistently met detailed specifications, contributing to a 30% increase in customer satisfaction.

Overview

20
20
years of professional experience

Work History

Sandblaster

(WCT)(Hawkers Hauling)
03.2005 - 01.2025
  • Maintained abrasive blasting equipment and performed minor repairs.
  • Assisted in training new employees on proper sandblasting procedures, ensuring adherence to safety regulations and company policies.
  • Enhanced surface quality by skillfully operating sandblasting equipment on various materials.
  • Maintained a safe and efficient work environment by adhering to safety protocols and proper handling of hazardous materials.
  • Increased customer satisfaction by consistently delivering high-quality results in a timely manner on all assigned projects.
  • Collaborated with team members to complete large-scale projects, streamlining processes for increased productivity.
  • Supported overall company success with a strong commitment to quality workmanship, teamwork, and adaptability in meeting changing demands.
  • Selected surfaces for blasting and masked specific parts.
  • Conducted regular inspections of completed work for quality assurance purposes, identifying areas needing improvement or rework if necessary.
  • Reduced waste and minimized environmental impact through responsible use of materials and recycling practices.
  • Improved overall project efficiency with thorough preparation of surfaces before the sandblasting process began.
  • Set up portable sandblasters and maintained clean and safe work zone.
  • Facilitated clear communication between team members regarding project progress or changes in scope to ensure seamless execution.
  • Reduced downtime by quickly troubleshooting issues with equipment malfunctions or unexpected challenges during the sandblasting process.
  • Contributed to project completion within deadlines by efficiently managing time and resources for sandblasting tasks.
  • Developed expertise in working with diverse materials including metal, glass, wood, and concrete surfaces to achieve desired results per client specifications.
  • Masked, grit blasted or chemically rinsed surfaces to prepare for sandblasting.
  • Maintained accurate records of material usage, project completion timelines, and other relevant data for reporting purposes.
  • Achieved desired surface finishes by selecting appropriate abrasives and adjusting sandblasting techniques as needed.
  • Continuously updated technical knowledge by attending industry seminars and workshops, staying informed about new advancements in sandblasting technology.
  • Contributed to workplace safety improvements, leading training sessions on proper sandblasting gear and practices.
  • Achieved reputation for precision, consistently meeting detailed specifications for surface texture and cleanliness.
  • Maintained high operational standards, conducting regular maintenance and checks on sandblasting equipment.
  • Prepared surfaces for coating or painting, ensuring high-quality finishes with meticulous sandblasting techniques.
  • Improved lifespan of various machinery, applying protective coatings after thorough sandblasting.
  • Optimized resource usage by selecting most effective abrasives for each job, reducing waste and project costs.
  • Reduced project completion times by streamlining sandblasting process for large-scale industrial equipment.
  • Played key role in restoration of historical monuments, carefully removing years of grime without damaging underlying materials.
  • Increased operational efficiency, introducing innovative sandblasting techniques that minimized cleanup time.
  • Enhanced visual appeal of architectural structures, performing delicate sandblasting on variety of surfaces.
  • Supported environmental compliance by implementing dust collection systems during sandblasting operations.
  • Enhanced safety on job sites by rigorously adhering to all health and safety protocols during sandblasting operations.
  • Strengthened client relations, providing timely updates and ensuring projects aligned with expectations.
  • Facilitated team efforts to complete projects ahead of schedule, organizing workflow and tasks efficiently.
  • Smoothed uneven surfaces using sanding equipment to produce high-quality finished products.
  • Streamlined project timelines, effectively managing multiple sandblasting projects simultaneously without compromising quality.
  • Boosted quality and effectiveness by maintaining stamina and hand dexterity to handle any challenge.
  • Assessed job information, technical drawings and requirements to deliver carvings meeting depth and dimension specifications.

Education

Grade 12 - Autobody

Lord Selkirk Secondary Regional High School
Selkirk,Manitoba
01.2000

Skills

  • Strong communication skills
  • Safety trained
  • Adaptable work approach
  • Team coordination
  • Attention to detail focus
  • Surface preparation
  • Forklift driving
  • Organizational skills development
  • Surface preparation techniques
  • Environmental compliance awareness
  • Project scheduling
  • Continuous improvement mindset
  • Task prioritization expertise
  • Deadline-driven mentality
  • Inventory management
  • Grinder operation
  • OSHA compliance
  • Hazardous waste disposal
  • Painting expertise
  • Basic math
  • Preventive equipment maintenance
  • Protective coating application
  • Equipment inspection
  • Conflict resolution strategies
  • Blueprint reading proficiency
  • Lean manufacturing principles
  • Material selection
  • Physical stamina maintenance
  • Problem-solving capacity
  • Worksite cleanliness standards
  • NACE standards
  • Degreasing
  • Shoveling expert
  • Blast equipment operation
  • Proper ventilation maintenance
  • Coating application
  • Respiratory protection usage
  • Air compressor management
  • Nozzle control proficiency
  • Industrial metals
  • Quality assurance monitoring
  • Manual dexterity aptitude
  • Sandblasting safety protocols
  • ISO standards awareness
  • Maintenance and repair
  • Efficient material usage
  • Abrasive blasting expertise
  • Teamwork
  • Teamwork and collaboration
  • Problem-solving
  • Time management
  • Attention to detail
  • Problem-solving abilities
  • Multitasking
  • Reliability
  • Excellent communication
  • Organizational skills
  • Machine operation
  • Active listening
  • Effective communication
  • Adaptability and flexibility
  • Decision-making
  • Planning and execution
  • Structural knowledge
  • Physical strength
  • Relationship building
  • Team building
  • Safety protocols
  • Hand-eye coordination
  • Self motivation
  • Interpersonal skills
  • Work site preparation
  • Repair skills
  • Goal setting
  • Professionalism
  • Blueprint reading
  • Interpersonal communication
  • Tool selection
  • Quality control
  • Heavy equipment safety
  • Time management abilities
  • Continuous improvement
  • Adaptability
  • Written communication
  • Surface finishing
  • Project management
  • Equipment maintenance
  • Professional demeanor

Timeline

Sandblaster

(WCT)(Hawkers Hauling)
03.2005 - 01.2025

Grade 12 - Autobody

Lord Selkirk Secondary Regional High School
Peter Percy